Trowel Finishing Sample Clauses

Trowel Finishing. Floors that are to be trowel finished shall not contain any material such as chloride except, upon advance notice to the cement xxxxx employee. Chloride shall not be added after the outside temperature is seventy (70) degrees or higher. But in case of rare weather conditions or an emergency, the employee after getting the approval from the xxxxxxx of the job or at the Union Hall, may add the additive.
AutoNDA by SimpleDocs
Trowel Finishing. Floors that are to be trowel finished shall not contain any material such as chloride or pozzilith or any fast-setting materials except upon advance notice to the cement xxxxx employee. Chloride shall not be used if the outside temperature is 70 degrees or above. Safety Equipment. Employees required to use grinding machines shall be furnished respirators, which the EMPLOYER shall sterilize before re-issue to another man. Contractor shall also provide rubber gloves, safety glasses, or any other OSHA approved safety Equipment necessary to perform the work.

Related to Trowel Finishing

  • FABRICATION Making up data or results and recording or reporting them.

  • PIONEERING Pioneering may not extend past construction that will be completed during the current construction season. Pioneering may not extend more than 500 feet beyond completed construction unless approved in writing by the Contract Administrator. In addition, the following actions must be taken as pioneering progresses:  Drainage must be provided on all uncompleted construction.  Road pioneering operations may not undercut the final cut slope or restrict drainage.  Culverts at live stream crossings must be installed during pioneering operations prior to embankment.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

Time is Money Join Law Insider Premium to draft better contracts faster.