The Atlas Copco Sample Clauses

The Atlas Copco. Compressors Australia wage rates comprises the Atlas Copco Australia weekly wage rate plus an amount per week made up of $5.00 per day “Site” Allowance plus $2.00 per week “Disability” allowance indexed since it’s inclusion. This was agreed and included in the total weekly pay figure in the 1994 Enterprise Agreement.
AutoNDA by SimpleDocs

Related to The Atlas Copco

  • WTO GPA DR-CAFTA. —NAFTA. —U.S.-Australia FTA. —U.S.-Bahrain FTA. —U.S.-Chile FTA. —U.S.-Morocco FTA. —U.S.-Oman FTA. —U.S.-Peru TPA. —U.S.-Singapore FTA. —

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Mobile Gas Service Corp 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348 (1956) , and clarified by Xxxxxx Xxxxxxx Capital Group, Inc. v.

  • Unbundled Copper Loop Designed (UCL-D)

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • THE ACADEMY 2.1 The Company will establish and maintain, and carry on or provide for the carrying on of the Academy in accordance with the Master Agreement and this Agreement.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.

  • Washtenaw Community College Eastern Michigan University Xxxxxx Xxxxxxxxxx College of Engineering & Technology Student Services BE 214 xxx_xxxxxxxx@xxxxx.xxx; 734.487.8659 734.973.3398

  • Charter Schools A. Notification to Polk Education Association

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!