E-System means any electronic system approved by Agent, including Intralinks® and ClearPar® and any other Internet or extranet-based site, whether such electronic system is owned, operated or hosted by Agent, any of its Related Persons or any other Person, providing for access to data protected by passcodes or other security system.
Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.
Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;
complete vehicle means any vehicle which need not be completed in order to meet the relevant technical requirements of this Directive;
Complete application means a document prepared in
Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Project, together with all supplements, amendments or corrections, submitted by the Developer and approved by the City in accordance with this Agreement.
Levee system means a flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices.
Project Companies means all Group Project Companies and Non-Group Project Companies together, each being a “Project Company”.
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.
Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).
911 system means the set of network, database and customer premise equipment (CPE) components required to provide 911 service.
Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”
PV System means a residentially hosted roof-top solar electric generating system, including photovoltaic panels, racks, wiring and other electrical devices, conduits, weatherproof housings, hardware, one or more inverters, remote monitoring systems, connectors, meters, disconnects and over current devices.
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Power plant means a facility for the generation of
Cable System means a facility, consisting of a set of closed transmission paths and associated Signal generation, reception, and control equipment, that is designed to provide Cable Service, which includes Video Programming and which is provided to multiple Subscribers within a community, but “Cable System” does not include:
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.
Transmission Business means the authorised business of a transmission licensee to transmit electricity, whether for its own account or for that of any other person, through any system owned and/ or operated by such licensee;
SCADA System means the Supervisory Control and Data Acquisition System which is composed of all telemetering and remote terminal units (“RTU”) at the Facility and associated with the Grid System or BPDB’s Control Center;
As built plans means drawings depicting conditions as they were actually constructed.
Project Completion Date means the date on which the Completion Certificate is issued;
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;
Sewage system means the entire sewage treatment and subsurface disposal system;