Data Entry Quality Control Sample Clauses

Data Entry Quality Control. ‌ Field sheets will be organized, reviewed for completeness and placed in a labeled file folder by the team leader. The fillable PDF data collection worksheets flags entries or values that are not consistent with that expected for the metric. NHNM trained support staff will enter the data into NHNM database other than the individual who filled out the field sheet. Should any questions arise, the data entry personnel will add a note to the field sheet and contact the field team member to answer that question. When each data point from a page has been addressed, the data entry staff person will sign and date the field sheet. The NHNM Program Manager and the WPC will review all data, using standardized exported reports that identify missing values and outliers. B6 Instrument/Equipment Testing, Inspection, and Maintenance‌ The NHNM Team Coordinator is responsible for inspecting equipment and supplies before leaving for field data collection field trips and upon return to NHNM office. The equipment used to collect physical measurements include a survey device (e.g. laser level, auto level, theodolite, or total station depending on the contractor), global positioning system unit (GPS), camera, and, if time and funding are available, soil moisture probes. For groundwater monitoring, up to ten piezometers will be installed at headwater slope wetland sites advantageous to supporting groundwater metric development. In Situ Level Troll 500, 0‐15psig level trandsducer/logger (guage pressure), ABS will be installed at each piezometer site. All field equipment will be inspected prior to each sampling trip. All instruments and equipment will be tested, inspected and maintained in accordance with the manufacturer's specifications as included in the associated instrument/equipment manual. Maintenance logs are maintained for all SWQB instruments and equipment. Consultants will use their own equipment. Results of equipment inspections will be noted in the maintenance log and/or project file. Any deficiencies in equipment will be noted and reported immediately. If condition of equipment is in doubt, it will not be used. In the event of instrument failure the NHNM Team Leader or the SWQB Technical Team Member will correct the problem, rejecting the resultant data or accepting the data with notations. B7 Instrument/Equipment Calibration and Frequency‌ Rosgen Level 2 measurements will employ laser level or total station equipment for conducting cross‐section and longitudinal pro...
AutoNDA by SimpleDocs

Related to Data Entry Quality Control

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Data Quality 4.1 Each party ensures that the shared Personal Data is accurate.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!