Water and Drainage Sample Clauses

Water and Drainage. 6.14.3.1 The Contractor shall provide water necessary for the Work until the permanent plumbing system is available for use. 6.14.3.2 The Contractor shall provide temporary drainage and dewatering necessary for the Work and shall employ pumps, trenches, drains, sumps, and other necessary elements required to provide satisfactory working conditions for the protection, execution, and completion of the Project. 6.14.3.3 The Contractor shall make arrangements and pay for installation and maintenance of temporary plumbing systems until the permanent plumbing system is available for use. 6.14.3.4 When the permanent plumbing system is complete and available for use: .1 The Contractor shall start up and maintain operation of the permanent plumbing systems, and make arrangements and pay for removal of temporary plumbing systems. .2 If the Project consists entirely of new construction, the Contractor shall pay the costs of water consumed and sewerage charges until Final Acceptance, or Partial Occupancy if applicable.
AutoNDA by SimpleDocs
Water and Drainage. 6.12.3.1 The CM shall provide water necessary for the Work until the permanent plumbing system is available for use. 6.12.3.2 The CM shall provide temporary drainage and dewatering necessary for the Work and shall employ pumps, trenches, drains, sumps, and other necessary elements required to provide satisfactory working conditions for the protection, execution, and completion of the Project. 6.12.3.3 The CM shall make arrangements and pay for installation and maintenance of temporary plumbing systems until the permanent plumbing system is available for use. 6.12.3.4 When the permanent plumbing system is complete and available for use: .1 The CM shall start up and maintain operation of the permanent plumbing systems, and make arrangements and pay for removal of temporary plumbing systems. .2 If the Project consists entirely of new construction, the CM shall pay the costs of water consumed and sewerage charges until Substantial Completion. .3 If the Project is a renovation of an existing building or structure, addition(s) to an existing building or structure, or any combination of new construction and renovation work that does not allow separate metering of utilities, the Owner shall pay the costs of water consumed and sewerage charges. 6.12.3.5 From the date of Substantial Completion, the Owner shall pay the costs of water consumed and sewerage charges for the occupied portion of the Project. 6.12.3.6 If the permanent plumbing system is used during construction, the CM shall furnish an extended warranty and service contract in effect until the expiration of the Correction Period.
Water and Drainage. 6.13.3.1 The DB shall provide water necessary for the Work until the permanent plumbing system is available for use. 6.13.3.2 The DB shall provide temporary drainage and dewatering necessary for the Work and shall employ pumps, trenches, drains, sumps, and other necessary elements required to provide satisfactory working conditions for the protection, execution, and completion of the Project. 6.13.3.3 The DB shall make arrangements and pay for installation and maintenance of temporary plumbing systems until the permanent plumbing system is available for use. 6.13.3.4 When the permanent plumbing system is complete and available for use: .1 The DB shall start up and maintain operation of the permanent plumbing systems, and make arrangements and pay for removal of temporary plumbing systems. .2 If the Project consists entirely of new construction, the DB shall pay the costs of water consumed and sewerage charges until Substantial Completion. .3 If the Project is a renovation of an existing building or structure, addition(s) to an existing building or structure, or any combination of new construction and renovation work that does not allow separate metering of utilities, the Owner shall pay the costs of water consumed and sewerage charges. 6.13.3.5 From the date of Substantial Completion, the Owner shall pay the costs of water consumed and sewerage charges for the occupied portion of the Project. 6.13.3.6 If the permanent plumbing system is used during construction, the DB shall furnish an extended warranty and service contract in effect until the expiration of the Correction Period.
Water and Drainage. The Landlord shall monitor water and drainage usage. The Landlord shall provide water and drainage facilities to the Accommodation to the same standard as that provided to the rest of the Landlord’s Premises up to a maximum of 1 CuM per month. Water and drainage usage above this amount shall be charged separately. The Landlord reserves the right to install a water metre.
Water and Drainage. The water from downspouts or other surface water drainage shall be directed to controlled drainage facilities and shall not be drained into or guided into the sanitary sewer system. It shall be the obligation of the owner of each lot to keep and maintain the natural and or man made drainage facilities located thereon clean, open, unobstructed and mowed.
Water and Drainage. 6.14.3.1 The CM shall provide water necessary for the Work until the permanent plumbing system is available for use. 6.14.3.2 The CM shall provide temporary drainage and dewatering necessary for the Work and shall employ pumps, trenches, drains, sumps, and other necessary elements required to provide satisfactory working conditions for the protection, execution, and completion of the Project. 6.14.3.3 The CM shall make arrangements and pay for installation and maintenance of temporary plumbing systems until the permanent plumbing system is available for use. 6.14.3.4 When the permanent plumbing system is complete and available for use: .1 The CM shall start up and maintain operation of the permanent plumbing systems, and make arrangements and pay for removal of temporary plumbing systems. .2 If the Project consists entirely of new construction, the CM shall pay the costs of water consumed and sewerage charges until Final Acceptance, or Partial Occupancy if applicable.
Water and Drainage. 6.14.3.1 The Contractor shall provide water necessary for the Work until the permanent plumbing system is available for use. 6.14.3.2 The Contractor shall provide temporary drainage and dewatering necessary for the Work and shall employ pumps, trenches, drains, sumps, and other necessary elements required to provide satisfactory working conditions for the protection, execution, and completion of the Project. 6.14.3.3 The Contractor shall make arrangements and pay for installation and maintenance of temporary plumbing systems until the permanent plumbing system is available for use. 6.14.3.4 When the permanent plumbing system is complete and available for use: .1 The Contractor shall start up and maintain operation of the permanent plumbing systems, and make arrangements and pay for removal of temporary plumbing systems. .2 If the Project consists entirely of new construction, the Contractor shall pay the costs of water consumed and sewerage charges until Substantial Completion. .3 If the Project is a renovation of an existing building or structure, addition(s) to an existing building or structure, or any combination of new construction and renovation work that does not allow separate metering of utilities, the Owner shall pay the costs of water consumed and sewerage charges. 6.14.3.5 From the date of Substantial Completion, the Owner shall pay the costs of water consumed and sewerage charges for the occupied portion of the Project. 6.14.3.6 If the permanent plumbing system is used during construction, the Contractor shall furnish an extended warranty and service contract in effect until the expiration of the Correction Period.
AutoNDA by SimpleDocs
Water and Drainage. Access to domestic cold water, drainage and ventilation systems at a central location on the floor.

Related to Water and Drainage

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.

  • Clean Air Act For all contracts in excess of $100,000, both parties hereby agree to comply with all applicable standards, orders or requirements issued under section 306 of the Clean Air Act (42 U.S.C. 1857(h), Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection MPHA regulations (40 CFR Part 15).

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Waste and Nuisance (a) Tenant shall not commit or permit any waste, including waste as it is defined in the Waste Management Act, S.B.C. 1979 c.41, as amended from time to time, to be brought upon, kept, or used in or about the Premises, the Building, or the Project by Tenant, its agents, employees, contractors or invitees, without the prior written consent of Landlord. (b) Tenant shall not commit or permit any damage to the Premises, the Building, or the Project, including the Leasehold improvements and trade fixtures therein. (c) Tenant shall not commit or permit any nuisance in or around the Premises, the Building, or the Project or any use or manner of use causing annoyance to other persons. (d) Except only as may be otherwise permitted under Subsection 1.9(h) below, Tenant shall not use or permit to be used any part of the Premises, the Building, or the Project for any trade or business which is, in the reasonable opinion of Landlord, dangerous, noxious or offensive. (e) Except only as may be otherwise permitted under Subsection 1.9(h) below, Tenant shall not cause or suffer or permit any waste, oil or grease or any harmful, objectionable, dangerous, poisonous or explosive matter or substance to be discharged into the Premises, the Building, or the Project. (f) Tenant shall not place any objects on or otherwise howsoever obstruct the heating or air conditioning vents within the Premises or the Building. (g) Tenant shall keep the Premises free of debris, anything which could create a fire hazard (through undue load on electrical circuits or otherwise) or cause undue vibration, heat or noise. (h) Except as necessary to the ordinary operation of Tenant’s business conducted in compliance with all applicable laws, rules and regulations, Tenant shall keep the Premises free of rodents, vermin and anything of a dangerous, noxious or offensive nature. Tenant shall at all times keep Landlord informed of the presence in the Premises of any rodents or vermin or anything of a dangerous, noxious or offensive nature necessary to the ordinary operation of Tenant’s business conducted in compliance with all applicable laws, rules and regulations, and Tenant shall ensure that they are at all times confined within the Premises, stored and used in compliance with all applicable laws, rules and regulations, and do not cause any nuisance or annoyance to other persons.

  • Clean Air The Contractor agrees to: (a) comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §§ 7401 – 7671q, et seq. The Contractor agrees to report each violation to SMART and understands and agrees that SMART will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office; and (b) include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FTA.

  • Waste Disposal Tenant shall store its waste either inside the Premises or within outside trash enclosures that are fully fenced and screened in compliance with all Private Restrictions, and designed for such purpose. All entrances to such outside trash enclosures shall be kept closed, and waste shall be stored in such manner as not to be visible from the exterior of such outside enclosures. Tenant shall cause all of its waste to be regularly removed from the Premises at Tenant’s sole cost. Tenant shall keep all fire corridors and mechanical equipment rooms in the Premises free and clear of all obstructions at all times.

  • Wildlife Do not feed any of the wildlife ever. Animals of any size are potentially dangerous. Feeding even small animals attracts predators. Supervise children at all times. Keep garage doors closed at all times except when entering or leaving the Rental Home.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!