PRELIMINARY PLAN PHASE definition

PRELIMINARY PLAN PHASE is the initial design phase, typically developed in two distinct stages, Schematic Design and Design Development. PRE-SCHEMATIC / STUDY PHASE: is a pre-design phase that typically includes program development and security risk assessment.
PRELIMINARY PLAN PHASE means the initial design Phase, typically developed in two distinct stages, Schematic Design and Design Development.

Examples of PRELIMINARY PLAN PHASE in a sentence

  • PRELIMINARY PLAN PHASE: is the initial design phase, typically developed in two distinct steps: schematic design and design development.

Related to PRELIMINARY PLAN PHASE

  • Preliminary plat means a map showing the salient features of a proposed subdivision submitted to an approving authority for purposes of preliminary consideration.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Recovery Plan means a recovery plan drawn up and maintained by an institution in accordance with Article 5;

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Annual Work Plan and Budget means the work plan and budget prepared annually by the Recipient and approved by the Association in accordance with Section I.C of Schedule 2 to this Agreement; “Annual Work Plans and Budgets” means more than one such Annual Work Plan and Budget.

  • Numbering Plan Area (NPA) , also called area code, means the three (3)-digit code that occupies the A, B, C positions in the ten (10)-digit NANP format that applies throughout the NANP Area. NPAs are of the form NXX, where N represents the digits two (2) through nine (9) and X represents any digit zero (0) through nine (9). In the NANP, NPAs are classified as either geographic or non-geographic. Geographic NPAs are NPAs which correspond to discrete geographic areas within the NANP Area. Non-geographic NPAs are NPAs that do not correspond to discrete geographic areas, but which are instead assigned for services with attributes, functionalities, or requirements that transcend specific geographic boundaries. For example, NPAs in the N00 format, (e.g., 800, 900) are non-geographic.

  • Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.