Roofing Requirements Sample Clauses

Roofing Requirements. The installation of PV modules, inverters and other equipment shall provide adequate room for access and maintenance of existing equipment on the building roofs. A minimum of three feet of clearance will be provided between PV equipment and existing mechanical equipment and other equipment mounted on the roof. Clearance guidelines of the local fire marshal shall be followed. The installation of solar systems will be reviewed for code compliance and adherence to the California State Fire
AutoNDA by SimpleDocs
Roofing Requirements. The installation of solar systems of roof tops will be reviewed by the DSA for code compliance by adherence to the State Fire Marshal Solar Photovoltaic Installation Guideline. The PV equipment shall not be installed in a way that obstructs air flow into or out of building systems or equipment. Proposed roof top mounted systems may be ballasted or penetrating systems and must meet or exceed the following requirements: 31.2.1 Systems shall not exceed the ability of the existing structure to support the entire solar system and withstand increased wind uplift and seismic loads. The capability of the existing structure to support proposed solar systems shall be verified by Desiger/Builder prior to design approval. 31.2.2 Roof penetrations, if part of the mounting solution, shall be kept to a minimum. 31.2.3 Designer/Builder shall perform all work so that existing roof warranties shall not be voided, reduced, or otherwise negatively impacted. 31.2.4 No work shall compromise roof drainage, cause damming or standing water or cause excessive soil build-up. 31.2.5 All materials and/or sealants must be chemically compatible. 31.2.6 Thermal movement that causes scuffing to the roof must be mitigated as part of the mounting solution. 31.2.7 All roof penetrations shall be waterproofed. 31.2.8 All roofing work shall be performed by a licensed roofing contractor who is certified by the roofing materials manufacturer for the specific materials or systems comprising each roof upon which a solar system will be installed.
Roofing Requirements. The installation of PV modules, inverters and other equipment shall provide adequate room for access and maintenance of existing equipment on building roofs. Unless applicable law requires or the Department mandates a greater distance, (i) a minimum of three
Roofing Requirements. The installation of PV modules, inverters and other equipment shall provide adequate room for access and maintenance of existing equipment on the building roofs. A minimum of three feet of clearance will be provided between PV equipment and existing mechanical equipment and other equipment mounted on the roof. A minimum of four feet of clearance shall be provided between PV equipment and the edge of the roof. Clearance guidelines of the local fire marshal shall be followed. The installation of solar or thermal systems will be reviewed for code compliance and adherence to the State Fire Marshal Solar Photovoltaic Installation Guideline. The PV equipment shall not be installed in a way that obstructs air flow into or out of building systems or equipment. Proposed roof top mounted systems may be ballasted, standing seam attachment, or penetrating systems and must meet or exceed the following requirements:  Systems shall not exceed the ability of the existing structure to support the entire solar system and withstand increased wind uplift and seismic loads. The capability of the existing structure to support proposed solar systems shall be verified by Seller prior to design approval.  Roof penetrations, if part of the mounting solution, shall be kept to a minimum.  Seller shall perform all work so that existing roof warranties shall not be voided, reduced, or otherwise negatively impacted. As part of the design submittals, Seller shall include signed certificates from the roofing manufacturer stating: o The roofing contractor is certified installer of Complete Roofing System. o The manufacturer’s Technical Representative is qualified and authorized to approve project. o Project Plans and specs meet the requirements of the warranty of the Complete Roofing System for the specified period. o Existing warranty incorporates the new roofing work and flashing work.  No work shall compromise roof drainage, cause damming or standing water or cause excessive soil build-up.  All materials and/or sealants must be chemically compatible.  All penetrations shall be waterproofed.  Detail(s) for the sealing of any roof penetrations shall be approved in writing to the Purchaser, as well as the manufacturer of the existing roofing system, as part of system design review and approval – prior to Seller proceeding with work. The Purchaser will make available the roofing manufacturer for each building for consultation with Seller as part of the design process.  Any damage to...

Related to Roofing Requirements

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Testing Requirements 12.1. Workplaces - 12.2. On workplaces where the value of the Commonwealth’s contribution to the project that includes the building work is at least $5,000,000, and represents at least 50% of the total construction project value or the Commonwealth’s contribution to the project that includes the building work is at least $10,000,000 (irrespective of its proportion of the total construction project value) the following minimum testing requirements must be adhered to.

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Bonding Requirements The Contractor is required to furnish a performance bond on the form in a form acceptable to the City, in a sum of not less than [insert bonding level] of the annual amount of the contract to guarantee the faithful performance of this contract. The bond must be approved as to sufficiency and qualifications of the surety by the Controller.

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • Trunking Requirements The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Training Requirements Grantee shall: A. Authorize and require staff (including volunteers) to attend training, conferences, and meetings as directed by DSHS; B. Appropriately budget funds in order to meet training requirements in a timely manner, and ensure that staff and volunteers are trained as specified in the training requirements listed at xxxxx://xxx.xxxx.xxxxx.xxx/hivstd/training/ and as otherwise specified by DSHS. Grantee shall document that these training requirements are met; and C. Ensure that staff hired for HIV and syphilis testing are trained to perform blood draws within three (3) months of employment.

  • Credentialing Requirements Registry Operator, through the facilitation of the CZDA Provider, will request each user to provide it with information sufficient to correctly identify and locate the user. Such user information will include, without limitation, company name, contact name, address, telephone number, facsimile number, email address and IP address.

  • Screening Requirements Practitioner shall ensure that all prospective and current Covered Persons are not Ineligible Persons, by implementing the following screening requirements. a. Practitioner shall screen all prospective Covered Persons against the Exclusion List prior to engaging their services and, as part of the hiring or contracting process, shall require such Covered Persons to disclose whether they are Ineligible Persons.‌ b. Practitioner shall screen all current Covered Persons against the Exclusion List within 30 days after the Effective Date and on a monthly basis thereafter.‌ c. Practitioner shall require all Covered Persons to disclose immediately if they become an Ineligible Person.‌ Practitioner shall maintain documentation in order to demonstrate that Practitioner: (1) has checked the Exclusion List (i.e., a print screen of the search results) and determined that its Covered Persons are not Ineligible Persons; and (2) has required its Covered Persons to disclose if they are an Ineligible Person. Nothing in this Section III.D affects Practitioner’s responsibility to refrain from (and liability for) billing Federal health care programs for items or services furnished, ordered, or prescribed by an excluded person. Practitioner understands that items or services furnished by excluded persons are not payable by Federal health care programs and that Practitioner may be liable for overpayments and/or criminal, civil, and administrative sanctions for employing or contracting with an excluded person regardless of whether Practitioner meets the requirements of Section III.D.

  • Posting Requirements Seller shall post the Development Security in accordance with the following terms and conditions: (i) Seller shall post one-half of the Development Security within thirty

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!