Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.
Protection of the Environment If the Contractor encounters circumstances such as weather conditions or site factors where the Contractor knows or should reasonably know that proceeding with the Work may, directly or indirectly, cause Environmental Damage, the Contractor shall:
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.
Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.
STAFF ORIENTATION 4101 The Employer shall provide an appropriate orientation program for nurses newly employed. The orientation program shall include such essential information as policies, nursing procedures, the location of supplies and equipment, fire, safety and disaster plans. Where necessary, orientation shall be provided for nurses moving to a new area of practice. 4102 The Employer shall provide a program of inservice education for nurses pertinent to patient care. 4103 The Employer shall provide, access to reference materials as is required in relation to maintaining current knowledge of general nursing care. Licensed Practical Nurse 2015 Hourly 25.198 26.022 26.836 27.825 28.732 29.745 30.804 31.420 Monthly 4,231.164 4,369.528 4,506.212 4,672.281 4,824.582 4,994.681 5,172.505 5,275.942 Annual 50,773.970 52,434.330 54,074.540 56,067.375 57,894.980 59,936.175 62,070.060 63,311.300 Nurse II 2015 Hourly 32.917 34.066 35.218 36.419 37.593 38.811 39.587 Monthly 5,527.313 5,720.249 5,913.689 6,115.357 6,312.491 6,517.014 6,647.317 Annual 66,327.755 68,642.990 70,964.270 73,384.285 75,749.895 78,204.165 79,767.805 Nurse II (20 Year Scale) 2015 Hourly 33.575 34.747 35.923 37.148 38.345 39.587 Monthly 5,637.802 5,834.600 6,032.070 6,237.768 6,438.765 6,647.317 Annual 67,653.625 70,015.205 72,384.845 74,853.220 77,265.175 79,767.805 Nurse III 2015 Hourly 34.168 35.321 36.523 37.697 38.787 39.975 41.201 42.025 Monthly 5,737.377 5,930.985 6,132.820 6,329.955 6,512.984 6,712.469 6,918.335 7,056.698 Annual 68,848.520 71,171.815 73,593.845 75,959.455 78,155.805 80,549.625 83,020.015 84,680.375 Nurse III (20 Year Scale) 2015 Hourly 34.851 36.027 37.254 38.451 39.563 40.775 42.025 Monthly 5,852.064 6,049.534 6,255.568 6,456.564 6,643.287 6,846.802 7,056.698 Annual 70,224.765 72,594.405 75,066.810 77,478.765 79,719.445 82,161.625 84,680.375 Nurse IV 2015 Hourly 35.340 36.649 37.959 39.387 41.024 42.612 44.273 45.158 Monthly 5,934.175 6,153.978 6,373.949 6,613.734 6,888.613 7,155.265 7,434.175 7,582.781 Annual 71,210.100 73,847.735 76,487.385 79,364.805 82,663.360 85,863.180 89,210.095 90,993.370 Nurse IV (20 Year Scale) 2015 Hourly 36.047 37.382 38.718 40.175 41.844 43.464 45.158 Monthly 6,052.892 6,277.061 6,501.398 6,746.052 7,026.305 7,298.330 7,582.781 Annual 72,634.705 75,324.730 78,016.770 80,952.625 84,315.660 87,579.960 90,993.370 Nurse V 2015 Hourly 37.305 38.733 40.369 41.957 43.690 45.388 47.157 48.100 Monthly 6,264.131 6,503.916 6,778.628 7,045.280 7,336.279 7,621.402 7,918.446 8,076.792 Annual 75,169.575 78,046.995 81,343.535 84,543.355 88,035.350 91,456.820 95,021.355 96,921.500 Nurse V (20 Year Scale) 2015 Hourly 38.051 39.508 41.177 42.797 44.564 46.296 48.100 Monthly 6,389.397 6,634.052 6,914.305 7,186.330 7,483.038 7,773.870 8,076.792 Annual 76,672.765 79,608.620 82,971.655 86,235.955 89,796.460 93,286.440 96,921.500 Nurse Practitioner 2015 Hourly 42.515 45.635 47.511 49.385 51.408 52.437 Monthly 7,138.977 7,662.877 7,977.889 8,292.565 8,632.260 8,805.046 Annual 85,667.725 91,954.525 95,734.665 99,510.775 103,587.120 105,660.555 Nurse Practitioner (20 Year Scale) 2015 Hourly 43.365 46.548 48.461 50.373 52.437 Monthly 7,281.706 7,816.185 8,137.410 8,458.466 8,805.046 Annual 87,380.475 93,794.220 97,648.915 101,501.595 105,660.555 Weekend Worker - Licensed Practical Nurse 2015 Hourly 28.977 29.925 30.861 31.999 33.042 34.206 35.425 36.133 Monthly 4,865.721 5,024.906 5,182.076 5,373.165 5,548.303 5,743.758 5,948.448 6,067.333 Annual 58,388.655 60,298.875 62,184.915 64,477.985 66,579.630 68,925.090 71,381.375 72,807.995 Weekend Worker - Nurse II 2015 Hourly 37.855 39.176 40.501 41.882 43.232 44.633 45.526 Monthly 6,356.485 6,578.303 6,800.793 7,032.686 7,259.373 7,494.625 7,644.574 Annual 76,277.825 78,939.640 81,609.515 84,392.230 87,112.480 89,935.495 91,734.890 Weekend Worker - Nurse II (20 Year Scale) 2015 Hourly 38.612 39.959 41.311 42.720 44.097 45.526 Monthly 6,483.598 6,709.782 6,936.805 7,173.400 7,404.621 7,644.574 Annual 77,803.180 80,517.385 83,241.665 86,080.800 88,855.455 91,734.890 Weekend Worker - Nurse III 2015 Hourly 39.293 40.619 42.002 43.352 44.605 45.971 47.381 48.329 Monthly 6,597.950 6,820.607 7,052.836 7,279.523 7,489.923 7,719.297 7,956.060 8,115.245 Annual 79,175.395 81,847.285 84,634.030 87,354.280 89,879.075 92,631.565 95,472.715 97,382.935 Weekend Worker - Nurse III (20 Year Scale) 2015 Hourly 40.079 41.431 42.842 44.219 45.497 46.891 48.329 Monthly 6,729.932 6,956.955 7,193.886 7,425.107 7,639.705 7,873.780 8,115.245 Annual 80,759.185 83,483.465 86,326.630 89,101.285 91,676.455 94,485.365 97,382.935 Weekend Worker - Nurse IV 2015 Hourly 40.641 42.146 43.653 45.295 47.177 49.003 50.914 51.932 Monthly 6,824.301 7,077.016 7,330.066 7,605.785 7,921.805 8,228.420 8,549.309 8,720.248 Annual 81,891.615 84,924.190 87,960.795 91,269.425 95,061.655 98,741.045 102,591.710 104,642.980 Weekend Worker - Nurse IV (20 Year Scale) 2015 Hourly 41.454 42.989 44.526 46.201 48.121 49.983 51.932 Monthly 6,960.818 7,218.570 7,476.658 7,757.918 8,080.318 8,392.979 8,720.248 Annual 83,529.810 86,622.835 89,719.890 93,095.015 96,963.815 100,715.745 104,642.980 Weekend Worker - Nurse V 2015 Hourly 42.900 44.543 46.425 48.251 50.244 52.196 54.230 55.315 Monthly 7,203.625 7,479.512 7,795.531 8,102.147 8,436.805 8,764.578 9,106.121 9,288.310 Annual 86,443.500 89,754.145 93,546.375 97,225.765 101,241.660 105,174.940 109,273.450 111,459.725 Weekend Worker - Nurse V (20 Year Scale) 2015 Hourly 43.758 45.434 47.353 49.216 51.249 53.240 55.315 Monthly 7,347.698 7,629.126 7,951.358 8,264.187 8,605.561 8,939.883 9,288.310 Annual 88,172.370 91,549.510 95,416.295 99,170.240 103,266.735 107,278.600 111,459.725 1 Eligibility for the 20 Year increment is determined in accordance w ith Article 2105.