 Installation and Operation Contract Boundary Sample Clauses

 Installation and Operation Contract Boundary. The customer is responsible for all piping and other components necessary to connect the hydronic heating and DHW systems to the ETS at the agreed demarcation point for the service boundary on the secondary side of the heat exchangers. This demarcation point will be clearly marked on the DEU engineering drawings for the ETS. A typical example is shown in Figure 2 on page 10. DE-Ready buildings are responsible for all equipment within their building, including boilers for space heating and DHW; there is no DE demarcation point. Delineation from the DEU will be determined at time of connection to DE. DE-Ready buildings must provide full-size tees and isolation valves for future connection of the hydronic heating and DHW system to an ETS.  Preparation of Building for DE Service All customers (including both DE-Connected and DE-Ready buildings) will provide suitable space for the installation of the ETS, including space for service lines and interconnecting piping, in a mechanical room in an agreed-upon location. The ETS should generally be located at an exterior wall facing the street, in the first underground level (parkade). The ETS room shall be ventilated and maintained at a temperature between 10oC and 35ºC. A floor drain connected to the sanitary sewer system should be provided in the ETS room, as well as a domestic water source. A dedicated 15A 120V electrical service, with a lockable breaker, is required to power the ETS control panel. Allowance should be made in the Building Automation System (BAS), if applicable, to provide heating pump on/off status to the ETS control panel. If a BAS is not planned for the building then the DEU will directly monitor the heating pump on/off status via a hardwire connection. As well, one 20mm electrical metallic tubing (EMT) conduit from the ETS room to a north facing exterior wall is required for the outdoor air temperature sensor wiring. The footprint of an ETS depends on a number of factors, including customer load, number of heat exchangers, configuration of the hydronic heating and DHW systems, and specific restrictions within the customer building. Generally, a typical ETS requires between 4 and 10 m2 of floor space, with a minimum ceiling height of 2.7 m. The customer should provide a concrete housekeeping pad of the required size, on which the ETS heat exchangers are installed. The customer is responsible for the DE service line building or foundation penetration, which meets the requirements of the DEU (siz...
AutoNDA by SimpleDocs

Related to  Installation and Operation Contract Boundary

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • BUILDING SERVICES CONTRACTS In compliance with Article 9, Section 230 of the New York State Labor Law:

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.