Project Emissions definition

Project Emissions means any GHG emissions associated with the implementation of an offset project that must be accounted for in the Offset Project Data Report.
Project Emissions means any emissions attributable to the implementation of an Emission Reduction Project that must be accounted for in the Emission Reduction Project Report.
Project Emissions means any emissions associated with the implementation of an emission reduction project that must be accounted for in the Emission Reductions Project Report.

Examples of Project Emissions in a sentence

  • Step 1: Project Emissions Increase For modified existing emissions units, according to 40 CFR 51.165(a)(2)(ii)(C), the project’s emission increase for each pollutant is equal to the sum of the differences between the projected actual emissions (PAE) and the baseline actual emissions (BAE).

  • Post Project Emissions: The MERC generator must determine appropriate emission factors in units of grams of pollutant per mile or grams of pollutant per hour for the lower emitting technology vehicle/equipment engine using MOVES or other relevant data.

  • In contrast, placing the same amount of organic waste in a centralized composting facility involves a rapid aerobic decay that generates far fewer emissions within a single year (Project Emissions).

  • As shown in Table 2.3-4 of the AEA, Mitigation Measures 2-1 through 2-9, 2-11 and 2-12 (together, the “Local Measures”) reduce the Overall Project Emissions by 53%, or 281,271 MTCO2e/year.

  • Construction-Related Activity and Diesel PM Emissions in 2007Construction ProjectPer Project Emissions (lbs)Number of ProjectsTotal Emissions (lbs / year)Single Family Housing20 Since construction emissions are high in comparison with other sources, a sensitivity analysis was used to examine the influence of different input parameters on total emissions of single-family dwellings.

  • Note that the discussion of the rebound effect is considered in the section of Project Emissions, and therefore is not part of leakage.

  • As shown in Table 2.3-3 of the AEA, the project’s Overall Project Emissions are estimated to be 526,103 MTCO2e/year.

  • Financial performance measures indicate whether the company‘s strategy, implementation, and execution are contributing to bottom- line improvement.

  • To Avoid the Problems Described Above, the Guidance Should Encourage Public Agencies to Calculate and Disclose Project Emissions and Delete the Discussion of the 25,000 Ton “Reference Point”.For the reasons described above, instead of discouraging disclosure of emissions below a reference point, CEQ should consider revising the Guidance to require a good-faith effort, where possible, to disclose a project’s greenhouse gas emissions.

  • Equations8: Emission Reduction = Emissions Baseline – Emissions Project Emissions Baseline = Emissions Energy Use + Emissions Carbon Sequestration * Assurance Factor + Emissions Nitrogen Emissions Project = 0 8 Source: Alberta Environment (AENV).


More Definitions of Project Emissions

Project Emissions means the carbon emissions accounted for against using power or fuel in the production activity within the Project Boundary.
Project Emissions means an estimate of greenhouse gas emissions from all selected sources and reservoirs;
Project Emissions means the carbon emissions accounted for against using power or fuel in the production activity within the Project Boundary. ‘Registration’ or ‘Registered’ each means the formal acceptance by the CDM Executive Board of a validated project as a CDM project activity in accordance with the requirements set in out the International Rules.

Related to Project Emissions

  • PM10 emissions means PM10 emitted to the ambient air as measured by an applicable reference method, or an equivalent or alternate method, specified in 40 CFR Part 51, Appendix M as of December 8, 1984, or by a test method specified in these regulations or any supplement thereto.

  • greenhouse gas emissions means emissions in terms of tonnes of CO2 equivalent of carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), nitrogen trifluoride (NF3) and sulphur hexafluoride (SF6) determined pursuant to Regulation (EU) No 525/2013 and falling within the scope of this Regulation;

  • Project Work means the work required to complete the Project.

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Excess emissions - means an emission rate that exceeds any applicable emission limitation or standard allowed by any rule in Sections .0500, .0900, .1200, or .1400 of Subchapter 02D; or by a permit condition; or that exceeds an emission limit established in a permit issued under 15A NCAC 02Q .0700. (Note: Definitions of excess emissions under 02D .1110 and 02D .1111 shall apply where defined by rule.)

  • Secondary emissions means emissions which occur as a result of the construction or operation of a major stationary source or major modification, but do not come from the major stationary source or major modification itself. For the purposes of this chapter, “secondary emissions” must be specific, well-defined, and quantifiable, and must impact the same general areas as the stationary source modification which causes the secondary emissions. “Secondary emissions” includes emissions from any offsite support facility which would not be constructed or increase its emissions except as a result of the construction or operation of the major stationary source or major modification. “Secondary emissions” does not include any emissions which come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Improvements means site improvements and facilities that are:

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Production Environment means a logical group of virtual or physical computers comprised within the Cloud Environment to which the Customer will be provided with access and use the purchased Cloud Application(s) in production and for its generally marketed purpose.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Particulate matter emissions (PM) means the mass of any particulate material from the vehicle exhaust quantified according to the dilution, sampling and measurement methods as specified in this UN GTR.

  • Evaporative emissions means in the context of this UN GTR the hydrocarbon vapours lost from the fuel system of a motor vehicle during parking and immediately before refuelling of a sealed fuel tank.

  • Project Scope means the description or activity of work to be accomplished on the project.

  • Fugitive dust emissions means particulate matter from process operations that does not pass through a process stack or vent and that is generated within plant property boundaries from activities such as: unloading and loading areas, process areas, stockpiles, stock pile working, plant parking lots, and plant roads (including access roads and haul roads).

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • drainage work means any watercourse and includes any land which is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence;

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Contract Work means everything required to be furnished and done by the Contractor by any one or more of the parts of the Contract referred to in Article 1, except Extra Work as hereinafter defined.

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Project Engineer means the surveyor or engineer employed by or private

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

  • Predictive emissions monitoring system or "PEMS" means all of the equipment necessary to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and calculate and record the mass emissions rate (for example, pounds per hour) on a continuous basis.