Feasibility Phase definition

Feasibility Phase means that period commencing when the Management Committee authorises the preparation of the Feasibility Study and the Proposal for Development arising as a consequence thereof and terminating with a decision of the Management Committee to commence the Construction Phase;
Feasibility Phase the preliminary phase of the Project intended to establish whether a solution to the business need is technically feasible and affordable;
Feasibility Phase the Parties will work both jointly and independently to establish the technical and commercial feasibility of all proposed Licensed Product(s). All proposed Licensed Product(s), whether under this Agreement or otherwise, must be approved by the Joint Steering Committee per Section 4. The Feasibility Phase of a project will

Examples of Feasibility Phase in a sentence

  • Type II IEPR, or Safety Assurance Review (SAR), considers the adequacy, appropriateness, and acceptability of the design and construction activities in assuring public health safety and welfare, and in some cases may include decision document reviews during the Feasibility Phase.

  • Corps of Engineers specifically authorized planning studies are conducted in two phases: Reconnaissance Phase and Feasibility Phase.

  • During the initial Feasibility Phase, it was discovered that a sewer main exists directly below the location of the proposed building.

  • FAB Europe Central (FABEC) consists of the following states: Belgium, France, Germany, Luxemburg, the Netherlands and Switzerland.The FABEC Feasibility Phase (2006-2008) led to the conclusion that FABEC is feasible.

  • Event Critical Path -- Feasibility Phase (continued) Again, it is obvious that for the event to be successful, the two sets of expectations must not conflict with each other.

  • The purpose of the Firm Transmission Feasibility Phase I System Impact Study shall be to assess whether the Transmission System has sufficient available capability to provide the requested service.

  • This category involves studies under the broad heading of master planning, and it is typically part of the Feasibility Phase.

  • Included in this is $337,753 in additional FHWA Planning funds, which was programmed in the newly created WE 174 Inland Port Feasibility Phase IV.

  • This will be applicable for all the sectors under this assignment.Inception Phase – 2 weeks Feasibility Phase – 4 weeksDraft DPR Phase – Within 2 MonthsDPR Preparation Phase – within 3 MonthsConsultant shall ensure that their Team Leader/Deputy Team Leader must meet BUIDCo office fortnightly and also when required for meeting/discussion in BUIDCo office.

  • Approximately $2 million of this is attributed to the new WE 174 Inland Port Feasibility Phase IV.


More Definitions of Feasibility Phase

Feasibility Phase means the initial portion of the Project during which the Feasibility Studies will be performed by or for Newco on the Platform and potential Products.
Feasibility Phase is defined in Section 1.2(a) (Feasibility Phase).
Feasibility Phase means the period commencing on execution and delivery of this Agreement and ending on Pre-Development Green Light or termination of this Agreement in accordance with Section 5(g).
Feasibility Phase means the portion of the [***] that includes certain [***] and [***] and other activities to be conducted by the Parties commencing on the Effective Date, as further described in the Development Plan.
Feasibility Phase means the period of time between the date of this JV Agreement and the date of completion of the Feasibility Assessment to the Parties' mutual satisfaction;
Feasibility Phase shall have the meaning set forth in Section 3.1 hereof.

Related to Feasibility Phase

  • Feasibility Study means the evaluation and analysis of the potential of a project, which aims at supporting the process of decision-making by objectively and rationally uncovering its strengths and weaknesses, opportunities and threats, as well as identifying the resources required to carry it through and ultimately its prospects for success;

  • Development Phase means the period before a vehicle type is type approved.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Phase or “Phases” in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Geotechnical engineer means a Professional Engineer whose principal field of specialization is the design and Construction of earthworks in a permafrost environment.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.

  • Study Period means the period commencing at 9:00 a.m. on the date hereof, and continuing through 5:00 p.m. on the Closing Date.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Development Project means a project for the development of land within a project area.

  • Phase 1 Study means a clinical study of a drug candidate in human patients with the primary objective of characterizing its safety, tolerability, and pharmacokinetics and identifying a recommended dose and regimen for future studies as described in 21 C.F.R. §312.21(a), or a comparable clinical study prescribed by the relevant Regulatory Authority in a country other than the United States. The drug candidate can be administered to patients as a single agent or in combination with other investigational or marketed agents.

  • Project Architect means the professional architect or engineer employed by the Owner as architect or engineer of record for the Project and its consultants.

  • Phase IIb Clinical Trial means a clinical trial of a Product on sufficient numbers of patients that is designed to provide a preliminary determination of safety and efficacy of such Product in the target patient population over a range of doses and dose regimens.

  • Feasibility Report means a detailed report, in form and substance sufficient for presentation to arm's length institutional lenders considering project financing, showing the feasibility of placing any part of the Property into commercial production as a Mine and shall include a reasonable assessment of the various categories of ore reserves and their amenability to metallurgical treatment, a complete description of the work, equipment and supplies required to bring such part of the Property into commercial production and the estimated cost thereof, a description of the mining methods to be employed and a financial appraisal of the proposed operations and including at least the following: (i) a description of that part of the Property to be covered by the proposed Mine; (ii) the estimated recoverable reserves of Minerals and the estimated composition and content thereof; (iii) the proposed procedure for development, mining and production; (iv) results of ore amenability treatment tests (if any); (v) the nature and extent of the facilities proposed to be acquired, which may include mill facilities if the size, extent and location of the ore body makes such mill facilities feasible, in which event the study shall also include a preliminary design for such mill; (vi) the total costs, including capital budget, which are reasonably required to purchase, construct and install all structures, machinery and equipment required for the proposed Mine, including a schedule of timing of such requirements; (vii) all environmental impact studies and costs of implementation; (viii) the period in which it is proposed the Property shall be brought to commercial production; and (ix) such other data and information as are reasonably necessary to substantiate the existence of an ore deposit of sufficient size and grade to justify development of a mine, taking into account all relevant business, tax and other economic considerations including a cost comparison between purchasing or leasing and renting of facilities and equipment required for the operation of the Property as a Mine.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Improvement completion assurance means a surety bond, letter of credit,

  • Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).

  • Phase II Study means a human clinical trial, for which the primary endpoints include a determination of dose ranges and/or a preliminary determination of efficacy in patients being studied as described in 21 C.F.R. § 312.21(b) (FDCA), as amended from time to time, and the foreign equivalent thereof.

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • Phase 3 means the period commencing on the day after the Phase 2 implementation date and ending on the Phase 3 implementation date (as defined below).