PROPOSED FEE Sample Clauses

PROPOSED FEE. Cost schedules for general services, additional services, and itemized reimbursable expenses if applicable; include an explanation of established fees.
AutoNDA by SimpleDocs
PROPOSED FEE. For the organizational review and employee climate survey, the Institute of Government will provide the services outlined in this proposal including all personnel services, operating supplies, computer time, travel, etc., at cost not to exceed $36,000.
PROPOSED FEE. For the work described above, we propose a Fixed Fee of $ 4,500.00.
PROPOSED FEE. For the work described above, we propose a Fixed Fee of $ 7,500.00.
PROPOSED FEE. Invoicing shall be conducted monthly upon full completion of each Service Item scope of work.
PROPOSED FEE. It is proposed that Tasks listed above will be billed on an hourly-not-to-exceed basis according to the following breakdowns: Task 1: Preconstruction River Corridor Survey $ 7,834 Task 2: Final Design a) Revise 90% Design package $ 12,795 b) 100% Plans and Specifications $ 12,051 Task 3: Permitting
PROPOSED FEE. Professional fee for the Registration under ESIC & EPF Act of Rs. 2,000 for the same.
AutoNDA by SimpleDocs
PROPOSED FEE. Stantec will complete the scope described above on a time & materials basis as described below, which includes reimbursable expenses (mileage, travel, etc.). The final fees and expenses invoiced will be based on the level of effort required to complete the work. Regulatory agency wetland permit application fees, if applicable, will be the responsibility of the City. Design Task 1. Project Management and Planning $ 23,547.00 Task 2. Hydrologic & Hydraulic Modeling $ 43,326.00 Task 3.1. Detail Design (60%) $ 63,410.00 Task 3.2. Detail Design (90%) $ 51,086.00 Task 3.3. Detail Design (100%) $ 30,780.00 USACE Permitting Task 4. Nationwide Permitting $ 31,894.00 Soil and Foundation From Phase 1: Preliminary Geotech Report $ - Task 6.3. Soil Stability Analysis $ 33,000.00 Design Field Survey Task 6.1. Detailed Topographic Survey $ 19,459.00 Bid and Construction Services Task 5.1. As-Needed Bid Phase Services $ 13,183.00 Task 5.2. As-Needed Construction Phase Services $ 37,330.00 ROW/Easement Acquisition Task 6.2. Easements (Easements) $ 14,300.00 Additional Services Task 6.4. As-needed services $ 24,888.00 Misc. Expenses (Reimbursable) $ 6,100.00 590 -10814000 600 To W Arbrook Rd 610 F13SL0065 610 City of Arlington 224701101 XXXX Xxxxxx Park Sanitary Sewer Xxxx Xxxxxxxxxx XXXX00000 600 000 #0 #0#0 #0#0 X00XX0000 600 600 X00XX0000 T. of Arlington, Tarrant Co., TX $ $ Prepared by RAW on 2019-10-31 TR by KB on 2019-11-01 IR Review by ABC on 2019-XX-XX F13SL0375 3853000 SHARED CLEAN-OUT 000 600 610 #0 #0 #0#0 #0 #0#0#0 600 610 600 F13SL0083 F13SL0060 600 Xxxx Xxxxx Xxxxxxxxxx Xxxx Xxxxx Centerline: Offset by 75 FT 3853000 620 #0 Existing Service Connection Existing Water Line Proposed Water Line To be removed/abandoned (Line) X00XX0000 \\US1566-F01\shared_projects\224701101\6.0 Design\6.3 Reference Materials\6.3.1 GIS Data\arcmap\Hooper_Park_proposed_gravity_alt1b.mxd Revised: 2020-03-02 By: owenno 570 F13SL0076 Xxxxxx Xxxx 590 F13SL0080 F13SL0460 F13SL0079 F13SL0059 590 F13SL0422 To remain (Line) 620 To be removed/abandoned (MH) To remain (MH) Line Manhole (MH) 590 600 600 590 580 Xxxxxxx Xxxx xxx Xxxx Xxxxxxxxxx X Creek Crossings 580 600 Existing Taps Proposed Taps ★ Project Location 600 600 600 000
PROPOSED FEE. Stantec will complete the scope described above on a time & materials basis for an estimated Not to Exceed (NTE)fee of $ 400,000, which includes reimbursable expenses (mileage, travel, etc.). The final fees and expenses invoiced will be based on the level of effort required to complete the work. Regulatory agency wetland permit application fees, if applicable, will be the responsibility of the City.
PROPOSED FEE. The proposed fee is shown in Attachment 1. SPECIALTY AUTOMATED PEOPLE MOVER (APM) and PASSENGER RAIL SYSTEMS CONSULTING SERVICES CONRAC FEASIBLILITY STUDY PROPOSED BUDGET ORLANDO INTERNATIONAL AIRPORT 1 CONRAC LOCATION OPTION PLANNING 24 24 0 24 4 76 $17,636.00 2 SOUTH APM EXTENSION PLANNING 176 172 48 24 100 4 524 $131,076.00 2.1 APM Alignment Geometry 24 24 24 72 $17,304.00 2.2 Ridership Forecast 24 8 20 52 $12,380.00 2.3 APM Support Facility Consideration 24 8 24 24 80 $18,104.00
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!