Operation mode Sample Clauses

Operation mode. All the tests are conducted at a temperature of between 20 °C and 30 °C. The test method includes the four following steps: (a) Initial charge of the battery; (b) Application twice of the cycle made of four elementary urban cycles and an extra-urban cycle; (c) Charging the battery; (d) Calculation of the electric energy consumption. Between the steps, if the vehicle shall move, it is pushed to the following test area (without regenerative recharging). 2.4.1. Initial charge of the battery
AutoNDA by SimpleDocs
Operation mode. The Power Station shall be utilized as a despatchable peaking and base load plant and be expected to be able to operate seven (7) days per week, 24 hours per day.
Operation mode. For all service transactions under the New Framework Agreement, parties to the transactions will enter into individual agreements in accordance with the scope and principles specified in the New Framework Agreement. Such individual agreements shall not violate the agreed provisions under the New Framework Agreement. The parties shall ensure and procure their respective subsidiaries to enter into individual agreements in accordance with the principles and provisions of the New Framework Agreement and the service plans agreed by both parties. Kunming Dianchi Investment is committed to use its best endeavor to procure its associates other than its subsidiaries to enter into individual agreements in accordance with the principles and provisions of the New Framework Agreement and the service plans agreed by both parties. During the process of implementing the New Framework Agreement, if necessary and as agreed by both parties of the agreement, the individual agreements may be adjusted.
Operation mode. 1. Project setup: When Party B submits the application for project setup, Party A shall be responsible for organizing and coordinating the relevant departments in Dongyuan County, Heyuan City to handle the matters such as the project site selection, project setup and land index approval;
Operation mode. Term of agreement has two parts, probation and regular part. The first 3 months is the probation term; Right after party A starts the first class, the 1 year regular term starts.
Operation mode. 11.1 Orders may be placed via the Website around the clock (with the exception of interruptions to the Website due to maintenance work).
Operation mode. The Power Station shall be utilized as a peaking plant and be expected to operate five (5) days per week - Monday to Friday - and shall remain on standby over the weekend and during the ten (10) public holidays per year, except during scheduled maintenance. The Power Station however, is expected to operate at any other time as may be called upon by NAPOCOR during Emergency and/or abnormal system conditions with adequate notice having been given by NAPOCOR and would be manned 24 hours a day.
AutoNDA by SimpleDocs
Operation mode. The WTE plants shall be utilized as a base load plant and be expected to be able to operate seven (7) days per week, 24 hours per day, 350 days per year.

Related to Operation mode

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic County PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than twenty-four (24) hours.

  • Disaster Recovery and Business Continuity The Parties shall comply with the provisions of Schedule 5 (Disaster Recovery and Business Continuity).

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • CONTINUITY OF OPERATION Section 1: No Strikes, Work Stoppages or Lockouts

  • System Operation The Parties shall adhere to any applicable operational requirements of PJM necessary to protect the integrity of the transmission system within the PJM Control Area and the transmission systems of interconnected control areas, and shall satisfy any and all PJM, RFC and NERC criteria, when applicable. The DS Supplier shall also adhere to any applicable operational requirements of the Company necessary to protect the integrity of the Company’s local distribution system.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopted for the employees of the Employer; 5.2 The Employee accepts that the purpose of the performance management system will be to provide a comprehensive system with specific performance standards to assist the employees and service providers to perform to the standards required; 5.3 The Employer must consult the Employee about the specific performance standards and targets that will be included in the performance management system applicable to the Employee; 5.4 The Employee undertakes to actively focus on the promotion and implementation of the key performance indicators (including special projects relevant to the employee’s responsibilities) within the local government framework; 5.5 The criteria upon which the performance of the Employee shall be assessed shall consist of two components, Operational Performance and Competencies both of which shall be contained in the Performance Agreement; 5.6 The Employee’s assessment will be based on his performance in terms of the outputs/outcomes (performance indicators) identified as per attached Performance Plan, which are linked to the KPAs, and will constitute 80% of the overall assessment result as per the weightings agreed to between the Employer and Employee; 5.7 The Competencies will make up the other 20% of the Employee’s assessment score. The Competencies are spilt into two groups, leading competencies (indicated in blue on the graph below) that drive strategic intent and direction and core competencies (indicated in green on the graph below), which drive the execution of the leading competencies. Strategic direc on and leadership People management Program and project management Financial management Change leadership Governance leadersip Moral competence Planning and organising Analysis and innova on Knowledge and informa on management Communica on Results and quality focus

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

  • Performance Testing (a) All performance tests of the Project, including any Initial Performance Test required in Section 2 of Appendix VIII, will be performed in accordance with the test procedures set forth in Appendix VIII (“Performance Test”), including additional procedures and protocols related to Performance Testing as mutually agreed between Buyer and Seller (“Test Procedures”). Seller shall bear all costs and receive all revenues, if applicable, associated with all Performance Tests. (b) After the Initial Delivery Date and during the Delivery Term, Buyer will have the right to conduct a Performance Test (“Buyer Performance Test”) no more than once a calendar year to demonstrate whether the Project is capable of delivering the Distribution Services at the Contract Capacity. Within 30 calendar days following a Buyer Performance Test, Seller will have the right to retest the Project with a Performance Test (“Seller Retest”). For the avoidance of doubt, the results of any Seller Retest will supersede the results of the preceding Buyer Performance Test. (i) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is capable of delivering Distribution Services at or above ninety-nine percent (99%) of the Initial Contract Capacity, the Contract Capacity will remain the Initial Contract Capacity; (ii) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is capable of delivering Distribution Services at more than or equal to eighty-five (85%) of the Initial Contract Capacity, but less than ninety-nine percent (99%) of the Initial Contract Capacity (“Testing Band”), the Contract Capacity will be automatically adjusted (upwards or downwards) to the capacity commensurate with the amount of Distribution Services the Project delivered during the Performance Test within the Testing Band. (iii) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is not capable of delivering Distribution Services of at least eighty-five percent (85%) of the Initial Contract Capacity, an Event of Default shall occur in accordance with Section 7.1(a)(viii).