Installation and Deployment Sample Clauses

Installation and Deployment. Owner shall install the System within the Structure in the necessary location(s) and use the equipment set forth in Exhibit B. Unless waived in writing by CRESA, and such waiver is approved by the Fire Official, Owner shall have the System designed, installed, and tested by personnel with the following minimum qualifications. i. A valid FCC issued general radio operators license (GROL) or professional engineer license (PE) ii. Certification of in-building system training issued by a nationally recognized organization, school or a certification issued by the manufacturer of the equipment being installed Owner shall deploy the System in accordance with applicable FCC regulations and the Fire Code.
AutoNDA by SimpleDocs
Installation and Deployment. The system shall be appropriately configured according the security principles before the operation phase, establishing, at least: i. Hardening baseline for each hardware and software (OS, DB, middleware, etc) component present according to industry and government best practices ii. Environment configuration: in order to ensure that the software required parameters/libraries/models are correctly configured iii. Release management: a process of ensure that all changes are made in a formal and approved manner
Installation and Deployment 

Related to Installation and Deployment

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!