Construction Cost Limit definition

Construction Cost Limit means that portion of the total amount of Project funds which shall not be exceeded on construction of the Project;
Construction Cost Limit means AACE Level 2 construction cost estimate developed as part of the MCM’s PIP plus the construction contingency, as agreed upon by Canada.
Construction Cost Limit. (CCL) means the maximum monetary amount payable to the Construction Manager for all Construction Phase services, materials, labor and other work required for completion of the Work in accordance with the Contract Documents. The CCL includes, without limitation, the General Conditions Costs, the Cost of the Work, the Construction Phase Fee and the Construction Manager’s Contingency. The CCL may be adjusted by the parties for changes in the scope of the Project before or after acceptance of the Guaranteed Maximum Price Proposal. The CCL does not include the Construction Manager’s Pre-Construction Phase Fee, Owner’s Construction Contingency or other Owner funded costs.

Examples of Construction Cost Limit in a sentence

  • If the lowest price obtained by bid process or negotiation exceeds the Construction Cost Limit, and if the excess is due to reasons within the control of, or reasonably foreseeable by the Consultant, the Consultant shall, if requested by the Departmental Representative, and without additional charge, be fully responsible for revising the Project scope and quality as required to reduce the construction cost and shall modify the construction documents as necessary to comply with the Construction Cost Limit.

  • If, for reasons attributable to the Consultant, a price cannot be obtained by a tender or negotiation within the Construction Cost Limit, or acceptable to the Departmental Representative for the award of the Construction Contract, the Consultant shall be entitled to receive payment for the tender call, bid evaluation and construction contract award Services, only when the requirements of CS 9.3, in clause 9999DA, Consultant Services and Departmental Responsibilities, have been met.

  • Throughout Project development, the Construction Cost Estimate prepared by the Consultantshall not exceed the Construction Cost Limit.

  • Throughout Project development, the Construction Cost Estimate prepared by the Consultant shall not exceed the Construction Cost Limit.

  • The bidding or negotiating contingency to be added to the Construction Cost Limit is percent per PCCA’s Contingency Guidelines for General or Marine or Rehabilitation projects accordingly.

  • If a Construction Cost Limit for a Specific Project is established between PCCA and Engineer in a Service Order, then such Construction Cost Limit and a statement of Engineer’s rights and responsibilities with respect thereto will be specifically set forth in the applicable Service Order.

  • In accordance with R1220D (2015-02-25) GC 3.11 Cost Control, throughout Project Development, the Construction Cost Estimate prepared by the Consultant shall not exceed the Construction Cost Limit as specified above.

  • Provide recommendations for remedial action to maintain and keep the estimates within the Construction Cost Limit.

  • The City's Project Construction Cost Limit is set forth elsewhere in the RFP.

  • Notify the Departmental Representative in the event that the CM considers that the Construction Cost Estimate will exceed the Construction Cost Limit.

Related to Construction Cost Limit

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Acquisition Cost means the cost to acquire a tangible capital asset including the purchase price of the asset and costs necessary to prepare the asset for use. Costs necessary to prepare the asset for use include the cost of placing the asset in location and bringing the asset to a condition necessary for normal or expected use.

  • Improvement Costs means any additional expenditure on a fixed asset that materially increases the capacity of the asset or materially improves its functioning or represents more than 10% of the initial depreciation base of the asset;

  • Construction Fee means a fee or other remuneration for acting as general contractor and/or construction manager to construct improvements, supervise and coordinate projects or provide major repairs or rehabilitations on a Property.

  • Restoration Cost has the meaning set forth in Section 5.06.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Construction Contractor means a person who undertakes to or offers to undertake to, or purports to have the capacity to undertake to, or submits a bid to, or does himself or by or through others, construct, alter, repair, add to, subtract from, improve, move, wreck, or demolish any building, highway, road, railroad, excavation, or other structure, project, development, or improvement to real property, or to do any part thereof. "Construction contractor" includes subcontractors, specialty contractors, prime contractors, and any person receiving consideration for the general supervision and/or coordination of such a construction project except for remediation contracting. This definition shall govern without regard to whether or not the construction contractor is acting in fulfillment of a contract.

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.

  • Construction Work means any work in connection with⎯

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Remediation Costs means the cost of any action taken to reduce the concentration of contaminants on, in or under the Eligible Property to permit a record of site condition to be filed in the Environmental Site Registry under section 168.4 of the Environmental Protection Act and the cost of complying with any certificate of property use issued under section 168.6 of the Environmental Protection Act, as further specified in the CIP.

  • Construction Debt means debt incurred to fund (a) all or a portion of a Capital Improvement, (b) interest payments (including periodic net payments under related interest rate swap agreements) and related fees on other Construction Debt or (c) distributions (including incremental Incentive Distributions) on Construction Equity.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Soft Costs means the costs of professional work and fees, interim costs, financing fees and expenses, syndication costs, soft costs and Developer’s fees as shown in the Applicant’s properly completed UniApp, Section C - Uses of Funds. Soft Costs do not include operating or replacement reserves.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Relocation Costs means costs incurred in the relocation of the furniture, fixtures, equip- ment, machinery and supplies, including, but not limited to, the cost of dismantling and reassembling equipment and the cost of floor preparation necessary for the reassembly of the equipment. Relocation costs include only such costs that are incurred during the ninety-day period immediately following the commencement of the relocation to an eli- gible premises. Relocation costs do not include costs for structural or capital improve- ments or items purchased in connection with the relocation.

  • Formation Cost means preliminary expenses relating to regulatory and registration fees of the Scheme, flotation expenses of the Scheme, expenses relating to authorization of the Scheme, execution and registration of the Constitutive Documents, legal costs, printing, circulation and publication of this Offering Document, announcements describing the Scheme and all other expenses incurred until the end of the Initial Period.

  • construction site means a workplace where construction work is being performed;

  • Production Costs means those costs and expenditures incurred in carrying out Production Operations as classified and defined in Section 2 of the Accounting Procedure and allowed to be recovered in terms of Section 3 thereof.

  • Construction Contract or “contract” means a written agreement between a contractor and a public agency for the construction, alteration, demolition, or repair of a facility, other than a contract having a dollar value of less than $30,000.00 or a contract that provides for 3 or fewer payments.