Maximum facility capacity definition

Maximum facility capacity means the maximum number of individuals that the assisted living facility may serve at any one time, as determined by the department.
Maximum facility capacity means the maximum number of individuals that the boarding home may serve at any one time, as determined by the department.
Maximum facility capacity means the maximum number of individuals that the boarding home may serve at any one time, as determined by the department.The maximum facility capacity includes all residents and respite care residents and adult day services clients.The maximum facility capacity is equal to the lesser of:The sum of the number of approved bed spaces for all resident rooms (total number of approved bed spaces), except as specified in subsection (3); orTwice the seating capacity of the dining area(s) consistent with WAC 388-78A-2300 (1)(h); orThe number of residents permitted by calculating the ratios of toilets, sinks, and bathing fixtures to residents consistent with WAC 388-78A-3030; orFor boarding homes licensed on or before December 31, 1988, the total day room area in square feet divided by ten square feet, consistent with WAC 388-78A-3050; orFor boarding homes licensed after December 31, 1988, the total day room area in square feet divided by twenty square feet, consistent with WAC 388-78A-3050.For the purposes of providing adult day services consistent with WAC 388-78A-2360, one additional adult day services client may be served, beyond the total number of approved bed spaces, for each additional sixty square feet of day room area greater than the area produced by multiplying the total number of approved bed spaces by twenty square feet, provided that:There is a [at] least one toilet and one hand washing sink accessible to adult day services clients for every eight adult day services clients or fraction thereof;The total number of residents and adult day services clients does not exceed twice the seating capacity of the dining area(s) consistent with WAC 388-78A-2300 (1)(h); andThe adult day services program area(s) and building do not exceed the occupancy load as determined by the local building official or state fire marshal.

Examples of Maximum facility capacity in a sentence

  • Maximum facility capacity: 70; maximum classroom capacity: 50; facility square footage: 2000.EQUIPMENTOMS strives to keep its equipment as up-to-date as possible to meet the appropriate industry standards.

  • Maximum facility capacity along the southwest border is approximately 5,000, which assumes a homogenous population and full operating status at all facilities.

  • Homeless to be housed at Albany County Jail, Steve Hughes (September 9,2019) available at https://www.timesunion.com/news/article/Albany-sheriff-plans-space-for-homeless-residents-14424220.phpF INDINGSFINDING 1: Maximum facility capacity, minimum staffing requirements andcontracts for services are larger than necessary.

  • Maximum facility capacity: 70; maximum classroom capacity: 50; facility square footage: 2000.EQUIPMENTOMS strives to keep its equipment as up‐to‐date as possible to meet the appropriate industry standards.

  • Maximum facility capacity: 70; maximum classroom capacity: 50; facility square footage: 2000.EQUIPMENT‌OMS strives to keep its equipment as up-to-date as possible to meet the appropriate industry standards.

  • Homeless to be housed at Albany County Jail, Steve Hughes (September 9,2019) available at https://www.timesunion.com/news/ article/Albany-sheriff-plans-space-for-homeless-residents-14424220.phpFINDINGSFINDING 1: Maximum facility capacity, minimum staffing requirements and contracts for services are larger than necessary.


More Definitions of Maximum facility capacity

Maximum facility capacity means the maximum number of Tons the Facility is designed, and the 287 Contractor’s operating expenses are assumed, to Process. 288 “Mixed Waste”, means Municipal Solid Waste that is available for delivery for Processing and may be 289 Processed at the Project, and is not Unprocessable Waste or Unacceptable Waste. Mixed Waste also 290 includes commercial and industrial waste that meets the criteria defined herein, Construction and 291 Demolition Debris, agricultural plastic, and tires. Mixed Waste does not include materials that are 292 collected or delivered in a source-separated form. 293 “Monthly Service Payment”, means the monthly amount paid to the County by the Collection Contractors 294 (on behalf of and overseen by the City) for delivery of Acceptable Materials for Processing at the Project 295 Site, as described in Section 4.2.B. 296 “Municipal Solid Waste”; “MSW”, means generally the components of Mixed Waste, and specifically all 297 substances or materials that are discarded or rejected as being spent, useless, worthless or in excess of 298 the owner’s needs at the time of discard or rejection including, without limitation, all putrescible and non- 299 putrescible solid and semi-solid waste including garbage, rubbish, maintenance waste, Yard Trimmings, 300 bulky wastes, industrial wastes, Construction and Demolition Debris, and grit and sweepings from a water 301 pollution control plant, which are generated by residential, commercial, industrial, institutional, 302 municipal, agricultural and other activities and which are not otherwise restricted in a Class III landfill by 303 State or federal regulations and which are delivered to the Project Site as Mixed Waste. Municipal Solid 304 Waste does not include: (i) Hazardous Waste; (ii) medical waste; (iii) ash; (iv) Source-Separated Recyclable 305 Materials; (v) Source-Separated Yard Trimmings; (vi) Source-Separated Food Scraps; or (vii) other 306 materials collected separately from Municipal Solid Waste for Processing at the Project Site.
Maximum facility capacity means the maximum number of Tons the Facility is designed, and the

Related to Maximum facility capacity

  • Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;

  • Excess Capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • Available RP Capacity Amount means the amount of Restricted Payments that may be made at the time of determination pursuant to Sections 6.04(a)(ii)(D), (a)(vii) and (a)(x) minus the aggregate amount of the Available RP Capacity Amount utilized by the Borrower or any Restricted Subsidiary to (a) make Investments pursuant to Section 6.06(q)(ii), (b) make Restricted Debt Payments pursuant to Section 6.04(b)(iv)(B) or (c) incur Indebtedness pursuant to Section 6.01(ll).

  • Committed Capacity means that portion of the Capacity that is required to meet the Capacity Entitlements of Access Holders;

  • Maximum Facility Amount means the aggregate Commitments as then in effect, which amount shall not exceed $200,000,000; provided that at all times after the Reinvestment Period, the Maximum Facility Amount shall mean the aggregate Advances Outstanding at such time.

  • Maximum Facility Output means the maximum (not nominal) net electrical power output in megawatts, specified in the Interconnection Service Agreement, after supply of any parasitic or host facility loads, that a Generation Interconnection Customer’s Customer Facility is expected to produce, provided that the specified Maximum Facility Output shall not exceed the output of the proposed Customer Facility that Transmission Provider utilized in the System Impact Study. Maximum State of Charge:

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • New Capacity means a new Generator, a substantial addition to the capacity of an existing Generator, or the reactivation of all or a portion of a Generator that has been out of service for five years or more that commences commercial service after the effective date of this definition. For purposes of Section 23.4.5 of this Attachment H, “Offer Floor” for a Mitigated Capacity Zone Installed Capacity Supplier that is not a Special Case Resource shall mean the lesser of (i) a numerical value equal to 75% of the Mitigation Net CONE translated into a seasonally adjusted monthly UCAP value (“Mitigation Net CONE Offer Floor”), or (ii) the numerical value that is the first year value of the Unit Net CONE determined as specified in Section 23.4.5.7, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate, (“Unit Net CONE Offer Floor”). The Offer Floor for a Mitigated Capacity Zone Installed Capacity Supplier that is a Special Case Resource shall mean a numerical value determined as specified in Section 23.4.5.7.5. The Offer Floor for Additional CRIS MW shall mean a numerical value determined as specified in Section 23.4.5.7.6. For the purposes of Section 23.4.5 of this Attachment H, “Non-Qualifying Entry Sponsors” shall mean a Transmission Owner, Public Power Entity, or any other entity with a Transmission District in the NYCA, or an agency or instrumentality of New York State or a political subdivision thereof.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]

  • Final RTO Unforced Capacity Obligation means the capacity obligation for the PJM Region, determined in accordance with RAA, Schedule 8. Financial Close:

  • Design capacity means the volume of a containment feature at a discharging facility that accommodates all permitted flows and meets all Aquifer Protection Permit conditions, including allowances for appropriate peaking and safety factors to ensure sustained, reliable operation.

  • RA Capacity means the maximum megawatt amount that the CAISO recognizes from a Project that qualifies for Buyer’s Resource Adequacy Requirements and is associated with the Project’s Capacity Attributes.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Maximum Swingline Amount means $5,000,000.

  • Facility Limit means $100,000,000 as reduced from time to time pursuant to Section 2.02(e). References to the unused portion of the Facility Limit shall mean, at any time of determination, an amount equal to (x) the Facility Limit at such time, minus (y) the sum of the Aggregate Capital plus the LC Participation Amount.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Storage Capacity means any combination of space, injectability and deliverability.

  • Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.

  • Revolving Facility Usage means at any time the sum of the outstanding Revolving Credit Loans, the outstanding Swing Loans, and the Letter of Credit Obligations.

  • Nominal Capacity means the volume indicated by the manufacturer that represents the maximum recommended filling level.

  • Maximum Face Amount means, with respect to any outstanding Letter of Credit, the face amount of such Letter of Credit including all automatic increases provided for in such Letter of Credit, whether or not any such automatic increase has become effective.

  • Additional Capacity means, in relation to the Network, the capability of the Network to carry additional task by an enhancement or improvement of the infrastructure forming part of the Network or Associated Facilities;

  • Incremental Revolving Facility Commitment means the commitment of any Lender, established pursuant to Section 2.21, to make Incremental Revolving Loans to the Borrower.

  • Daily Unforced Capacity Obligation means the capacity obligation of a Load Serving Entity during the Delivery Year, determined in accordance with Reliability Assurance Agreement, Schedule 8, or, as to an FRR entity, in Reliability Assurance Agreement, Schedule 8.1. Day-ahead Congestion Price: “Day-ahead Congestion Price” shall mean the Congestion Price resulting from the Day-ahead Energy Market. Day-ahead Energy Market: