Surface Cleaning Sample Clauses

Surface Cleaning. Once in 15 days and as & when • All glasses at entrance doors and windows of the required / as directed. premises would be cleaned using damp and dry method. • Glass table tops, cabin doors, cabin partitions and glass accessories would also be cleaned. • Removal of grease marks or fingerprints on glass counters and partitions. This cleaning is done using approved all-purpose cleaner and lint free cloth or paper towels.
AutoNDA by SimpleDocs
Surface Cleaning. Any areas modified by chipping or hammering shall be cleaned with high pressure water at 7,500 psi minimum to remove any bond-breaking residue, loose concrete, and any deleterious material. This material shall be collected and disposed of by the contractor. Any areas of the prepared surface contaminated by oil or other materials detrimental to good bond as a result of the contractor’s operations shall be cleaned at the contractor’s expense. Removal of concrete debris shall be accomplished either by hand or mechanical means capable of removing wet debris and water in the same pass and after the hydro-demolition process to prevent debris from setting or adhering to the surface of the sound concrete. All concrete debris shall become the property of the Contractor and shall be legally disposed of at the contractor’s expense. The contractor shall be responsible for disposing of all debris generated by the scarification and hydro-demolition operations. Any debris which is allowed to set or adhere to the surface of the sound concrete shall be carefully removed at no additional cost. Exercise care to avoid any damage to the remaining sound concrete or exposed reinforcement
Surface Cleaning. All surfaces subject to spills and/or routine cleaning shall be compatible with disinfectant solutions that may contain up to 10% bleach.
Surface Cleaning. Clean the area to be repaired by abrasive blasting, high-pressure water blasting, or other approved methods. Remove all loose particles, dirt, deteriorated concrete, or other substances that would impair the bond of the repair material. Clean exposed reinforcing steel of concrete, rust, oil, and other contaminants. Follow this with a high-pressure air blast for final cleaning.
Surface Cleaning. Contractor is required to wash the interior of ALL TANKS (NO PRESSURE WASHING). Each tank is required to be inspected and cleaned at each service interval. No Deep Cleaning, No Hydro Jetting, No Lift Station Cleaning.
Surface Cleaning. PEM-6666-0 TECHNICAL SPECIFICATION FOR RATE CONTRACT OF CHAIN PULLEY BLOCKS SPECIFICATION NO. PE-TS-RC-563-A101 SECTION -I PEM-6666-0 TECHNICAL SPECIFICATION FOR RATE CONTRACT OF CHAIN PULLEY BLOCKS SPECIFICATION NO. PE-TS-RC-563-A101 SECTION I PEM-6666-0 Sl. No. BHEL XXX.XX DRAWING TITLE REMARKS SUBMISSION SCHEDULE ‐ WEEK NUMBER FROM DATE OF P.O 1 PE‐V0‐RC‐563‐A101 "GA Drawing for Chain Pulley Block with detail BOM with painting details For Customer's approval 2 2 PE‐V0‐RC‐563‐A102 Manufacturing Quality Plan For Customer's approval 2 3 PE‐V0‐RC‐563‐A104 Erection procedure For BHEL's approval 4 4 PE‐V0‐RC‐563‐A103 O & M Manual For BHEL's approval 4 5 PE‐V0‐RC‐563‐A106 Mandatory spare parts list (if applicable) For Customer's approval 3
Surface Cleaning. Surficial cleaning of non-porous or semi-porous surfaces showing visible mold-growth will be conducted using a detergent solution. Surfaces to be treated will be cleaned and an anti-microbial coating (Xxxxxx 40-20 or equivalent) applied to the surface. The anti-microbial coating will be applied following sufficient dry time for the detergent solution. Wood baseboards and wall studs showing visible mold-growth will be cleaned by washing with a detergent solution and applying an anti-microbial coating. Stained areas may be lightly sanded prior to the application of the anti-microbial coating.
AutoNDA by SimpleDocs
Surface Cleaning. The metal surfaces shall be cleaned by one or more of the nine surface methods listed below to obtain a white metal surface or minimum requirements of paint Contractor. The following list of visual standards for cleaning steel structures is as established by the Steel Structures Painting Council.
Surface Cleaning.  Polish all bright metal work using an approved metal cleaner/polish.

Related to Surface Cleaning

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Landscaping The Owner will, before its plan of subdivision is released for registration, pay to the Town in lieu of planting any trees on the public streets within the plan, the amount shown for the purpose upon Schedule “J”.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!