EXPERIMENTAL EQUIPMENT Sample Clauses

EXPERIMENTAL EQUIPMENT. During the ACOBAR Experiment, active acoustic sources and other oceanographic equipment were deployed in Fram Strait. No “experimental” acoustic sources were deployed. All sources are commercially available. The RV and OPV are outfitted with hull-mounted standard active transducers, including echosounders and depth sounders. Additionally, the ACOBAR project scientists used a variety of standard commercial off-the-shelf (COTS) instruments, such as Acoustic Doppler Current Profiler (ADCP) and acoustic modems (Table 1-3). Since these acoustic instruments were unmodified and were used for their intended function, they were not included in the acoustical analysis in this EAR. Additional non- acoustic, standard oceanographic equipment, such as conductivity, temperature, and depth (CTD) instruments, were also deployed to measure other parameters of the physical oceanic environment during the experiment. The WRC moored tomography sound source (Figure 1-2), which was used to generate the tomographic and RAFOS signals, is a swept frequency underwater acoustic projector that is not gas-compensated, with 50% efficiency, and a directivity index (DI) of 3 decibels (dB) in the horizontal direction (Table 1-2). The WRC projector is a micro-tunable organ pipe with a symmetrical Tonpliz transducer. The unit is free-flooded, with a 36 centimeter (cm) (14 in) diameter. Its controller is a 32-bit Motorola MC68CK338 micro-controller, programmable via external SAIL connector, integrated with a 4-channel STAR system (Scripps Institution of Oceanography), with a hybrid Rubidium low-power clock and underwater acoustic navigation. Long-term stability is estimated to be 3 msec for one year. Power is generated from standard alkaline Figure 1-2. WRC acoustic source to be deployed during the ACOBAR Experiment. “D” cell batteries. Endurance is estimated to be up to 3,000 acoustic transmissions, and maximum operating depth is 6,000 m for the electronic housing. The WRC projector is built from aluminum 6061-T6, end-caps are hard anodized, and weight in air is 1,000 kilograms (kg). A WRC source was located at 420 m (Mooring A), 515 m (Mooring B), and 559 m (Mooring C) on the mooring string at each corner of the experimental area (Figure 1-3). The WRC sources transmitted tomographic signals (row 1 of Table 1-2) and RAFOS signals (row 2 of Table 1-2). A vertical line array of STAR (Figures 1-4 and 1-5), developed by Scripps Institution of Oceanography (SIO), was deployed and moored roughly in...
AutoNDA by SimpleDocs

Related to EXPERIMENTAL EQUIPMENT

  • Consumables During the design phase, Purchaser may participate in the selection of suppliers of consumables of the Supplier. In such case, the choice regarding the final selection of the said suppliers shall be mutually agreed between the Parties. Two suppliers shall be identified and selected for each type of consumables.

  • Rental Equipment 7.1 We will at all times own all Rental Equipment supplied to you. You will not let, sell, charge, assign, sub-license or allow a third party to use the Rental Equipment nor remove any labels, and shall not prejudice our rights in the Rental Equipment in any way. We may replace the Rental Equipment from time to time either with your prior consent or provided that the replacement Rental Equipment is of a specification that is at least equal to the Rental Equipment originally supplied and such change does not materially disrupt the provision of the Services.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Equipment and Materials Contractor at its sole cost and expense shall provide and furnish all tools, labor, materials, equipment, transportation services and any other items (collectively, "Equipment") which are required or necessary to perform the Services in a manner which is consistent with generally accepted standards of the profession for similar services. Notwithstanding the foregoing, District shall not be responsible for any damages to persons or property as a result of the use, misuse or failure of any Equipment used by Contractor of the Contracted Parties, even if such Equipment is furnished, rented or loaned to Contractor or the Contracted Parties by District. Furthermore, any Equipment or workmanship that does not conform to the regulations of this Agreement may be rejected by District and in such case must be promptly remedied or replaced by Contractor at no additional cost to District and subject to District’s reasonable satisfaction.

  • Safe Equipment The City shall furnish and maintain in the best possible working condition, within the limits of its financial capability, the necessary tools, facilities, vehicles, supplies, and equipment required for members to safely carry out their duties. Members are responsible for reporting unsafe conditions or practices, for avoiding negligence, and for properly using and caring for tools, facilities, vehicles, supplies, and equipment provided by the City.

  • Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.

  • School Equipment The Association shall have the right to use audio-visual and/or duplicating equipment provided all costs incurred therewith are paid for by the Association. Association use of school equipment shall not interfere with school use. The building principal must approve any Association use that involves a cost.

  • Removal of Equipment and Materials Within 30 days after completion of the requirements of this contract, PURCHASER shall remove from the areas of operations, and other property owned or controlled by STATE, all equipment, materials, and other property PURCHASER has placed or caused to be placed thereon that is not to become the property of STATE. It is agreed that any such equipment, materials, and other property that are not removed within 30 days, shall become the property of STATE and may be used or otherwise disposed of by STATE without notice or obligation to PURCHASER or to any party to whom PURCHASER may transfer title. Nothing in this section shall be construed as relieving PURCHASER from an obligation to clean up and to burn, remove, or dispose of debris, waste materials, and such, in accordance with the provisions of this contract. PURCHASER shall indemnify STATE for expenses as a result of cleanup, removal or disposal of debris, waste materials, and such.

  • Services, Materials, and Equipment Unless otherwise specified, the Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities, incidentals, and services necessary for the construction, performance, testing, start-up, inspection and completion of the Work.

  • Manufacturing (a) The Supplier shall without limitation be responsible, at no additional cost to the Purchaser, for: sourcing and procuring all raw materials for the Products; obtaining all necessary approvals, permits and licenses for the manufacturing of the Products; providing sufficient qualified staff and workers to perform the obligations under this Purchase Agreement; implementing and maintaining effective inventory and production control procedures with respect to the Products; and handling other matters as reasonably requested by the Purchaser from time to time.

Time is Money Join Law Insider Premium to draft better contracts faster.