Sustainable Design Status: LEED® Platinum Requirement. Developer shall design the Project so that, at a minimum, the Project shall achieve LEED® “Platinum” certification under the LEED® Rating System known as “LEED for Homes: Multifamily Mid- Rise, October 2010, CA Version, 2011 Update” (the “Sustainable Design Status”). Developer shall retain the services of a LEED accredited professional to consult with Developer regarding inclusion of sustainable design features for the Project. Developer shall confirm to the City that the design for the Project has achieved the Sustainable Design Status in accordance with the following requirements: (a) Prior to the submission of plans for Architecture Review Board review, Developer shall submit a preliminary checklist of anticipated LEED® credits (that shall be prepared by the LEED® accredited professional) for review by the City, along with a narrative to demonstrate that the Project is likely to achieve the Sustainable Design Status. (b) Prior to submittal of the plan check application for the Project, Developer shall: (1) Submit for review by the City and updated checklist of anticipated LEED® credits along with a narrative describing the project’s sustainable features to demonstrate that the Building is likely to achieve the Sustainable Design Status (2) Retain the services of a third party, independent individual designated to organize, lead, review, and complete the process of verifying and documenting that a building and all of its systems and assemblies are planned, designed, installed, and tested to meet the Building’s requirements (the “Commissioning Authority”) (3) Submit a Commissioning Plan which includes the elements specified in California Code of Regulations Title 24, Part 11, Section 5.410.2.3 or any successor thereto (c) Prior to issuance of a final Certificate of Occupancy for the Project, the City shall verify (which verification shall not be unreasonably withheld, conditioned or delayed) that the Project has achieved the Sustainable Design Status. (d) Notwithstanding the foregoing, if the City has not verified that the constructed Project has achieved the Sustainable Design Status, the City shall nonetheless issue a temporary Certificate of Occupancy for the Project (assuming that the Project is otherwise entitled to receive a temporary Certificate of Occupancy). The temporary Certificate of Occupancy shall be converted to a final Certificate of Occupancy (assuming that the Project is otherwise entitled to receive a final Certificate of Occupancy) onc...
AutoNDA by SimpleDocs

Related to Sustainable Design Status: LEED® Platinum Requirement

  • Public Posting of Approved Users’ Research Use Statement The PI agrees that information about themselves and the approved research use will be posted publicly on the dbGaP website. The information includes the PI’s name and Requester, project name, Research Use Statement, and a Non-Technical Summary of the Research Use Statement. In addition, and if applicable, this information may include the Cloud Computing Use Statement and name of the CSP or PCS. Citations of publications resulting from the use of controlled-access datasets obtained through this DAR may also be posted on the dbGaP website.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Conditions & Requirements

  • Certification Regarding Prohibition of Boycotting Israel (Tex Gov. Code 2271)

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Developer Operating Requirements The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxx Xx. Xxxxx Xxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. NYISO:

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • System for Award Management (XXX) Requirement Alongside a signed copy of this Agreement, Grantee will provide Florida Housing with a XXX.xxx proof of registration and Commercial and Government Entity (CAGE) number. Grantee will continue to maintain an active XXX registration with current information at all times during which it has an active award under this Agreement.

  • Optional Xactimate Response Attachment (Part 2)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!