Packing and Forwarding. The Contractor will be held responsible or the stores being sufficiently and properly packed for transport by rail, road; and or air to withstand transit hazards and ensure safe arrival at the destination. The packing and making of packages shall be done by end at the expense of the Contractor.
Packing and Forwarding a) IMPORTED SUPPLIES
1) The Contractor wherever applicable, shall, after proper painting, pack and crate all materials for shipment in a manner suitable for export to a tropical, humid climate in accordance with internationally accepted export practices and in such a manner so as to protect them from damage and deterioration in transit by road, rail and/or sea and during storage at Contractor’s Own Warehouse and at the site, as the case may be, till the time of erection. Without prejudice to any other liabilities or obligations of the Contractor, the Contractor shall be responsible for all damage(s) to the materials due to improper packing.
2) The Contractor shall notify the Employer/ Employer’s Engineer of the date of each shipment from the port of embarkation as well as of the expected date of arrival of such shipment at the designated port of arrival only for the Employer/ Employer’s Engineer’s information.
3) The Contractor’s notification shall give complete shipping information concerning the weight, size and content of each package and such other information as the Employer may require. The packing material used should be duly certified by a Phytosanitary Certificate issued as per international norms.
Packing and Forwarding. The galvanized steel stay wire shall be supplied in coils. Each coil of GSS wire shall have single continuous length and shall be suitably bound and fastened compactly and shall weigh 40 kgs to 60 kgs. The coils will be suitably protected by wrapping round by xxxxxxx cloth/polythene cover to avoid damage in transit and corrosion. Each coil shall be marked as mentioned above.
Packing and Forwarding. Inclusive @ Rs.2.00 in the basic price.
Packing and Forwarding. NIL i.e. to be borne by the firm.
Packing and Forwarding. Offered Goods will be dispatched suitably packed as per Seller's factory standard. The fitting/assembling of loose parts/accessories at site is not in Seller's scope.
Packing and Forwarding. The Galvanised M.S.Rod type earthing sets shall be supplied in bundles (containing all items) and shall be suitably bound and fastened compactly and shall have a maximum weight of 400 Kgs. The bundles will be suitably protected by wrapping round by xxxxxxx cloth/polythene cover to avoid damage in transit and corrosion
Packing and Forwarding. The finished items complete in all respect dully inspected and cleared for dispatch, shall have to be delivered in Nigam's stores located anywhere in Ajmer Discom by Road. Unloading of material at store(s) is Suppliers responsibility.
Packing and Forwarding. The packing of material shall be made in two bags one HDP bag (inner) and one gunny bag (outer) or in double gunny bag, containing 50 Kg weight of Bolts & Nuts(Net wt.). The packing should capable to bear transportation hazards. The packing shall be such as to protect the material from the atmospheric effect like rains, humiity etc. The packing shall bear the marking as under:-
a) Certification regarding ISI
b) Particulars of material(s)
c) Quantity
d) Manufacturer’s identification mark
e) Complete dispatch details like name of the consignee and destination etc.
Packing and Forwarding a. All suppliers, wrappers, and containers must bear markings and labels required by applicable laws and regulations for the protection and safety of persons and property and Seller warrants that price includes all charges for packaging, crating, and transportation to the agreed point of delivery. Purchaser shall have the right to instruct Seller of any special packaging requirements and Seller shall strictly comply with these instructions. Purchaser shall not be required to accept shipments of the Work that do not comply with its packing instructions.
b. Packing materials that remain the property of the Seller shall be returned at Seller’s sole risk and expense.