WATERING FOR DUST ABATEMENT Sample Clauses

WATERING FOR DUST ABATEMENT. Purchaser shall use water for dust abatement as directed by the Contract Administrator.
AutoNDA by SimpleDocs
WATERING FOR DUST ABATEMENT. Contractor shall use water for dust abatement as directed by the Contract Administrator.
WATERING FOR DUST ABATEMENT. Purchaser shall use water for dust abatement as directed by the Contract Administrator. DRAFT SECTION 7 – STRUCTURES 7-56 STEEL PIPE, PIPE ARCH, AND STRUCTURAL PLATE INSTALLATION Purchaser shall install steel pipe, pipe arches, and structural plate culverts in accordance with the National Corrugated Steel Pipe Association "Installation Manual for Corrugated Steel Pipe, Pipe Arches, and Structural Plate.” Installation is subject to the inspection and approval of the Contract Administrator before placement and backfill. The latest edition of the NCSPA Installation Manual can be found at xxx.xxxxx.xxx.
WATERING FOR DUST ABATEMENT. Purchaser shall use water for dust abatement on the following roads and as directed by the Contract Administrator. Road Stations Comments E333930E 0+00 to 13+65 Water for dust abatement as needed for visibility approaching Summit Valley Rd. E333930E 94+55 to 99+20 Water subgrade for compaction as needed to accommodate mobilization of empty log trucks E333836E 10+56 to 21+12 Water road for dust abatement adjacent to private residence as needed. SECTION 7 – STRUCTURES 7-57 CULVERT SHAPE CONTROL DRAFT Purchaser shall monitor the culvert shape during backfill and compaction. Special attention must be paid to maintaining the structure’s rise dimensions, concentricity, and smooth uniform curvature. If compaction methods are resulting in peaking or deflection of the culvert, Purchaser shall modify the compaction method to achieve the appropriate end result.
WATERING FOR DUST ABATEMENT. Purchaser shall use water for dust abatement on the following roads as directed by the Contract Administrator. Road Stations D‐2000 0+00 to 39+00 SECTION 7 – STRUCTURES
WATERING FOR DUST ABATEMENT. Purchaser shall use water for dust abatement on the following roads as directed by the Contract Administrator. Road Stations C-Line 0+00 to 25+00 SECTION 7 – STRUCTURES 7-5 STRUCTURE DEBRIS Purchaser shall not allow debris from the installation or removal of structures to enter any stream. Purchaser shall not allow debris from the installation or removal of structures to enter any stream. Purchaser shall maintain a clean jobsite, with all materials stored away from the high water mark or other area presenting a risk of the materials entering a stream. Debris entering any stream must be removed immediately, and placed in the site(s) designated for stockpiling or disposal. Purchaser shall retrieve all material carried downstream from the jobsite.

Related to WATERING FOR DUST ABATEMENT

  • Work Loads If an employee believes the amount of work he or she is required to perform is excessive over what is required from the rest of the staff and it will result in an occupational accident or occupational injury to him or her, the question shall be referred to Section 17 of this Agreement.

  • Emergency Transportation Ambulance services for emergencies.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Building Services Labor Law Article 9 applies to Contracts for building service work over $1,500 with a public agency, that: (i) involve the care or maintenance of an existing building, or (ii) involve the transportation of office furniture or equipment to or from such building, or (iii) involve the transportation and delivery of fossil fuel to such building, and (iv) the principal purpose of which is to furnish services through use of building service employees.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Work Load The professional obligation of academic employees comprises both scheduled and non-scheduled activities. The Guild and the District recognize that it is part of the professional responsibility of faculty to carry out their duties in an appropriate manner and place. As part of this responsibility faculty are expected to play an important role in the recruitment and retention of students, campus and departmental governance, program review, accreditation, planning and mentoring. Faculty commitment to retention will be demonstrated by informing students that they are to talk with the instructor prior to dropping the course. Faculty are encouraged to include a statement to this effect in their course syllabi. While it is understood that course syllabi content falls within the purview of the individual faculty member’s academic freedom, the parties also understand that items required to be part of syllabi in order to maintain college or continuing education accreditation must also be included. Tenured/tenure-track faculty who have less than a full-time contract are not eligible to work any additional assignments including long-term substitution (day-to-day substitution is allowed provided the limits specified in Section 5.2.1.3 are not exceeded). Faculty assignments shall be made in the following priority order: Tenured/tenure-track, pro- rata, overload, Priority of Assignment (POA) adjunct faculty assignments, then non-POA adjunct faculty.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

Time is Money Join Law Insider Premium to draft better contracts faster.