Construction Areas definition
Examples of Construction Areas in a sentence
Maintenance Department X X X Prepare final commissioning report X Construction Observation X X X X X Pre-final and final inspection X X X X X X Documentation of Design Criteria and Assumptions for Consultants General Construction Areas Occupancy, usage, and schedule assumptions, all seasons.
Upon the completion of the WIRELESS NETWORK, Verizon shall ensure that the Construction Areas and the roadways and walkways immediately surrounding them are reasonably clean, and that all tools, equipment and surplus materials, and waste materials, debris and rubbish have been removed.
Upon selection of the location of permanent HQ of MPFSEE, hence the Host Nation, a joint study group will be established and tasked, based on a local reconnaissance to decide on the final composition and exact type of material, moral and other requirements within the framework of Host Nation support.
Verizon shall keep the Construction Areas and any City property free and clear from any liens in any way arising out of the WIRELESS NETWORK construction work.
Verizon shall secure and provide within the Construction Areas appropriately sized containers for the collection of all waste materials, debris and rubbish associated with the WIRELESS NETWORK work.
All existing trees in the Construction Areas shall be protected in a manner approved by the Seattle Center Project Coordinator during construction.
Verizon’s Project Manager and the Seattle Center Project Coordinator and such other designee(s) as authorized by the Director may select shall participate in a joint walk- through of the Construction Areas to identify restorative work items remaining for completion, or which otherwise require correction or remedial work.
If requested by the Director, Verizon shall (i) promptly stop work on the non-compliance improvement, addition, alternation or construction and, if necessary, promptly remove it from the Construction Areas, and (ii) address such non-compliance with the Seattle Center Site Standards and the Director- approved plans and specifications for the WIRELESS NETWORK to the Director’s satisfaction.
Verizon shall ensure that all punchlist work is completed within thirty (30) days after the date of such initial, joint walk-through (unless a longer time period is agreed to by the Parties in writing), and shall thereafter invite the Seattle Center Project Coordinator and such other designee(s) of the Director to participate in another joint walk-through of the Construction Areas to verify whether or not all punchlist work has been properly completed.
Verizon shall keep the Construction Areas and all adjacent property free from the accumulation of waste materials, rubbish and windblown debris, and shall daily dispose of all flammable, hazardous and toxic materials.