General Topography and Drainage Characteristics Sample Clauses

General Topography and Drainage Characteristics. (N) A comparison of the respective sites under consideration by County with an inventory of positive and negative aspects of each site and a recommendation concerning the optimum site for County's acquisition and development. Programming Option 1
AutoNDA by SimpleDocs
General Topography and Drainage Characteristics. (N) A comparison of the respective sites under consideration by County with an inventory of positive and negative aspects of each site and a recommendation concerning the optimum site for County's acquisition and development. Remainder of page left blank EXHIBIT A, SCOPE OF WORK ATTACHMENT 1: Project Schedule RFP No: S2115731P1 Project Title: Broward County’s Medical Examiner’s Office and BSO’s Crime Lab Combined Facility The required project schedule milestones for this project are presented below. Items marked undetermined require additional development and submittal of the Consultant's Project Development Schedule as required by the Professional Services Agreement for this project. ACTIVITY DATE REQUIRED OR ESTIMATED TIME PERIOD (Calendar days) Pre-Design Phase (Programming 1 and 2) Consultant's Document Preparation & Submittal 73 Days Undetermined County Review 21 Days Undetermined Consultant's Document Correction & Re-Submittal 14 Days Undetermined Pre-Design Phase (Site Analysis and Cost Estimate) 95% Massing Design Concept Report Consultant's Document Preparation & Submittal 83 Days Undetermined County Review 21 Days Undetermined 100% Massing Design Concept Report Consultant's Document Preparation & Submittal 21 Days Undetermined Consultant's Document Correction & Re-Submittal 14 Days Undetermined Pre-Design Phase (Stakeholder Coordination and Public Outreach) Consultant's Document Preparation & Submittal 191 Days Undetermined County Review 21 Days Undetermined Consultant's Document Correction & Re-Submittal 21 Days Undetermined 100% Final Concept Massing Report Submittal Consultant's Document Preparation & Submittal Final Submittal/presentation 14 Days Undetermined EXHIBIT A, SCOPE OF WORK ATTACHMENT 2:‌ Electronic Media Submittal Requirements Preamble The Contract Administrator will be utilizing electronic media as the principal way it develops, communicates and archives information concerning its various construction programs. To that end, County's standard Professional Services Agreements for consultant services require submittal of documents produced on electronic media. The County encourages Building Information Model (BIM) based design and documentation to the maximum extent possible, especially for all major projects including all new construction. For projects utilizing BIM delivery, Consultant will include native BIM format and Industry Foundation Class (IFC) BIM deliverables at all project milestones, with any supplementary two-dimensiona...

Related to General Topography and Drainage Characteristics

  • Topography Altering the existing topography of the Property by digging, plowing, disking, or otherwise disturbing the surface is prohibited, unless Grantee determines such requested action will be carried out consistent with the Restoration Plan and will be carried out in a manner that protects the conservation values. Grantor shall obtain Xxxxxxx’s written permission in advance of commencing such action.

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Subloop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Subloop (USL) elements as specified herein.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

Time is Money Join Law Insider Premium to draft better contracts faster.