Schematic Design Application Sample Clauses

Schematic Design Application. Once a Major Phase Application is approved, the vertical developer must submit Schematic Design Applications for buildings. Each building (or in the case of smaller structures or town homes, each cluster of such smaller structures) will require a separate Schematic Design Application to be reviewed and approved by the Authority. To facilitate architectural diversity, schematic designs for buildings will be designed by a variety of design architects and, at a minimum, no single architectural firm will design more than 50% of individual buildings (or clusters of smaller structures) in a single Major Phase. The Schematic Design Application will include site plans, sections, elevations, renderings, landscape plans, and exterior material samples to illustrate the overall concept design of the proposed buildings. The Schematic Design Application will also need to discuss how the design will meet the green building standards defined for the Project in the DDA.
AutoNDA by SimpleDocs

Related to Schematic Design Application

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • SCOPE & APPLICATION 5.1 This Agreement shall apply in the state of Victoria to: ⮚ The company in respect to all of its employees engaged in building and construction work as defined by the award. ⮚ Employees of the company who are engaged in any of the occupations, callings or industries specified in the award. ⮚ The CFMEU (Building Unions Division and FEDFA Division) Victorian Branch.

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • APPLICATION/SCOPE 1.1 This collective agreement shall be applicable to every person who requires a teacher certificate as a condition of employment with the School Division excepting those positions agreed to be excluded in local bargaining between the School Division and the Association. Effective March 4, 2020, clause 1.1 above is repealed and replaced by the following clause:

  • Application for Use a. The Employer agrees to accept properly executed leave applications within six (6) months of the first day of the period of leave being requested.