Installation, Testing and Commissioning. 3.7.1 The Contractor warrants that it shall fully acquaint itself with the Institution’s structural, electrical and other requirements shall install the Equipment without any additional charge, as directed by the Institution. The installation, testing and commissioning of the Equipment shall be conducted in accordance with the Requirements Specifications and where necessary, in the presence and to the satisfaction of, Personnel designated by and representing the Institution. Where applicable, the Contractor shall conduct all quality control testing necessary to ensure the level of quality in conformance in all respects to the Requirements Specifications.
AutoNDA by SimpleDocs
Installation, Testing and Commissioning a) The Interface Detectors shall be delivered to sites by the supplier.
Installation, Testing and Commissioning. 3.7.1 7KH &RQWUDFWRU ZDUUDQWV WKDW LW VKDOO IXOO\ DFTXD and other requirements shall install the Equipment without any additional charge, as directed by the Institution. The installation, testing and commissioning of the Equipment shall be conducted in accordance with the Requirements Specifications and where necessary, in the presence and to the satisfaction of, Personnel designated by and representing the Institution. Where applicable, the Contractor shall conduct all quality control testing necessary to ensure the level of quality in conformance in all respects to the Requirements Specifications.
Installation, Testing and Commissioning. 1.00 PART 1
Installation, Testing and Commissioning. 5.14.1) Successful Bidder is solely responsible for Installation, Commissioning & testing at MCF-Bhopal.
Installation, Testing and Commissioning. The scope of installation, testing and commissioning for the plant facilities shall include, but not limited, to the following. Installation of PV Modules on Module Mounting Structures and interconnection of PV 50 MW (AC) Solar PV Power Plants at Tamil Nadu Tender No. SECI/C&P/TD/2020/TN/50 SOW Page 8 of 15 Signature of Bidder Modules. Laying of solar cables through HDPE conduits underground / along cable trays from PV Modules to SMU / PCU along with termination at both the ends. Installation, Testing and Commissioning of String Monitoring Units. Laying of DC cables underground / along cable trays from SMU to PCU along with termination at both the ends (in case of central inverter configuration). Installation, Testing and Commissioning of Power Conditioning Units. Installation, Testing and Commissioning of inverter-duty transformers. Installation, Testing and Commissioning of switchgear panels. Laying of 1.1 kV AC cables along underground / cable trays from PCU to inverter-duty transformer along with termination at both the ends. Laying of HT AC cables underground / along cable trays from inverter-duty transformer to switchgear panel along with termination at both the ends. Laying of HT AC cables underground / along cable trays from switchgear panel at Local Control Room / field to switchgear panel at Main Control Room along with termination at both the ends. Installation, Testing and Commissioning of ABT meters with all necessary metering rated CTs and PTs at Main Control Room as per CEA Metering Regulation 2006 as amended time to time and state metering code. Installation, Testing and Commissioning of auxiliary power supply system consisting of auxiliary transformers, AC distribution boards, AC LT cables and related accessories. Installation, Testing and Commissioning of suitable communication system for interfacing SMU, PCU, Transformer, Switchgear panel, ABT meter, UPS, Fire alarm panel, WMS and other plant equipment with SCADA. Installation, Testing and Commissioning of data acquisition system from SPV plant to SLDC along with communication system as required by SLDC. Installation, Testing and Commissioning of Uninterrupted Power Supply (UPS) with battery bank. Earthing of PV Modules, Module Mounting Structures, SMU, PCU, switchgear panels and all other electrical equipment. Installation of lightning protection system for entire plant facilities. Installation of indoor & outdoor illumination system including all required accessories and laying of powe...

Related to Installation, Testing and Commissioning

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.