Tier 1 Water definition

Tier 1 Water means, in regard to antidegradation, a level of protection that provides a “floor” which protects water quality and existing designated uses. Water quality must be preserved to protect and maintain those existing uses. Activities that would lower water quality below levels necessary to maintain existing designated uses are prohibited.
Tier 1 Water means that amount of Project Water reserved for delivery to end users pursuant to water purchase agreements that include firm capacity rights for the use of Capital Facilities necessary to deliver Project Water to points of delivery designated by Project Participants.

Examples of Tier 1 Water in a sentence

  • These waters are listed in the ADEM Construction Stormwater TMDL and 303(d) Listed Tier 1 Water bodies, which is periodically updated by ADEM and provided at www.adem.state.al.us under the Water Division.

  • In the Tier 1 Water Budget the second pass of the BFLOW filter was applied.

  • Tier 1 Water usage shall be calculated and billed based upon a level of 0.2 ccf per day rounded to the nearest whole ccf, based on Meter reading days of Service.

  • Developing and calibrating a groundwater model is however not part of the scope of the Tier 1 Water Budget.

  • In the Tier 1 Water Budget, a preliminary stress assessment indicating the potential for stress in subwatersheds of the region is undertaken.

  • Cartographic activities for the Tier 1 Water Budget and the Assessment Reports are scheduled as next priorities.

  • As with the Conceptual Water Budget, the Tier 1 Water Budget was documented in one report for the entire Thames-Sydenham and Region.

  • The Tier 1 Water Budget utilizes the information collected and analyzed in the Conceptual Water Budget.

  • A peer review will also be completed on the Tier 1 Water Budget report.-The SPC met on February 10, 2009.

  • The Tier 1 Water Budget is included in Appendix 7 of this report.

Related to Tier 1 Water

  • Tier 1 Help Desk means Customer's point of contact(s) to provide all Tier 1 Support within Customer's organization(s).

  • Tier 1 Support means the Technical Support provided by the Tier 1 Help Desk.

  • Tier 3 Wire Centers are those Embarq Wire Centers that are not Tier 1 or Tier 2 Wire Centers.

  • Tier 2 means the portion of the design- related information contained in the generic DCD that is approved but not certified by this appendix (Tier 2 information). Compli- ance with Tier 2 is required, but generic changes to and plant-specific departures from Tier 2 are governed by Section VIII of this appendix. Compliance with Tier 2 pro- vides a sufficient, but not the only accept- able, method for complying with Tier 1. Compliance methods differing from Tier 2 must satisfy the change process in Section VIII of this appendix. Regardless of these dif- ferences, an applicant or licensee must meet the requirement in Section III.B of this ap- pendix to reference Tier 2 when referencing Tier 1. Tier 2 information includes:

  • Tier 1 means the portion of the design-related information contained in the generic DCD that is approved and certified by this appendix (Tier 1 information). The design descriptions, interface requirements, and site parameters are derived from Tier 2 information. Tier 1 information includes:

  • Tier 1 Capital means Tier 1 Capital for the purposes of the Capital Regulations;

  • Potable water means water which meets the requirements of 35 Ill. Adm. Code 604 for drinking, culinary, and domestic purposes.

  • Tier 1 Wire Centers means those CenturyLink Wire Centers that contain at least four (4) Fiber- based Collocators, at least thirty-eight thousand (38,000) Business Lines, or both. Tier 1 Wire Centers also are those CenturyLink tandem switching locations that have no line-side switching facilities, but nevertheless serve as a point of traffic aggregation accessible by CLEC. Once a Wire Center is determined to be a Tier 1 Wire Center, that Wire Center is not subject to later reclassification as a Tier 2 or Tier 3 Wire Center.

  • Tier 2 Capital has the meaning given to the term “Tier 2 capital” in 12 C.F.R. Part 217, as amended, modified and supplemented and in effect from time to time or any replacement thereof.

  • Tier 2 Support means the Esri Technical Support provided to the Tier 1 Help Desk when a Case cannot be resolved through Tier 1 Support.

  • waste water means used water containing substances or objects that is subject to regulation by national law.

  • Tier 2 Wire Centers means those CenturyLink Wire Centers that are not Tier 1 Wire Centers, but contain at least three (3) Fiber-based Collocators, at least twenty-four thousand (24,000) Business Lines, or both. Once a Wire Center is determined to be a Tier 2 Wire Center, that Wire Center is not subject to later reclassification as a Tier 3 Wire Center.

  • H1, H2 etc means First Highest, Second Highest Offers etc. in Disposal Tenders means

  • Fresh water means water, such as tap water, that has not been previously used in a process operation or, if the water has been recycled from a process operation, it has been treated and meets the effluent guidelines for chromium wastewater.

  • Non-potable water means water not safe for drinking, personal, or culinary use as determined by the requirements of 35 Ill. Adm. Code 604.

  • Baseline means the “Initial Small Business Lending Baseline” set forth on the Initial Supplemental Report (as defined in the Definitive Agreement), subject to adjustment pursuant to Section 3(a).

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Ground water means water below the land surface in a zone of saturation.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Additional Tier 1 Capital means capital which is treated as Additional Tier 1 capital (or any equivalent or successor term) under CRD IV requirements by the Relevant Regulator for the purposes of the Issuer and the Group;

  • Baseline data means information gathered at a selected point in time and used thereafter as a basis from which to monitor change.

  • Unpolluted water means water of quality equal to or better than the effluent criteria in effect or water that would not cause violation of receiving water quality standards and would not be benefited by discharge to the sanitary sewers and wastewater treatment facilities provided.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Minor source baseline date means the earliest date after the trigger date on which a major stationary source or a major modification subject to 40 CFR 52.21 or to regulations approved pursuant to 40 CFR 51.166 submits a complete application under the relevant regulations. The trigger date is:

  • Navigable waters ’ means the waters of the United States, including the territorial sea;