BREAKDOWN MAINTENANCE Sample Clauses

BREAKDOWN MAINTENANCE. (a) Breakdown maintenance is to be carried out in the event of breakdown of equipment which prevents the operation of the equipment. Breakdown maintenance includes faultfinding / repair / replacement of defective parts and functional checking.
AutoNDA by SimpleDocs
BREAKDOWN MAINTENANCE. 1.1.6. Maintenance of proper records of operation and maintenance (Log book, registers, check list etc.)
BREAKDOWN MAINTENANCE. Initiated by technical of functional defects. Call registration of defects is handled by the RIM application manager (see IB list).
BREAKDOWN MAINTENANCE. 1. If any of the problems is not attended on the same day suitable System/Spare / Equipment should be replaced immediately.
BREAKDOWN MAINTENANCE. Breakdown maintenance is to be carried out in the event of breakdown of equipment which prevents the operation of the equipment. Breakdown maintenance includes faultfinding / repair / replacement of defective parts and functional checking. Down time: The maximum allowable downtime shall be two days. Intimation of breakdown of equipment: Intimation of defects in equipment will be through a Complain Register which shall be maintained by the Computer Services Department of the Corporation at its Head Office at Cuttack. The Contractor’s Service Engineer shall attend to the calls as per the Complaint Register and repair the equipments to the satisfaction of the users. After completion of the repair the details of the faults rectified and repair carried out shall be recorded in brief. After the system is made operational it has to be accepted by the HoD, Computer Service Department or the staff authorized by him and sign in the complaint register closing the complaint. Spares required for maintenance: All defective parts shall be replaced or repaired by the Contractor free of cost and the defective parts are the property of the Contractor. The defective / unserviceable items shall be allowed to be taken by the Service Engineer of Contractor, only after HoD, Computer Service Department of the corporation is satisfied that it does not contain any classified / technical data, with proper gate pass duly signed by competent authorities at OSFC. The Contractor shall stock sufficient spares to carry out timely repair and maintenance to keep down time minimum as specified in Para 2 (b) (I) and (II).
BREAKDOWN MAINTENANCE. The vendor should attend the breakdown call within 6 hours and resolve the call within 48 hours after reporting the call. In case the call is resolved after 48 hours, penalty of Rs 200 per day will be applicable after 48 hours till the call is resolved subject to the ceiling of 5% of PO value. 5)Payment terms: Quartely after preventive maintenance is done. Technical Specifications: Denco PAC FGCRC11D, Sl No: P19A0060 to P19A0065 03 TON Wall Mounted Precision Air Conditioner: Technical Specifications:
BREAKDOWN MAINTENANCE. 2.2 The Vendor will carry out all breakdown maintenance after receiving information (written or oral) from HPCL officials or their representatives, Dealer or their representative or from helplines of HPCL. The Vendor’s authorised service representative will carry out the required repairs of the Solar PV System installed by the vendor against order no and inform HPCL/dealer office about the status of site. The breakdown maintenance report will be submitted.
AutoNDA by SimpleDocs
BREAKDOWN MAINTENANCE. Unlimited Breakdown Support Breakdown Maintenance includes fault finding, repair or replacement of defective parts and functional checking, supply of refrigerant and leakage repairing to ensure smooth functioning of PAC.
BREAKDOWN MAINTENANCE. In case emergency reported by NPCIL through e-mail/ fax/ telephone. The Contractor shall ensure inspection of defective equipment by their authorized Service engineer within a period of 3 days from time of reporting and shall restore the machine operation through necessary repair maintenance including provision of required spares within next 10 days at no extra cost to Purchaser.
BREAKDOWN MAINTENANCE a) Failures involving brake adjustments, electrical failures such as connectors, contact failures, fuse wire, slip ring/brush contact failures, electrical/electronic component failure and such other failures shall be attended by the contractor as part of the AMC contract.
Time is Money Join Law Insider Premium to draft better contracts faster.