Maximum Vehicle Turnaround Guarantee Sample Clauses

Maximum Vehicle Turnaround Guarantee. Contractor shall maintain a maximum average vehicle turnaround time of twenty (20) minutes for Collector delivery of Solid Waste and Other Materials to the Approved Solid Waste Processing DocuSign Envelope ID: 6FD11721-50DF-48AF-BED6-5C2CC660E873
AutoNDA by SimpleDocs
Maximum Vehicle Turnaround Guarantee. Contractor shall manage the scale house and vehicle receiving process at the Approved Processing Facilities to ensure that Franchised Collector’s vehicles Delivering Acceptable Materials are not unnecessarily delayed in unloading. Contractor guarantees (the "Maximum Vehicle Turnaround Guarantee") that each of the Franchised Collector’s vehicles Delivering material is able to conduct its Delivery of such materials within the Maximum Vehicle Turnaround Time specified in Article 1, absent vehicle breakdown or driver negligence. As of the Commencement Date of the Agreement, the arrival time shall be the time recorded for the vehicle at the motor vehicle scale when the inbound weight of the vehicle is recorded. An exit time shall not be recorded because the vehicle’s tare weight will be recorded in the scale system allowing the vehicle to by-pass the scale when exiting the Facility. The Contractor will operate a video camera system that will capture each vehicles’ license plate at the time the vehicle arrives at the site and exits the site providing a record of the date and time for each Load. Upon City request, Contractor shall provide the City reports or access to electronic scale house system records that provide the City information to determine vehicle turnaround times based on documented entry time at the entry scale house and documented facility exit time. The City may approve the Franchised Collector’s use GPS (global positioning system) records for Collection vehicles to calculate turnaround time, or the City may conduct on-site surveys of performance to verify compliance with the Maximum Vehicle Turnaround Time. Contractor shall provide the City and Franchised Collector with the opportunity to review the video recordings of the inbound and outbound vehicles for the day in question and to calculate the average vehicle turnaround time. If the average weekly vehicle turnaround time for the week in question is in excess of the Maximum Vehicle Turnaround Time, the Contractor shall pay the Franchised Collector five dollars ($5.00) per Load for each minute in excess of the twenty (20) minute average guaranteed, where the number of Loads shall be equal to the number of Loads received during the week in which the Maximum Vehicle Turnaround Time was exceeded. For this purpose of this Section, a week shall include the five (5) most recently completed Days of Facility operations. If Contractor fails to meet the Maximum Vehicle Turnaround Time, the City may assess...

Related to Maximum Vehicle Turnaround Guarantee

  • SECTION 907 - VEHICLE CONFIGURATIONS AND RESTRICTIONS The SADT on the section shall be understood to be 1,500.

  • Supplemental JBoss Software Conditions Software Access and Software Maintenance for Supplemental JBoss Software is intended and available for Development Purposes only and for up to 25 users for each 16 Core Band Subscription of Red Hat JBoss Middleware Software that you purchased. If you deploy or use the Supplemental JBoss Software for Production Purposes or for more than 25 users, you agree to purchase the appropriate Software Subscriptions for each Unit that you deploy or use. Red Hat’s Open Source Assurance Program applies only to the Red Hat JBoss Middleware Software Subscription that you purchased (such as Red Hat JBoss Enterprise Application Platform in the example above) and does not apply to Supplemental JBoss Software. JBoss xPaaS Subscriptions (defined below) are not considered Supplemental JBoss Software. Each installation and use of JBoss xPaaS Subscriptions Software for either Development Purposes or Production Purposes is a Unit and requires a paid Software Subscription.

  • Lodgement of SWS wage assessment agreement C.6.1 All SWS wage assessment agreements under the conditions of this schedule, including the appropriate percentage of the relevant minimum wage to be paid to the employee, must be lodged by the employer with Fair Work Australia.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • SPECIAL CONTRACT REQUIREMENTS The Special Contract Requirements are provisions that relate directly to the performance of this contract.

  • OGS Centralized Contract Modifications OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

  • OGS Centralized Contract Terms and Conditions have been renumbered as depicted in the following chart: Current Amended Section Title 4.25 4.26 Severability 4.26 4.27 Entire Agreement

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • END USER AGREEMENTS (“EUA H-GAC acknowledges that the END USER may choose to enter into an End User Agreement (“EUA) with the Contractor through this Agreement, and that the term of the EUA may exceed the term of the current H-GAC Agreement. H-GAC’s acknowledgement is not an endorsement or approval of the End User Agreement’s terms and conditions. Contractor agrees not to offer, agree to or accept from the END USER, any terms or conditions that conflict with those in Contractor’s Agreement with H-GAC. Contractor affirms that termination of its Agreement with H-GAC for any reason shall not result in the termination of any underlying EUA, which shall in each instance, continue pursuant to the EUA’s stated terms and duration. Pursuant to the terms of this Agreement, termination of this Agreement will disallow the Contractor from entering into any new EUA with END USERS. Applicable H-GAC order processing charges will be due and payable to H-GAC

Time is Money Join Law Insider Premium to draft better contracts faster.