Examples of Cluster Study in a sentence
Then each request will be added to the models and the change in flow across such Network Upgrades shall be determined for each request included in the Cluster Study.
William Huye, III to Matthew Monson August 2, 2022, Exhibit “10”.in connection with your claim against Maison Insurance Company arising out of the claim for damages on 10/27/01.
Cluster Application Window shall mean a period of time specified by the Distribution Provider in which Interconnection Requests will be accepted for processing under the Cluster Study Process as set forth in Section 4.1 of the GIP.
For each Network Upgrade identified, the average incremental power flow impact of each Interconnection Request in the Cluster Study, as defined in Section 4.2.2 of the GIP, shall be determined using each seasonal model available for the Cluster Study period during which the generating facility associated with the Interconnection Request is most likely to be generating at nameplate capacity, after the Date Upgrade Needed, as defined in Section 4.2.2 of the GIP, of such upgraded facility.
Cluster Study Process shall mean the interconnection study process set forth in GIP Section 4.
In addition, bidder must have completed a System-Impact Study, Cluster Study Phase 1, or have passed the Fast Track screens.
As a result of implementing these mitigation measures, please be advised that the facilities and their associated costs identified in this Cluster Study (Attachment 1 and Attachment 2) are above and beyond the mitigation identified in previous cluster studies.
For Interconnection Requests processed under the Cluster Study Process described in the Generation Interconnection Procedures.
All Network Upgrades that are required to provide Interconnection Service for all Interconnection Requests included in a Cluster Study shall be included in a cluster cost allocation assessment group (“CCAAG”).
A Cluster Study may be used for a System Impact Study, Facilities Study, environmental review, or other study or analysis that is necessary to determine system modifications needed to provide service.1.5 Commission: The Federal Energy Regulatory Commission.