Excavation and Trenching Sample Clauses

Excavation and Trenching. All trenches 1.2 m (4 ft) or more in depth, shall at all times be supplied with at least one ladder for each 30 m (100 ft) in length or fraction thereof. Ladder shall extendfrom bottom of the trench to at least 90 cm (3 ft) above surface of the ground. Side of the trenches which are 1.5 m (5 ft) or more in depth shall be stepped back to give suitable slope or securely held by timber bracing, so as to avoid the danger of sides collapsing. The excavated materials shall not be placedwithin 1.5 m (5 ft) of the edges of the trench or half of the depth of the trench, whichever is more. Cutting shall be done from top to bottom. Under no circumstances, undermining or undercutting shall be done.
AutoNDA by SimpleDocs
Excavation and Trenching. All trenches, 1.5 (one decimal five) meters or more in depth, shall at all times be supplied with at least 1 (one) ladder for each 20 (twenty) meter length or fraction thereof. The ladder shall be extended from bottom of trench to at least 1 (one) meter above surface of the ground. Sides of
Excavation and Trenching. All trenches 1.2 m (4 ft) or more in depth, shall at all times besuppliedwithatleastoneladderforeach30m(100ft)inlengthorfractionthereof.Laddershallextendf rom bottom of the trench to at least 90 cm (3 ft) above surface of the ground. Side of the trencheswhich are 1.5 m (5 ft) or more in depth shall be stepped back to give suitable slope or securely held bytimberbracing,soastoavoidthedangerofsidescollapsing.Theexcavatedmaterialsshallnotbeplac edwithin 1.5 m (5 ft) of the edges of the trench or half of the depth of the trench, whichever is more.Cutting shall be done from top to bottom. Under no circumstances, undermining or undercutting shallbe done.
Excavation and Trenching. All trenches, 1.5 (one decimal five) meters or more in depth, shall at all times be supplied with at least 1 (one) ladder for each 20 (twenty) meter length or fraction thereof. The ladder shall be extended from bottom of trench to at least 1 (one) meter above surface of the ground. Sides of a trench which is 1.5 (one decimal five) meters or more in depth shall be stepped back to give suitable slope or securely held by timber bracing, so as to avoid the danger of sides collapsing. Excavated material shall not be placed within 1.5 (one decimal five) meters of edge of trench or half of depth of trench, whichever is more. Cutting shall be done from top to bottom. Under no circumstances shall undermining or undercutting be done.
Excavation and Trenching. All excavation related work must be conducted in accordance with OSHA 1926 Subpart P - Excavations, and UPR requirements.
Excavation and Trenching. Contractor shall comply with all aspects of 29 CFR 1926.650; 1926.651; and 1926.652 with applicable appendices.
Excavation and Trenching. Contractor shall comply with all aspects of 29 CFR 1926.650; 1926.651; and 1926.652 with applicable appendices. A. Contractor shall provide Owners the name of the Competent Person who will perform documented inspections of excavations and trenches prior to employee entries. B. Contractor will provide Owners with the methodology used to determine soil classification. C. Contractor shall determine the need and perform any atmospheric testing required prior to entry of employees. D. Contractor shall maintain and make all documents relative to soil classification, protective system selection, inspections, and required training available for Owners to review upon request.
AutoNDA by SimpleDocs
Excavation and Trenching. All trenches 1.2 m. (4ft.) or more in depth, shall at all times be supplied with at least one ladder for each 30m. (100ft.) in length or fraction thereof, Ladder shall extend from bottom of the Trench to at least 90cm (3fts) above the surface of the ground. The sides of the trenches which are 1.5 m. (5 ft.) or more in depth shall be stepped back to give suitable slope or securely held by timber bracing, so as to avoid the danger of sides collapsing. The excavated material shall not be placed within 1.5 m. (5 ft.) of the edges of the trench or half of the depth of the trench whichever is more. Cutting shall be done from top to bottom. Under no circumstances, undermining or undercutting shall be done. (i) All roads and open areas adjacent to the work site shall either be closed or suitably protected. (ii) No electric cable or apparatus which is liable to be a source of danger or a cable or apparatus used by the operator shall remain electrically charged. (iii) All practical steps shall be taken to prevent danger to persons employed from risk of fire or explosion or flooding. No floor, roof or other part of the building shall be so overloaded with debris or materials as to render it unsafe.
Excavation and Trenching. Signature & Name of Contractor Date
Excavation and Trenching. Prior to the commencement of trenching and excavation work, the subcontractor shall submit a JSA and confirm with AHB, Inc. as to the presence of hazardous contaminants in the soils such that proper personal protective equipment, training, and/or air monitoring can be provided. Prior to any disruption of ground, excavation or trenching on this project, the following will be performed:  No groundbreaking, excavation or trenching work will be performed without the presence of a competent person  Underground utility locating authorities must be given the required advance notices to locate and mark the utility  If underground utilities are known or suspected, proper notification will be given to AHB, Inc. Project Management  The competent person will analyze the soil of the work area to determine the condition and type of soil to ascertain proper sloping or shoring requirements During excavation or trenching operations on this project, the following requirements will be followed:  All trenches and excavations six feet or deeper will have as a minimum rigid barricades, signage posted at the work area, and appropriate fall protection, if needed  Trenches or excavations will be sloped or benched in accordance with applicable rules and regulations, and as determined by the competent person  Supporting systems (i.e., shoring, piling, etc.) will be utilized for all trenches and excavations where sloping or benching could not be performed. Trench boxes or xxxxxxx will be utilized if neither of the above is used  Spoil piles and all other material will be placed a minimum of two feet from the edges of all trenches or excavations  When underground utilities are suspected, they will be located first by hand diggingAdequate access must be maintained at all times during trenching or excavating activities. When ladders are used, they will be placed such that no worker travels more than 25 feet lateral in any direction  The competent person will inspect excavations and trenches at the beginning of each day and when conditions change  Excavations in Type C soil will not be benched  Excavations and trenches four feet or greater in depth will be evaluated for confined space  A registered professional engineer must design all excavations over 20 feet in depth. In addition, a registered professional engineer must also design all protective systems for use in excavations more than 20 feet in depth There will be no temporary blocking or occupying of any street, all...