CABLE MARKING REQUIREMENTS Sample Clauses

CABLE MARKING REQUIREMENTS. All interconnecting cables and wiring shall be marked at each cable termination and conductor termination (hot, neutral, positive, negative, and ground) and at each watertight bulkhead or deck with circuit or system identification. Power distribution wiring shall be marked to indicate phase and polarity. All cables shall be suitably identified throughout their length with cable tags identifying the circuit designation. The tags shall be fabricated from strip aluminum or bronze with raised lettering and shall be securely fastened to the cable by metal banding.
AutoNDA by SimpleDocs
CABLE MARKING REQUIREMENTS. All interconnecting cables and wiring shall be marked at each termination and at each watertight bulkhead or deck with circuit or system identification. Power distribution wiring shall be marked to indicate phase and polarity. All cables shall be suitably identified throughout their length with cable tags identifying the circuit designation. The tags shall to be fabricated from strip aluminum or bronze with raised lettering and shall be securely fastened to the cable by banding with metal bands. Cable identification for the AC Electrical System and the Emergency Lighting System shall be based on contract drawings: • 843-B720-01 AC ELECTRICAL SYSTEM ONE-LINE DIAGRAM • 843-B725-01 AC VOLTAGE DROP & CABLE SCHEDULE Cable identification for the DC Electrical Systems shall be in accordance with the DC electrical cable schedule required to be developed in accordance with contract Clause C725.

Related to CABLE MARKING REQUIREMENTS

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Metering Requirements Seller shall comply with all applicable rules in installing a meter appropriate for deliveries pursuant to the Full Buy/Sell or Excess Sale arrangement selected in paragraph 2.2, above, which can be electronically read daily by:

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Bidding Requirements The Advertisement or Invitation to Bid, Instructions to Bidders, Bid security form, if any, and the Bid form with any supplements.

  • Initial Forecasts/Trunking Requirements Because Verizon’s trunking requirements will, at least during an initial period, be dependent on the Customer segments and service segments within Customer segments to whom CSTC decides to market its services, Verizon will be largely dependent on CSTC to provide accurate trunk forecasts for both inbound (from Verizon) and outbound (to Verizon) traffic. Verizon will, as an initial matter, provide the same number of trunks to terminate Reciprocal Compensation Traffic to CSTC as CSTC provides to terminate Reciprocal Compensation Traffic to Verizon. At Verizon’s discretion, when CSTC expressly identifies particular situations that are expected to produce traffic that is substantially skewed in either the inbound or outbound direction, Verizon will provide the number of trunks CSTC suggests; provided, however, that in all cases Verizon’s provision of the forecasted number of trunks to CSTC is conditioned on the following: that such forecast is based on reasonable engineering criteria, there are no capacity constraints, and CSTC’s previous forecasts have proven to be reliable and accurate.

  • Screening Requirements Xxxxxx shall ensure that all prospective and current Covered Persons are not Ineligible Persons, by implementing the following screening requirements.

  • Training Requirements Grantee shall:

Time is Money Join Law Insider Premium to draft better contracts faster.