STATEMENT OF THE WORK Sample Clauses

STATEMENT OF THE WORK. The Contractor shall furnish all labor and materials and shall execute the entire Work described below:
AutoNDA by SimpleDocs
STATEMENT OF THE WORK. 2.01 Subject to paragraph 3.02 below, Contractor shall prosecute and complete the Work in accordance with the schedule and as more fully described in Section 01100, paragraphs 1.13 and 1.14. 2.02 Owner will occupy premises during the entire construction period for conduct of normal operations. Cooperate with Owner in scheduling operations to minimize conflict and to facilitate Owner’s usage on the basis of the completion dates on the indicated schedule based on the Owner’s occupancy of areas. See Section 01100. 2.03 The Contractor specifically acknowledges that it has read and understands the requirements of the General Conditions, Section 00700, Parts 7 and 8 relating to Changes, including the requirements to provide timely notice, keep daily records, and submit documentation. Contractor further acknowledges that failure to comply with any of these requirements will result in rejection of claims as set forth in paragraph 7.01 B.5. General Contractor’s Initials _
STATEMENT OF THE WORK. The Contractor shall furnish and provide all labor, equipment, and materials and perform all Work for the Project in strict accordance with the Contract Documents.
STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by dated , 2021 for Board of Education, , including the following addenda: A listing of the plans and specifications included in the Contract Documents is attached as Exhibit A. 2.2 The Parties agree that the Project shall include the following alternates: 2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: 2.4 The Parties agree that the following allowances are included in the Contract Sum in Section 5.1 below: 2.5 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents. 2.6 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".
STATEMENT OF THE WORK. 2.01 Contractor shall prosecute and complete the Work in accordance with the schedule. 2.02 Owner will occupy premises during the entire construction period for conduct of normal operations. Contractor shall cooperate with Owner in scheduling operations to minimize conflict and to facilitate Owner’s usage on the basis of the completion dates on the indicated schedule based on the Owner’s occupancy of areas. 2.03 The Contractor specifically acknowledges that it has read and understands the requirements of the General Conditions relating to Changes, including the requirements to provide timely notice, keep daily records, and submit documentation. Contractor further acknowledges that failure to comply with any of these requirements will result in rejection of claims.
STATEMENT OF THE WORK. 2.1 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary to fully and properly perform and complete the Services and Work as required by the Contract Documents. 2.2 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred there from, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the Contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".
STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by SfL+a Architects dated January 21, 2019 for Moore County Board of Education, including the following addenda: Addendum #1, dated February 8, 2019 Addendum #2, dated February 19, 2019 2.2 The Parties agree that the Project shall include the following alternates: Alternate 2A - $0 Alternate 2B - $0 Alternate 2C - $0 Alternate 2D - $0 Alternate 2E- $0 Alternate 3B - $3,000 Alternate 3C - $0 Alternate 4 - $0 Alternate 5 - $0 Alternate 7 - $0 Alternate 9 - $10,000 Alternate 12 - ($17,000) Alternate 13 - ($18,000) 2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: • Reduce in-project allowance by $100,000 leaving $300,000 • Change stormwater pipe from Class 4 to Class 3 – ($35,000) • Eliminate the learning commons on the lower level - ($150,946) • Substitute plain sawn red oak doors for rift cut red oak doors – ($6,900) • Substitute sand based mortar for colored mortar – ($22,000) • Revise brick Patter to running bond – ($100,000) • Remove corridor built-in benches – ($25,600) • For terrazzo pattern TZ-1 use local marble – ($81,200) • Provide Alsco aluminum soffits in 0.19 thickness – ($12,600) • Remove Sika coating in the kitchen area – ($3,831) • Revise 4" half-high CMU in Gym and Corridors to 4" full height – ($23,000) • Remove dishwasher duct – ($3,000) • Revise requirements for SZVAV and dual point power on WSHP 301, 501, 503, 508A and 508B to 2-speed fan and single power – ($17,000) • Substitute polymer pans for stainless steel pans at all WSHP – ($5,000) • Revise lighting fixtures as proposed by other manufacturers – ($68,000) • The total for the above noted items is ($654,077) 2.4 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents. 2.5 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the c...
AutoNDA by SimpleDocs
STATEMENT OF THE WORK. 1. GTK will provide to the Company with a separate order/attachment specified geological samples for re-analysis (as attached hereto). a. Extraction of samples from archives is chargeable service, where’s applied GTK’s General Terms of Contract (appendix 2.) b. Schedule for delivery of sample material will be agreed separately c. Company may use max. ½ of drill core or max g of sample material, which will be agreed on the basis of analytical methods and generating data. At least ¼ of drill core or minimum of 10 g of sample material need to be left for GTK’s archives. The remaining sample material should be returned to GTK within 6 months in case of drill core material and within 2 months in case of till geochemistry samples. 2. Company will take care of the transport costs for the sample materials to the laboratory chosen by the Company and back to GTK 3. Company will provide the results of the analyses (”data”) to GTK at least in six (6) months from the date of dispatch of the sample materials to Company’s use according to this Agreement. a. The data will be provided to GTK in the original format of the laboratory and with metadata in standard format (methodology etc.) 4. GTK will include the data as part of its public geodatabase after 24 months has passed from delivery of sample material. a. during the 24 months the data will kept confidential and be used in GTK only for research purposes, any potential publications are to be agreed separately b. The ownership to the data remains with the Company and GTK will have a perpetual, irrevocable, parallel full license to use it including the right to transfer, share and re-use in an unlimited way.
STATEMENT OF THE WORK. 1. GTK will provide to the Company with a separate order/attachment specified geological samples for re-analysis (as attached hereto). a. Extraction of samples from archives is chargeable service, where’s applied GTK’s General Terms of Contract (appendix 2.) b. Schedule for delivery of sample material will be agreed separately c. Company may use max. ½ of drill core or max g of sample material, which will be agreed on the basis of analytical methods and generating data. The remaining sample material should be returned to GTK within 6 months in case of drill core material and within 2 months in case of till geochemistry samples. 2. Company will take care of the transport costs for the sample materials to the laboratory chosen by the Company and back to GTK 3. Company will provide the results of the analyses (”data”) to GTK at least in six (6) months from the date of dispatch of the sample materials to Company’s use according to this Agreement. a. The data will be provided to GTK in the original format of the laboratory and with metadata in standard format (methodology etc.) 4. GTK will include the data as part of its public geodatabase after 24 months has passed from delivery of sample material. a. during the 24 months the data will kept confidential and be used in GTK only for research purposes, any potential publications are to be agreed separately b. The ownership to the data remains with the Company and GTK will have a perpetual, irrevocable, parallel full license to use it including the right to transfer, share and re-use in an unlimited way.
STATEMENT OF THE WORK. 1.1 Seedlings shall be sown, grown, sorted, and packaged for shipment by seed lot.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!