Traffic and Construction Control Plan Sample Clauses

Traffic and Construction Control Plan. Prior to the start of construction, the Applicant will provide the ANC, Parkside Civic Association and Mayfair Tenant’s Association, for review and comments, a draft Site Utilization Plan for construction detailing construction staging and truck routing. The Applicant will work with the ANC to address and incorporate comments to the Site Utilization Plan, to the extent feasible, that mitigate community concerns. The Applicant will prioritize the use of Kenilworth Terrace, NE for all construction traffic in the Site Utilization Plan to minimize the impact to the surrounding residential communities located off Parkside Place, NE. At each construction entrance, a flagman, as required, will be positioned to direct the flow of construction traffic and to maintain the public’s safety.
AutoNDA by SimpleDocs
Traffic and Construction Control Plan. All ingress and egress for development will be from streets approved by the D.C. Department of Transportation pursuant to an approved traffic control plan. At no time will trucks be permitted to queue or idle on residential streets. During construction, a flagman will be positioned to direct the flow of construction traffic and to maintain the public’s safety.
Traffic and Construction Control Plan. Prior to the start of construction, the Developer shall provide ANC 7D and the River Terrace Civic Organization for review and comments, a draft Site Utilization Plan for construction detailing construction staging and truck routing. The Developer shall work with ANC 7D to address and incorporate comments to the Site Utilization Plan, to the extent feasible, that mitigate community concerns. In preparing the Site Utilization Plan, the Developer shall prioritize the use of Xxxxxxx Road, NE and the alley to the North of the Property for construction traffic, in order to minimize potential negative impacts to the surrounding residential community. At each construction entrance, a flagman, as required, shall be positioned to direct the flow of construction traffic and to maintain the public’s safety.

Related to Traffic and Construction Control Plan

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • COMPENSATION FOR CONSTRUCTION PHASE SERVICES 5.1 For the Construction Manager’s performance of the Work as described in Section 2.3, the Owner shall pay the Construction Manager the Contract Sum in current funds. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager’s Fee.

Time is Money Join Law Insider Premium to draft better contracts faster.