CONFORMITY OF PRODUCTION AND ROUTINE TESTS. 10.1. The helmet or visor approved under this Regulation (whether the visor is approved as such or as forming part of the helmet), having satisfied the acceptability conditions of production qualification, shall be so manufactured as to conform to the type approved by complying with the requirements set out in paragraphs 6. and 7.
AutoNDA by SimpleDocs
CONFORMITY OF PRODUCTION AND ROUTINE TESTS. 11.MODIFICATION AND EXTENSION OF APPROVAL OF A CHILD RESTAINT SYSTEM 12.PENALTIES FOR NON-CONFORMITY OF PRODUCTION 13.PRODUCTION DEFINITELY DISCONTINUED 14.INFORMATION FOR USERS 15.TRANSITIONAL PROVISIONS 16.NAMES AND ADDRESSES OF TECHNICAL SERVICES RESPONSIBLE FOR CONDUCTING APPROVAL TESTS, AND OF ADMINISTRATIVE DEPARTMENTS The Parties to the 1958 Agreement applying this Regulation shall communicate to the United Nations Secretariat the names and addresses of the technical services responsible for conducting approval tests and of the administrative departments which grant approval and to which forms certifying approval or extension or refusal or withdrawal of approval, or production definitely discontinued, issued in other countries, are to be sent. page 30 Annex 4 Annex 1 A Annex 1 B Annex 2 A Annex 2 B Regulation No. XXX page 31 Annex 4 Annex 4 CORROSION TEST
CONFORMITY OF PRODUCTION AND ROUTINE TESTS. The conformity of production procedures shall comply with those set out in the Agreement, Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2), with the following requirements:

Related to CONFORMITY OF PRODUCTION AND ROUTINE TESTS

  • Conformity of production The conformity of production procedures shall comply with those set out in the Agreement, Appendix 2 (E/ECE/324-E/ECE/TRANS/505/Rev.2), with the following requirements:

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Inspections and Testing Each Interconnected Entity shall perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Customer Facility with the Transmission System in a safe and reliable manner. Each Interconnected Entity shall have the right, upon advance written notice, to request reasonable additional testing of an Interconnected Entity’s facilities for good cause, as may be in accordance with Good Utility Practice.

  • Inspections and Tests 26.1 The Supplier shall at its own expense and at no cost to the Procuring Entity carry out all such tests and/or inspections of the Goods and Related Services as are specified in the SCC.

  • Development Requirements The exterior wall standards set forth in this section shall apply to the structures located on the Property. At least ninety percent (90%) of the combined exterior surface area of all walls, including all stories of buildings / structures, shall consist of stone, brick, painted or tinted stucco, and factory tinted (not painted) split faced concrete masonry unit or similar material approved by the Director of Planning.

  • Penalties for non-conformity of production 9.1. The approval granted in respect of a vehicle type pursuant to this Regulation may be withdrawn if the requirements set forth above are not met.