INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS Sample Clauses

INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS. The Engineer shall inspect work incorporated into the project as assigned by the State to:
AutoNDA by SimpleDocs
INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS. 1. The Engineer shall inspect work incorporated into the project as assigned by the State. The Engineer shall: a. Verify that the project is built according to the plans and specifications, and all contract documents. b. Verify the accuracy of the work and determine pay quantities by making measurements as assigned by the State. c. Verify all the specifications and special provision requirements are met for inspected items of work, such as, materials, construction, measurement and payment. d. Verify daily quantities for each item of work performed and tabulate into a monthly pay estimate to the contractor. The Engineer shall furnish estimate to the State for execution of payment via Site Manager. e. Enter measurement and payment information daily into Site Manager for the items inspected by the Engineer personnel. f. Complete all fields in Site Manager, unless otherwise directed by the District’s construction personnel. g. Verify all material sourcing information is entered into Site Manager and address all material or testing deficiencies on a monthly basis. 2. The Engineer shall maintain all records on the project in compliance with State and District procedures including Daily Work Reports (DWR), diaries, shop drawings and submittals, RFI drawings and sketches of measured items, sets of plans, record set plans, material on hand forms, and general correspondence. 3. The Engineer shall verify whether drilled shaft or pile installations have been properly performed. Inspector must have knowledge in geological materials to ensure proper founding is achieved, proper underwater and slurry displacement, concrete placement procedures are used, and proper use of steel casing for dewatering and stability applications are implemented. 4. The Engineer shall verify appropriate mill tests, materials approval and Buy America certifications are available as required. 5. The Engineer shall verify Historically Underutilized Business (HUB) documentation; Commercially Useful Function reviews; and Prompt Pay and Wage rate surveys are complete and correct. The Engineer shall verify corrections are made by the contractor.
INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS. The Engineer shall inspect work incorporated into the project as assigned by the State to: DocuSign Envelope ID: 8B47F4E0-92EC-4E2B-A7F3-2A6F4173893E
INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS. Inspect Work Incorporated into Project as assigned by STATE-Verify project is built according to plans and specifications, and all contract documents; verify accuracy of work and determine pay quanities; verify specifications and special provision requirements are met; verify daily quantities for each item of work assigned, performed; enter measurement a payment information daily into Site Manager; verify material sourcing information is entered into Site Manager
INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS 

Related to INSPECTION OF WORK IN PROGRESS AND PROJECT RECORDS

  • Inspection of Work It is FIRST PARTY's obligation to make the work product available for CITY's inspections and periodic reviews upon request by CITY.

  • Project Records Borrower shall: Make and keep books, records, and accounts, in such reasonable detail, so as to fully, accurately, and fairly reflect the activities of Borrower. Record the Project’s assets, liabilities, revenues, expenses, receipts and disbursements in separate accounts from any other assets, liabilities, revenues, expenses, receipts and disbursements of Borrower so as to permit the production of a Statement of Financial Position, a Statement of Profit and Loss (Statement of Activities), and a Statement of Cash Flows for Borrower in which the activities of Borrower are separately identifiable from the activities of the Operator, unless Borrower is also Operator. Devise and maintain a system of internal accounting controls sufficient to provide reasonable assurances that: Transactions are executed, and access to assets is permitted, only in accordance with Xxxxxxxx’s authorization; Transactions are accurately and timely recorded to permit the preparation of quarterly and annual financial reports in conformity with applicable Program Obligations; Transactions are timely recorded in sufficient detail so as to permit an efficient audit of the Borrower’s books and records in accordance with Generally Accepted Auditing Standards (GAAS), Generally Accepted Government Auditing Standards (GAGAS), and other applicable Program Obligations; and Transactions are timely recorded in sufficient detail so as to maintain accountability of the Borrower’s assets. The recorded accountability for assets shall be compared with the existing assets at reasonable intervals, but not less than annually, and appropriate action shall be taken with respect to any differences. Make the books, records and accounts of Borrower available for inspection by HUD or its authorized representatives, after reasonable prior notice, during normal business hours, at the Project or other mutually agreeable location or, at HUD’s request, shall provide legible copies of such documents to HUD or its authorized representatives within a reasonable time after HUD or its authorized representative makes a request for such documents. Include as a requirement in any operating or management contract that the books, records, and accounts of any agent of Borrower, as they pertain to the operations of the Project, shall be kept in accordance with the requirements of this Section 19 and be available for examination by HUD or its authorized representatives after reasonable prior notice during customary business hours at the Project or other mutually agreeable location or, at HUD’s request, the Management Agent shall provide legible copies of such documents to HUD or its authorized representatives within a reasonable time after HUD or its authorized representative makes the request.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Development Records Each Party shall maintain complete, current and accurate records of all Development activities conducted by it hereunder, and all data and other information resulting from such activities. Such records shall fully and properly reflect all work done and results achieved in the performance of the Development activities in good scientific manner appropriate for regulatory and patent purposes. Each Party shall document all non-clinical studies and Clinical Trials in formal written study reports according to Applicable Laws and national and international guidelines (e.g., ICH, cGCP, cGLP, and cGMP).

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • CORRECTION OF WORK 13.2.1 The Contractor shall be responsible for correcting all Work which the Architect has found to be defective or which fails to conform to the Contract Documents whether observed be- fore or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including compensation for the Architect's and the State’s additional services made necessary thereby. 13.2.2 If, within one year after the Date of Substantial Completion of the Work or designated portion thereof or within one year after acceptance by the State of designated equipment or within such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the State to do so unless the State has previously given the Contractor a written acceptance of such condition. This obligation shall survive termination of the Contract. The State shall give such notice promptly after discovery of the condition. 13.2.3 The Contractor shall remove from the site all portions of the Work which are defective or non-conforming and which have not been corrected under Subparagraphs 4.5.1, 13.2.1 and 13.2.4 If the Contractor fails to correct defective or nonconforming Work as provided in Subparagraphs 4.5.1, 13.2.1 and 13.2.2, the State may correct it in accordance with Paragraph 13.2.5 If the Contractor does not proceed with the correction of such defective or non- conforming Work within a reasonable time fixed by written notice from the Architect, the State may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does not pay the cost of such removal and storage within ten days thereafter, the State may upon ten additional days written notice sell such Work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have been borne by the Contractor, including compensation for the Architect's and the State’s additional services and expenses made necessary thereby. If such proceeds of sale do not cover all costs which the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order shall be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the State. 13.2.6 The Contractor shall bear the cost of making good all work of the State or separate contractors destroyed or damaged by such correction or removal. 13.2.7 Nothing contained in this Paragraph 13.2 shall be construed to establish a period of limitation with respect to any other obligation which the Contractor might have under the

  • Access to Premises and Records Between the date of this Agreement ------------------------------ and the Closing Date, Seller will give Buyer and its counsel, accountants and other representatives full access during normal business hours upon reasonable notice to all the premises and books and records of the Business and to all the Assets and to the System personnel and will furnish to Buyer and such representatives all such documents, financial information, and other information regarding the Business and the Assets as Buyer from time to time reasonably may request; provided that no such investigation will affect or limit the scope of any of Seller's representations, warranties, covenants and indemnities in this Agreement or any Transaction Document or limit liability for any breach of any of the foregoing.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Access to Work Locations Reasonable access to employee work locations shall be granted officers of the Association and their officially designated representatives for the purpose of processing grievances or contacting members of the Association concerning business within the scope of representation. Such officers or representatives shall not enter any work location without the consent of the City Manager. Access shall be restricted so as not to interfere with the normal operations of the department or with established safety or security requirements. Solicitation of membership and activities concerned with the internal management of the Association, such as collecting dues, holding membership meetings, campaigning for office, conducting elections and distributing literature, shall not be conducted during working hours.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!