Salary Schedule The salaries of employees covered by this agreement are set forth in the salary schedule in Appendix A which is attached to and incorporated into this agreement.
Salary Schedules (a) The salary schedules shall be incorporated into this Agreement as Appendix V. (b) Salary schedules will contain Career Enhancement/Growth steps as described in Section 45.6.
Placement on Salary Schedule The following rules shall be applicable in determining placement of a teacher on the appropriate salary schedule.
Shift Schedule The words "shift schedule" when used in this Agreement shall mean a timetable of the shifts and off days assigned to a position or group of positions which commences at the beginning of a pay period and includes one complete rotation of said shifts.
Recovery Schedule If the initial schedule or any current updates fail to reflect the Work’s actual plan or method of operation, or a contractual milestone date is more than fifteen (15) days behind, Owner may require that a recovery schedule for completion of the remaining Work be submitted. The Recovery Schedule must be submitted within seven (7) calendar days of Owner’s request. The Recovery Schedule shall describe in detail Construction Contractor’s plan to complete the remaining Work by the required Contract milestone date. The Recovery Schedule submitted shall meet the same requirements as the original Construction Schedule. The narrative submitted with the Recovery Schedule should describe in detail all changes that have been made to meet the Contract milestone dates.
Salary Scale The salary scale applicable to Employees shall be set out hereinafter in the Wage Schedule.
Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.
EMPLOYEE CATEGORIES All employees fall into one or the other of four principal categories as outlined below.
Salary Scales 2.5.1 Effective from 1 January 2024, and subject to the Remuneration provisions in the Terms of Settlement, a 4% increase will apply to all paid and printed rates. The following Allied Divisions shall refer to the applicable schedules for their scales: MIT, UCOL and Otago. 2.5.2 Effective from 1 January 2025, kaimahi will be translated into the following salary scale, which includes the 4% salary increase: Band Step (N/A for UCOL and TOPNZ) Scale Scale 2025 (4%) 40 hours Band Step(N/A for UCOL and TOPNZ Scale 2025 (4%) Scale 2025 (4%)
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.