System Test. Pathnet shall (i) perform an end-to-end Bit Error Rate test of the message one radio for a 24-hour period and an end-to-end Bit Error Rate test of the protect radio for 1 hour, (ii) verify equipped channel units through microwave system, (iii) verify performance of Order Wires and Wayside Channels, and (iv) verify performance of the alarm points function throughout the System.
System Test. SPECIFICATION 1. The Seller shall send to CCG his released System test specification for the Type under test.
System Test. Section 7 of this document provides a step-by-step procedure for complete final factory test of the 3.5 MeV Industrial Linear Accelerator X-ray System. It is assumed that complete system checks out, debug and calibration has been accomplished prior to the start of this test. Although the test steps have been placed in logical sequence, it is not a requirement of this test to perform the test steps in that order. All data must be entered in ink. No erasures or “white-outs” are allowed. No writeovers are to be used when correcting errors. Entries may be lined out, initialed, and new data entered with appropriate explanation on the same page.
System Test. Parent Group and Tronox Group shall test each IT System for successful functionality and shall use commercially reasonable efforts to demonstrate functionality consistent with historical functionality. Such testing shall be conducted by Parent Group and Tronox Group in cooperation with each other and results of such testing, accompanied by proposed follow-up action, shall be shared by the Tronox Group and Parent Group. In the event that such tests and demonstrations are not deemed successful, the parties’ obligations under this paragraph shall continue, and such tests shall be repeated at intervals of not more than 15 days, until such time as such tests are successful. The parties agree that a test of an IT System shall be deemed successful when such IT System operates, on a stand-alone basis, in a manner consistent with its operation immediately prior to the Closing Date. Once such tests are deemed successful in accordance with the terms of this paragraph, Parent Group’s obligations under Section 2 of this Exhibit A shall terminate.
System Test. Plans Prepared for each phase of testing identified above for both MVP and Phase 2, each test plan must include: • Test cases • Test scripts • Data sheets • Expected results ✓ Agency-accepted DED. ✓ Deliverable contains all criteria agreed-upon in the DED. ✓ System Test Plans identify tests to be completed during MVP and Phase 2. ✓ Agency PM approval.
System Test. 35 h. Onsite Integration..............................................................35
System Test. A. Prior to the final acceptance of each phase of construction and at total completion of project, this Contractor shall conduct an operating test of the complete system. The system must test free from grounds, shorts, and other faults. The system shall provide ten (10) dBmV (+/- 5 dBmV) at each outlet when a signal of 50 DBMV is applied from the headend cable. This Contractor shall inform the Owner of any slope injected into the system during testing. All connections shall be thoroughly checked for mechanical and electrical connections. All equipment shall be demonstrated by this Contractor to operate in accordance with the requirements set forth in these Specifications and shown on the Drawings.
B. This Contractor shall perform all tests in the presence of the Architect/Engineer. This Contractor shall furnish all personnel and test instruments required for use in the test, including signal generator and amplifier. This contractor is not permitted to use building CATV headend equipment for testing purposes.
C. The maximum deviation of drop signals between 50 and 860 MHz (slope) shall not exceed fifteen (15) dBmV. This Contractor shall furnish to the Owner, in the final test documents, the exact slope setting used. Upon request of the owner this contractor shall test the bi-directional system at a maximum of five (5) locations, selected by the owner, to show compliance.
System Test. Purpose: The System Test deliverable documents the results of the SCORE II system test. Updated: No Dependents: Updated Test Plan Specification: This deliverable will consist of but is not limited to:
a. A listing of the system test cycles executed and current status including:
i. A description of testing environment ii.Test case and scope description iii.Expected results
System Test. The term “
System Test. Execution – The Contractor’s System Test shall utilize “real” data, and shall be performed by the Contractor or a third party. The Contractor’s System test shall be intended to demonstrate the critical business functions of the Contractor’s System and the overall effectiveness of the User-facing aspects. The Contractor shall provide and the State shall accept the System Test Plan before it is executed. The Contractor shall incorporate the following activities during System Testing:
i. Demonstrate Critical Business Function Scenarios (as defined by and approved by the State) – data and processes must be fully integrated across functional areas and that integration fully demonstrated.
ii. Transaction Testing (as defined by and approved by the State).
iii. Error Message Testing.