Excavations and Trenches. The Contractor shall coordinate excavating and trenching work with the WPCB Shift Supervisor, designee or Safety Specialist. The design of sloping and benching systems, support systems, shield systems or other protective systems shall conform to, at a minimum, to the OSHA requirements detailed in 29 CFR 1926 Subpart P and VDLI requirements. The Contractor shall submit a copy of the completed review to the designated WPCB Engineer or Safety Specialist prior to the start of work. When this design requires review and approval by a registered professional engineer, the Contractor will be required ro procure those services at the Contractor’s cost. , The Contractor shall notify the WPCB designated person of the name of the individual that is to serve as the Contractor’s ‘Competent person’ as defined by OSHA/VDLI regulations. The Contractor’s designated ‘Competent person’ shall maintain a written log of the daily inspections made of excavations, adjacent areas, and protective systems. A copy of these written logs shall be made available to the WPCB Safety Specialist or WPCB designeeupon request. Substantial physical barricades to prevent persons from falling into an open trench shall be maintained around the perimeter of trenches. This is especially important for trenches that must remain open overnight. Snow fencing or the equivalent, tape, and plastic caution tape/ribbon Are not acceptable. All areas of 29 CFR 1926 Subpart P and VDLI regulation must be followed. Anyone proposing to excavate, dig, bore, tunnel, blast or disturb the earth in any manner which may damage buried utilities is required to call Miss Utility of Virginia at 0-000-000-0000 48 hours (2 working days) before starting the proposed work. All Miss Utility Tickets must be cleared before work begins, to check for cleared tickets call 0-000-000-0000. Just waiting 48 does not necessarily mean you may start excavations, you must make phone contact to ensure ticket is clear before beginning work.
AutoNDA by SimpleDocs
Excavations and Trenches a. Any excavation or trench five feet or more in depth will be provided cave-in protection through shoring, sloping, benching, or the use of hydraulic shoring, trench xxxxxxx, or trench boxes. Trenches less than five feet in depth and showing potential of cave-in will also be provided cave-in protection. Specific requirements of each system are dependent upon the soil classification as determined by a competent person.

Related to Excavations and Trenches

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Hazing Hazing is a process, based on tradition that is used by groups to maintain a hierarchy (i.e., a pecking order) within the group. Regardless of consent, the rituals require individuals to engage in activities that are physically and/or psychologically stressful. These activities can be humiliating, demeaning, intimidating, and exhausting, all of which results in physical or emotional discomfort. Hazing is about group dynamics and proving one’s worthiness to become a member of a specific group. The newcomer, or victim, is hazed. Once accepted by the group, the victim may become a bystander, watch others get hazed, achieve senior status, and ultimately become a perpetrator of hazing. In New Jersey, hazing is a separate criminal offense under N.J.S.A. 2C:40-3. School officials should be aware that hazing which involves the participation of a coach or a teacher may also constitute child abuse. Hazing may also involve other predicate crimes, such as sexual assault. Hazing may also constitute HIB. As noted in Article 4.4.2, although HIB is not a separately defined criminal offense, the conduct that constitutes bullying may constitute one or more criminal or disorderly person offenses, including assault, harassment, threats, robbery and sexual offenses.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.