TREE PLANTINGS Sample Clauses

TREE PLANTINGS. 25.1 In order to maintain a high standard of amenity and appearance, the Developer, its heirs, executers, administrators, successors and assigns hereby undertake and agree to retain the maximum number of trees within the lands consistent with good design and conservation practices and the East Fonthill Secondary Plan Area Urban Design Guidelines and to provide tree plantings in accordance with the approved Streetscaping Plan to the satisfaction of the Director of Public Works in accordance with the following: a) one (1) tree per Lot and two (2) trees per side yard flankage shall be planted in the sodded/hydroseeded portion of the street allowance between the Front Lot Line and the roadway in accordance with the Plans. Trees shall be sound, healthy, vigourous and free from disease with normally healthy root systems; and, b) trees should be 50mm caliper, balled and burlapped at planting. 25.2 In accordance with Schedule “F” annexed hereto, prior to registration of this Agreement by the Town, the Developer shall provide security in the form of a Letter of Credit to the Town for Tree Planting within the subdivision, for the cost of replacing and maintaining trees within the Plan. 25.3 The Developer shall be solely responsible for acquiring and planting trees in accordance with the terms of this Agreement and in accordance with the approved Streetscaping Plan to the satisfaction of the Director of Public Works and shall deliver written notice to the Town that such work has been completed. All trees shall be planted within nine (9) months of occupancy on each respective lot. 25.4 The Developer shall be solely responsible for maintaining all tree plantings in a healthy state on boulevards until such time as Council passes an Assumption By-law. 25.5 Provided, however, that in the event the Developer does not plant trees in accordance with the provisions of this Agreement or within the prescribed time or to the complete satisfaction of the Director of Public Works, then the Town may, at its sole discretion, plant or replace or replant trees in accordance with the provisions of this Agreement and apply the above mentioned security against the Town’s costs and/or collect such costs in like manner as municipal taxes.
AutoNDA by SimpleDocs
TREE PLANTINGS. ‌ 24.1 The Developer agrees to retain the maximum number of existing trees within the Lands consistent with good design and conservation practices. 24.2 Where required by the City and/or the Niagara Peninsula Conservation Authority, the Developer agrees to file a Tree Preservation Plan prepared by a qualified forester and approved by the City and the Niagara Peninsula Conservation Authority. The Developer agrees to implement the approved Tree Preservation and Plant Plan to the complete satisfaction of the City and/or the Niagara Peninsula Conservation Authority. 24.3 In accordance with Schedule “E”, annexed hereto, prior to registration of this Agreement by the City, the Developer shall pay costs for any trees to be planted by the City, as indicated in the approved Landscape Plan. The Developer needs to calculate number of trees as follows: a) One (1) tree per lot b) two (2) trees per corner lot c) one (1) tree per 15 m of front lot. 24.4 The developer pay to the City $500 per tree for the subdivision development. 24.5 In accordance with Schedule “E”, annexed hereto, prior to registration of this Agreement by the City, the Developer shall provide full amount to the City for Tree Planting within the Subdivision. 24.6 That the Developer agrees to implement the approved Addendum to Tree Saving Plan prepared by Xxxxx Resource Group, dated March 17, 2021.
TREE PLANTINGS o Alternate B - 15” Standard Rootwell Pro 318D aeration sleeve (4 per tree) • BID 2: Xxxxxx Park Tree Plantings o Alternate B - 15” Standard Rootwell Pro 318D aeration sleeve (4 per tree) • BID 3: M-5 Median Tree Plantings o Alternate B - 15” Standard Rootwell Pro 318D aeration sleeve (4 per tree) • BID 4: Brookfarm Tree Plantings o Alternate B - 15” Standard Rootwell Pro 318D aeration sleeve (4 per tree) • BID 5: Civic Center Perennial Plantings • BID 6: Wayfinding Sign Perennial Plantings • BID 7: Welcome Sign Perennial Plantings • BID 8: Provision of Shrubs – no installation required
TREE PLANTINGS a) In order to maintain a high standard of amenity and appearance, the Developer, its heirs, executors, administrators, successors and assigns hereby undertake and agree to retain the maximum number of trees within the lands consistent with good design and conservation practices and to pay to the Town the cost of purchasing, planting and maintaining trees within the Plan in accordance with the following: i) One (1) tree per Lot and two (2) trees per sideyard flankage shall be planted in the sodded portion of the street allowance between the Front Lot Line and the roadway in accordance with the Plans. Trees shall be sound, healthy, vigorous and free from disease with normally healthy root systems. ii) Trees shall be 50mm caliper at planting and be of such varieties as Red Maple, White Ash, Green Ash (seedless variety), Red Oak, Linden and Red Spire Ornamental Pear or such other compatible variety, as approved by the Town. b) In accordance with Schedule “F” annexed hereto, prior to registration of this Agreement by the Town, the Developer shall pay to the Town for deposit in the Town’s Tree Planting Reserve Funds, a sum in accordance with Schedule "F" to cover the Town's cost of purchasing, planting and maintaining trees within the Plan. c) The Developer shall file with the Town a Tree Preservation Plan prepared by a qualified forester and approved by the Town and the Ministry of Natural Resources. The Developer agrees to implement the approved Tree Preservation & Plant Plan to the complete satisfaction of the Director of Infrastructure Services and the Director of Community and Development Services.
TREE PLANTINGS. 24.1 The Developer agrees to retain the maximum number of existing trees within the Lands consistent with good design and conservation practices. 24.2 The Developer accommodate the provision of one boulevard tree per lot and two boulevard trees per corner lot and pay to the City $500 per tree for this provision. 24.3 In accordance with Schedule “E”, annexed hereto, prior to registration of this Agreement by the City, the Developer shall provide full amount to the City for Tree Planting within the Subdivision. 24.4 In accordance with Schedule “E”, annexed hereto, prior to registration of this Agreement by the City, the Developer shall pay costs for any future trees to be planted by the City, as indicated in the approved Landscape Plan and/or as indicated in a clause contained in Schedule “G”, annexed hereto.
TREE PLANTINGS. In order to maintain a high standard of amenity and appearance, the Developer, its heirs, executors, administrators, successors and assigns hereby undertake and agree to retain the maximum number of trees within the lands consistent with good design and conservation practices and to deposit a Letter of Credit with the City, to guarantee the total cost of purchasing, planting and maintaining trees within the Plan in accordance with the following:

Related to TREE PLANTINGS

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Procurement of the Site (i) The Authority Representative, the Contractor and Authority’s Engineer shall, within 10 (ten) days of the date of this Agreement, inspect the Site and prepare a detailed memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (hereinafter referred to as the “Handover Memorandum”). Subject to the provisions of Clause 8.2 (iii), the Handover Memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been given to the Contractor along with details of hindrances in the Construction Zone. For sake of clarity the Handover Memorandum shall clearly specify the parts of Site where work can be executed. Signing of the Handover Memorandum, in three counterparts (each of which shall constitute an original), by the authorized representatives of the Authority, Contractor and Authority’s Engineer shall be deemed to constitute a valid evidence of giving the Right of Way to the Contractor for discharging its obligations under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. (ii) Whenever the Authority is ready to hand over any part or parts of the Site included in the Appendix, it shall inform the Contractor, by notice, of the proposed date and time such of hand over. The Authority Representative and the Contractor shall, on the date so notified, inspect the specified parts of the Site, and prepare a memorandum containing an inventory of the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site so handed over. The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to the Contractor. If the contractor fails to join for site inspection or disputes the parts of the site available for work, the Authority’s Engineer shall decide the parts of the site where work can be executed and notify to both the parties within 3 days of the proposed date of inspection. The parties agree that such notification of the Authority’s Engineer as mentioned hereinabove shall be final and binding on the parties. (iii) The Authority shall provide the Right of Way to the Contractor in respect of all land included in the Appendix by the date specified in Schedule-A for those parts of the Site referred to therein, and in the event of delay for any reason other than Force Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor, Damages in a sum calculated in accordance with Clause 8.3. The Contractor agrees that it shall not be entitled to claim any other damages on account of any such delay by the Authority. (iv) Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall specify the parts of the Site, if any, for which Right of Way shall be provided to the Contractor on the dates specified in Schedule-A. Such parts shall also be included in the Appendix prepared in pursuance of Clause 8.2 (i). (v) The Authority further acknowledges and agrees that prior to the Appointed Date, it shall have procured issuance of the statutory notification under Applicable Laws for vesting of all the land comprising the Project in the Authority and has taken possession of area for Construction Zone for at least 90% (ninety per cent) of the total length of the Project Highway. The Parties also acknowledge and agree that the conditions specified in this Clause 8.2 (iii) shall not be modified or waived by either Party. (vi) For the avoidance of doubt, the Parties expressly agree that the Appendix shall in no event contain sections of the Project Highway the cumulative length of which exceeds 10% (ten percent) of the total length of the Project Highway. (vii) Pursuant to signing of Handover Memorandum under clause 8.2 (i), Contractor shall submit to the Authority’s Engineer, a monthly land possession report till expiry of 180 (one hundred and eighty) days from Appointed Date, in respect of those parts of the site to which vacant access and right of way was not given to the contractor and included in Appendix to the memorandum signed under clause 8.2 (i), duly specifying the part of the site, if any, for which the right of way is yet to be handed over.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.

  • Trees 1.1. The Tenant shall not without the written consent of the Council cut or prune any trees, apart from carrying out the recognised pruning practices of fruit trees. 1.2. The Tenant shall not plant any trees other than dwarf fruiting trees and or fruiting bushes without the prior consent of the Council.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!