Frequency Modulation Sample Clauses

Frequency Modulation. (1) Sanming Local Dispatching Agency may arrange the Power Plant to be the frequency modulation plant for the power grid of the local district in accordance with the actual conditions of the power grid in Sanming district, and the Power Plant must carry out the frequency modulation according to the dispatching directions and maintain the power frequency being within the provided range in the Dispatching Regulations. (2) The Power Plant shall participate in the frequency modulation work of the electric power system pursuant to the requirements of the Dispatching Regulations, and fulfill corresponding obligations. (3) Upon the on-grid connection of the generator units, the automatic speed governor system of the Power Plant must be put into operation; in case of any occurrence of the failure or abnormal conditions to the automatic speed governor system of the Power Plant, the staff of the Power Plant shall notice Sanming Local Dispatching Agency immediately and resolve such defaults as soon as possible.
AutoNDA by SimpleDocs
Frequency Modulation. (1) The Power Plant shall participate in the frequency modulation of the power grid. The dispatching center may, according to the actual conditions of the power grid, arrange the Power Plant to be the modulation plant of the power grid and to carry out operation in accordance with the curve released by the dispatching center. The Power Plant must comply with the dispatching instructions and maintain the grid frequency within the scope prescribed by the Dispatching Code or the power frequency of the line communicated with the power gird of East China within the regulated scope. (2) In the event that the units of the Power Plant are put into AGC operation as the First dispatching plant; the units of the Power Plant exit from the AGC operation as not the First dispatching plant. The Power Plant shall participate in the frequency modulation of the electric power system in accordance with the requirements of the Dispatching Code for Electric Power System, and fulfill relevant obligations. (3) The installation and operation of the AGC of the Power Plant shall be in accordance with the current policies of the State relating to the power generation plant grid connection and operation management. According to relevant regulations concerning operation management of the power plant connected onto the grid issued by the State Electricity Regulatory Commission, the No. Unit of the Power Plant shall be installed with AGC, the setting parameters and the unit output response speed of which shall comply with the requirements of grid safety operation and shall be uniformly set by the Power Dispatching Agency according to the characteristic of the unit, the testing result and relevant requirements. Party B shall not make alteration arbitrarily. The launch and exit of AGC of the unit shall be executed in accordance with the dispatching instructions. (4) When the power generator has been connected to the power grid, the automatic speed governing system of the Power Plant must be put into operation. In case of any failure or abnormity of the automatic speed governing system of the Power Plant, the staff of the Power Plant shall immediately notify the dispatching center and settle the malfunctions as soon as possible. (5) The Power Plant shall implement relevant management regulations of the dispatching center concerning the primary frequency regulation of the power grid of Fujian Province, and conform to the various management requirements.
Frequency Modulation. FM Hum and Noise – The ratio of suppression of frequency modulated hum and noise Hz – Hertz. IEC – International Electrotechnical Commission. LED- Light Emitting Diode. LCD – Liquid Crystal Display. LLRU – Lowest Level Replacement Unit. MHz – Megahertz. PCM – Pulse Code Modulation. PTT – Push-To-Talk. SINAD – Signal to Noise and Distortion Ratio. TIA – Telecommunications Industry Association. UHF – Ultra-High Frequency VHF – Very-High Frequency VSWR – Voltage Standing Wave Ratio The vendor, and all equipment supplied by the vendor shall comply with The United States Code of Federal Regulations, Title 47 – Telecommunication, Chapter 1Federal Communications Commission Parts 2 and 90. TIA-603 Revision D, Land Mobile FM or PM – Communications Equipment – Measurement and Performance Standards. All radio products shall conform to the Department of Management Services’ (DMS) Technical Specifications as defined in performance characteristics. All radio equipment performance specifications listed below shall be met using TIA-603 Revision D measurement test procedures. The only exceptions shall be environmental specifications that must be met using MIL-STD-810 procedures. The DMS radio performance specifications are presented in table form in Attachment 1 at the end of this document. TIA-102 – Project 25 Series Documents. MIL-STD-810, Environmental Engineering Considerations and Laboratory Test methods and standards identified in these technical specifications. Category 1 products, except Base Stations Repeaters and RF Control Stations, require MIL-STD-810 compliance; the vendor shall comply with the current version of MIL-STD-810, Revision G, of October 2008, including Change Notices. If the vendor is unable to comply with Revision G, they may, as an alternative, comply with Revision F, or Revision E, including change Notices. Specific MIL-STD-810 test methods and standards, listed below for each type of equipment (Category 1), shall be used in place of any corresponding specific TIA-603-D environmental standards to ensure that robust, rugged Public Safety Grade radios and associated equipment are procured. For any TIA-603-D environmental parameter where a MIL-STD-810 test method and standard is not specified below, the TIA-603-D standard shall be applied. For example, base stations are not required to meet any MIL-STD-810 test methods and standards. They will therefore be required to meet all TIA-603-D environmental standards.
Frequency Modulation. (1) The Power Plant shall participate in the frequency modulation of the power grid. The Power Dispatching Agency may, according to the actual conditions of the power grid, arrange the Power Plant to be the modulation plant of the power grid and to carry out operation in accordance with the curve released by the Power Dispatching Agency. The Power Plant must comply with the dispatching instructions and maintain the grid frequency within the scope prescribed by the Dispatching Code. (2) The Power Plant shall participate in the frequency modulation of the electric power system in accordance with the requirements of the Dispatching Code for Electric Power System, and fulfill relevant obligations. (3) When the power generator has been connected to the power grid, the automatic speed governing system of the Power Plant must be put into operation. In case of any failure or abnormity of the automatic speed governing system of the Power Plant, the staff of the Power Plant shall immediately notify the Power Dispatching Agency and settle the malfunctions as soon as possible.
Frequency Modulation. Upon the agreement between and by Party A and Party B, the Power Station (generator units), upon the normal operation of the Cangxi grid, shall be considered as the power station free from frequency modulation; upon the isolated grid operation of the Cangxi grid, the Power Station(generator units) shall be considered as the first frequency modulation power station, the generator units shall be required to participate in the frequency modulation of the power system in accordance with the power system dispatching regulations.
Frequency Modulation. (1) The Power Plant shall participate in the frequency modulation of the power grid. The dispatching center may, according to the actual conditions of the power grid, arrange the Power Plant to be the modulation plant of the power grid and to carry out operation in accordance with the curve released by the dispatching center. The Power Plant must comply with the dispatching instructions and maintain the grid frequency within the scope prescribed by the Dispatching Code. (2) When the power generator has been connected to the power grid, the automatic speed governing system of the Power Plant must be put into operation. In case of any failure or abnormity of the automatic speed governing system of the Power Plant, the staff of the Power Plant shall immediately notify the dispatching center and settle the malfunctions as soon as possible. (3) The launch and exit of AGC of the unit shall be executed in accordance with the dispatching instructions, the setting parameters and the unit output response speed of which shall comply with the requirements of grid safety operation and shall be uniformly set by the Ningde Local Dispatching according to the characteristic of the unit, the testing result and relevant requirements. Party B shall not make alteration arbitrarily. (4) The Power Plant shall implement relevant management regulations of the dispatching center concerning the primary frequency regulation of the power grid of Fujian Province, and conform to the various management requirements.
Frequency Modulation. Theory of Frequency Modulation, characteristics of FM, Generation of FM, pre-emphasis, De-emphasis, wide &Narrowband FM Transmission, FM receiver. Information Theory, Classification of pulse modulation, Sampling process, pulse amplitude modulation, PWM and PPM modulation pulse code modulation.
AutoNDA by SimpleDocs
Frequency Modulation. The Power Plant shall participate in the frequency modulation of the power grid. The dispatching center may, according to the actual conditions of the power grid, arrange the Power Plant to be the modulation plant of the power grid and to carry out operation in accordance with the curve released by the dispatching center. The Power Plant must comply with the dispatching instructions and maintain the grid frequency within the scope prescribed by the Dispatching Code.

Related to Frequency Modulation

  • Human Leukocyte Antigen Testing This plan covers human leukocyte antigen testing for A, B, and DR antigens once per member per lifetime to establish a member’s bone marrow transplantation donor suitability in accordance with R.I. General Law §27-20-36. The testing must be performed in a facility that is: • accredited by the American Association of Blood Banks or its successors; and • licensed under the Clinical Laboratory Improvement Act as it may be amended from time to time. At the time of testing, the person being tested must complete and sign an informed consent form that also authorizes the results of the test to be used for participation in the National Marrow Donor program.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4. 5.7.2 BellSouth shall make available the following channelization systems and interfaces: 5.7.2.1 DS1 Channelization System: channelizes a DS1 signal into a maximum of twenty- four (24)

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Product Changes Vocera shall have the right, in its absolute discretion, without liability to End User, to update to provide new functionality or otherwise change the design of any Product or to discontinue the manufacture or sale of any Product. Vocera shall notify End User at least 90 days prior to the delivery of any Product which incorporates a change that adversely affects form, fit or function (“Material Change”). Vocera shall also notify End User at least 90 days prior to the discontinuance of manufacture of any Product. Notification will be made as soon as reasonably practical for changes associated with regulatory or health and safety issues.