Examples of Joint Location in a sentence
On one sheet profile of maximum 400 meters shall be given to ensure clarity.7.3. Joint Location DiagramThis diagram will show Geographical location of all the joints. Depth of Joint Chamber covers from ground level Type of chamber (Brick/Pre-cast) Length of O.F. Cable kept inside the joint chamber from either direction.
On one sheet profile of maximum 400 meters shall be given to ensure clarity.7.3. Joint Location DiagramThis diagram will show□ Geographical location of all the joints.□ Depth of Joint Chamber covers from ground level□ Type of chamber (Brick/Pre-cast)□ Length of O.F. Cable kept inside the joint chamber from either direction.
On one sheet profile of maximum 400 meters shall be given to ensure clarity.7.3. Joint Location DiagramThis diagram will show -cast)joint chamber from either direction.This shall be prepared on A-4 sheets of 80 GSM.All the diagrams (i), (ii) & (iii) shall bear the signatures of the contractor, the Engineer-in-charge as a proof of accuracy of the details.
CIVILIAN GUARDS IN JOHANNESBURG AFRICAN TOWNSHIPS It was mentioned in the Institute's last Annual Report (page 63) that, early in 1951, the Joint Location Advisory Boards of Johannesburg had urged that, as the police force was unable adequately to deal with the reign of terror being imposed by "tsotsis" in many African townships, African civilians be enrolled as civic guards or special constables to assist the police.
At each Joint Location and United Location, as necessary, Contractor will train United employees in the requirements of Contractor's Aircraft Ground Handling Procedures; provided that Contractor will provide a trainer and materials and United will pay all other expenses incurred by its employees in connection with such training.
On one sheet profile of maximum 400 meters shall be given to ensure clarity.7.3. Joint Location DiagramThis diagram will show-cast)This shall be prepared on A-4 sheets of 80 GSM.All the diagrams (i), (ii) & (iii) shall bear the signatures of the contractor, the Engineer-in-charge as a proof of accuracy of the details.
Approval of a Joint Location candidature should be sought prior to admission through the relevant Faculty.
On one sheet profile of maximum 400 meters shall be given to ensure clarity.7.3. Joint Location Diagram This diagram will showts.-cast)This shall be prepared on A-4 sheets of 80 GSM.All the diagrams (i), (ii) & (iii) shall bear the signatures of the contractor, the Engineer-in-charge as a proof of accuracy of the details.
On one sheet profile of maximum 400 meters shall be given to ensure clarity.iii) Joint Location Diagram: This diagram will show :Geographical location of all the joints., Depth of joint Chamber covers from ground level,.
In contrast to the ex- isting literature, it assesses the impact of hot temperature on high stakes exams and subsequent educational attainment, and explores the role of avoidance behaviors in greater detail.