Elementary P Sample Clauses

Elementary P. E. and Elementary Music teacher are limited to a maximum of 9 classes sessions/day and overload pay will be paid at the rate below: Elementary PE/Music class size Daily Overload Pay (Paid Quarterly) Grades K-3 29th student $5.00/class/day Grades 4-6 32nd student $5.00/class/day
AutoNDA by SimpleDocs
Elementary P. E. and elementary music specialists who have a valid Washington State Certificate for elementary classroom teaching positions and who have at least two (2) years successful experience teaching elementary P.E. or elementary music will qualify for elementary positions consistent with their certification.
Elementary P. E. and Science Specialists’ class size shall not exceed thirty-four (34). Special Day Class students, when an instructional aide is also present, shall not be counted in the CSM. The SDC teacher(s), specialist teacher(s), affected grade level teachers, site administrator and one (1) site NTA representative shall meet and confer as necessary to discuss methods to mitigate the number of such SDC students attending specialist classes at one time.
Elementary P. E. and Elementary Music teacher are limited to a maximum of seven

Related to Elementary P

  • Elementary a minimum of 250 minutes weekly for a full 5-day week (no less than a 30-minute block of time on each day)

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" 1 Panes not exceeding 0,1 m2 m2 3 SFD4 Bill No. 11 GLAZING Item No Quantity Rate Amount SECTION 3 BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 7 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 13 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 2 Section No. 2 SFD4 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SFD4 1 EARTHWORKS 38 2 CONCRETE,FORMWORK AND REINFORCEMENT 40 3 MASONRY 43 4 WATERPROOFING 44 5 ROOF COVERINGS 46 6 CARPENTRY AND JOINERY 48 7 IRONMONGERY 50 8 METALWORK 51 9 PLASTERING 52 10 PLUMBING AND DRAINAGE 54 12 PAINTWORK 56 Carried to Final Summary Section No. 2 SFD4 BVI CONSULTING ENGINEERS Amount R No SECTION 3 BILL NO.1 EARTHWORKS SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 65 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 65 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 16 4 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 5 Soft rock m3 20 6 Hard rock m3 20 Extra over all excavations for carting away: 7 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 8 Carried Forward Section No. 3 SMD2 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R 8 Sides of trench and hole excavation not exceeding 1,5m deep. m2 46 9 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 10 Under floors, steps, pavings, etc. m3 6 11 Backfilling to trenches, holes, etc. m3 9 12 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 21 13 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 37 14 Modified AASHTO Density tests No 5 15 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 21 Section No. 3 SMD2 Bill No. 1 EARTHWORKS

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!