Adjacent Off-site Arrangement Sample Clauses

Adjacent Off-site Arrangement. Where Physical Collocation space within AT&T-13STATE Eligible Structure is Legitimately Exhausted, and Collocator’s Adjacent On-site space is not within fifty feet (50 ft.) of the Eligible Structure’s outside perimeter wall, the Collocator has the option and AT&T-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible.
AutoNDA by SimpleDocs
Adjacent Off-site Arrangement. Where Physical Collocation space within AT&T-13STATE Eligible Structure is Legitimately Exhausted, and the Collocator’s Adjacent On-site space is not within 50 ft. of the Eligible Structure’s outside perimeter wall, the Collocator has the option and AT&T-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible. The Adjacent Off-site Arrangement is available if the Collocator’s site is located on a property that is contiguous to or within one standard city block of AT&T-13STATE’s Central Office or Eligible Structure.
Adjacent Off-site Arrangement. Where Physical Collocation space within SBC-13STATE Eligible Structure is Legitimately Exhausted, and the Collocator’s Adjacent On-site space is not within 50 ft. of the Eligible Structure’s outside perimeter wall, the Collocator has the option and SBC-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible. The Adjacent Off- site Arrangement is available if the Collocator’s site is located on a property that is contiguous to or within one standard city block of SBC-13STATE’s Central Office or Eligible Structure. 2.3.1 Such arrangement shall be used for interconnection or access to 251(c)(3) UNEs. When the Collocator elects to utilize an Adjacent Off-site Arrangement, the Collocator shall provide both the AC and DC power required to operate such facility. The Collocator may provide its own facilities to SBC-13STATE’s premises or to a mutually agreeable meet point from its Adjacent Off-site location for interconnection purposes. The Collocator may subscribe to facilities available in the UNE rate schedule of the Collocator’s Agreement. The rates established in this Appendix for Adjacent Off-site Arrangement apply only if Collocator’s Adjacent off-site Arrangement is located on a property that is contiguous to or within one standard city block of SBC-13STATE’s Central Office or Eligible Structure. 2.3.2 At the time the Collocator requests this arrangement, the Collocator must provide information as to the location of the Adjacent Off-site facility, the proposed method of interconnection, and the time frame needed to complete provisioning of the arrangement. SBC-13STATE shall provide a response to Collocator within ten (10) days of receipt of the application, including a price quote, provisioning interval, and confirmation of the manner in which the Adjacent Off-site Facility will be interconnected with SBC-13STATE’s facilities. SBC-13STATE shall make best efforts to meet the time intervals requested by Collocator and, if it cannot meet the Collocator’s proposed deadline, shall provide detailed reasons, as well as proposed provisioning intervals. 2.3.3 In the event that interior space in an Eligible Structure becomes available, SBC-13STATE will provide the option to the Collocator to relocate its equipment from an Adjacent or an Adjacent Off-site Facility into the interior space. In the event the Collocator chooses to relocate its equipment into the interior space, appropriate charges applicable for collocation with...
Adjacent Off-site Arrangement. Where Physical Collocation space within SBC-13STATE Eligible Structure is Legitimately Exhausted, and Collocator’s Adjacent On-site space is not within fifty feet (50 ft.) of the Eligible Structure’s outside perimeter wall, the Collocator has the option and SBC-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible.
Adjacent Off-site Arrangement. Where Physical Collocation space within SBC-13STATE Eligible Structure is Legitimately Exhausted, and the Collocator’s Adjacent On-site space is not within 50 ft. of the Eligible Structure’s outside perimeter wall, the Collocator has the option and SBC-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible. The Adjacent Off-site Arrangement is available if the Collocator’s site is located on a property that is contiguous to or within one standard city block of SBC-13STATE’s Central Office or Eligible Structure.
Adjacent Off-site Arrangement. Where Physical Collocation space within AT&T-13STATE Eligible Structure is Legitimately Exhausted, and Wireless Collocator’s Adjacent On-site space is not within fifty feet (50 ft.) of the Eligible Structure’s outside perimeter wall, the Wireless Collocator has the option and AT&T-13STATE shall permit an Adjacent Structure Off-site Arrangement, to the extent technically feasible. 7.6.1.6.1 The Adjacent Off-site Arrangement is available if the Wireless Collocator’s site is located on a property that is contiguous to or within one (1) standard city block of the AT&T-13STATE Central Office or Eligible Structure. 7.6.1.6.2 Such arrangement shall be used for interconnection. 7.6.1.6.3 When the Wireless Collocator elects to utilize an Adjacent Off-site Arrangement, the Wireless Collocator shall provide both the AC and DC power required to operate such facility. The Wireless Collocator may provide its own facilities to AT&T-13STATE’s premises or to a mutually agreeable meet point from its Adjacent Off-site location for interconnection purposes. 7.6.1.6.4 At the time the Wireless Collocator requests this arrangement, the Wireless Collocator must provide information as to the location of the Adjacent Off-site facility, the proposed method of interconnection, and the time frame needed to complete provisioning of the arrangement. AT&T-13STATE shall provide a response to Wireless Collocator within ten (10) days of receipt of the application, including a price quote, provisioning interval, and confirmation of the manner in which the Adjacent Off-site Facility will be interconnected with AT&T-13STATE’s facilities. AT&T-13STATE shall make best efforts to meet the time intervals requested by Wireless Collocator and, if it cannot meet the Wireless Collocator’s proposed deadline, shall provide detailed reasons, as well as proposed provisioning intervals.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!