Engineering, Design and Construction Sample Clauses

Engineering, Design and Construction. The HPL Facilities and the HPL Operated Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”) and with sound and prudent natural gas industry practice. The BPE Facilities shall be designed, installed and constructed by BPE in accordance with sound and prudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the BPE Plant.
AutoNDA by SimpleDocs
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). The RNP Facilities shall be designed, installed and constructed by RNP or its designee in accordance with sound and prudent natural gas industry practice. The HPL Operated Facilities shall be designed, installed and constructed by HPL or its designee in accordance with the Standards and with sound and prudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the RNP Plant.
Engineering, Design and Construction. The HPL Facilities, except for HPL’s hot tap and valve on HPL’s Pipeline, and HPL’s EFM/SCADA, RTU, chromatograph and communication equipment, shall be designed, installed, and constructed by TEJAS HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be reasonably amended or supplemented from time to time (the “Standards”). The HPL Operated Facilities shall be designed, installed, and constructed by TEJAS or its designee in accordance with Engineering Standards. HPL shall install HPL’s hot tap, valve, chromatograph, EFM/SCADA, RTU and communication equipment. Prior to the commencement of construction, TEJAS shall submit all construction, material and equipment drawings and specifications for the HPL Operated Facilities to HPL for HPL’s approval. Such approval shall not be unreasonably withheld. HPL shall review such drawings and specifications within ten (10) days of receipt thereof. The TEJAS Facilities, except for the HPL Operated Facilities, shall be designed, installed and constructed by TEJAS in accordance with sound and prudent natural gas industry practice. HPL may conduct onsite inspections of the TEJAS Facilities and HPL Operated Facilities of at the Interconnect during and after construction. Upon request by HPL, TEJAS shall provide, as to facilities constructed by TEJAS, the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings, purchase orders, mill reports for pipe and any other material information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the TEJAS Pipeline.
Engineering, Design and Construction. 1. Main Contents Party A shall provide the following services under the Appendix for Party B in terms of engineering design and construction: 1.1 Engineering design, including: Planning and design, engineering investigation, communications circuit engineering (including pipeline projects, fiber and power cable projects, and overhead pole line projects), communications equipment projects (including phone switching projects, transmission projects, data and multimedia projects, communications power and air-conditioning projects, microwave communications projects and technical support system projects) and corporate communications projects; 1.2 Engineering construction, including: Communications equipment, communications lines, communications power (including air conditioners for communications), communications pipelines and technical service support system; 1.3 Engineering supervision; and 1.4 IT services, including: Office automation, software testing, network upgrading, R&D of new services, and development of support systems.
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time and in accordance with sound and prudent industry standards (the “Standards”). The TGPL Facilities and TGPL Operated Facilities shall be designed, installed and constructed by TGPL in accordance with sound and prudent industry standards and in accordance with the provisions of the Gas Measurement Committee Report No. 3 of the American Gas Association, as revised in 1985 and as amended and/or supplemented from time to time. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the TGPL Pipeline.
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time and in accordance with sound and prudent industry standards (the “Standards”). The TGPL Operated Facilities shall be designed, installed and constructed by HPL in accordance with specifications provided by TGPL which shall be consistent with natural gas industry practice and in accordance with the provisions of the Gas Measurement Committee Report No. 3 of the American Gas Association, as revised in 1985 and as amended and/or supplemented from time to time. The TGPL Facilities shall be designed, installed and constructed by TEJAS in accordance with sound and prudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the TGPL Pipeline.
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). The BEP Facilities shall be designed, installed and constructed by BEP in accordance with sound and prudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the BEP Plant.
AutoNDA by SimpleDocs
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). The HPL Operated Facilities shall be designed, installed and constructed by CPS in accordance with the Standards at CPS’ sole cost and expense. Prior to the commencement of construction, CPS shall submit all construction, material and equipment drawings and specifications to HPL for HPL’s approval which shall not be unreasonably withheld. HPL shall review such drawings and specifications within ten (10) days of receipt thereof. The CPS Facilities shall be designed, installed and constructed by CPS in accordance with the Standards at CPS’ sole cost and expense. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the CPS Pipeline. Reimbursement of Costs. CPS shall pay to HPL a one time lump sum payment of $99,000.00 for all direct and indirect costs associated with the design, installation, procurement, and construction of the HPL Facilities.
Engineering, Design and Construction. The Interconnect shall be engineered, designed and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time and sound and prudent natural gas pipeline industry practice (the “Standards”), within four (4) months following delivery by Xxxxxxxx to HPL of a written notice to proceed (the "Notice to Proceed"). Xxxxxxxx and HPL may conduct onsite inspections of the Interconnect and meter station during and after construction during normal work hours. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the Xxxxxxxx Facilities.
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). The CORAL Facilities shall be designed, installed and constructed by CORAL in accordance with the Standards. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the CORAL Pipeline, which shall in no event occur later than ______________, 2000.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!