Criteria for Acceptance. The City shall favorably consider accepting Donations if (in the sole discretion of the City) the intended bequeath satisfies one or more of the following criterion:
(1) The Donation furthers a Project that has been approved by the City Council in the form of a long-term master or comprehensive plan (of some sort).
(2) The Donation furthers a Project that is necessitated by a documented need to comply with county, state or federal regulations.
(3) There is broad political or public support for the Donation and the Project.
(4) The Project provides for the facilitation of cooperation between multiple civic groups, charitable organizations and/or political subdivisions.
(5) The City has adequate human resources to maintain and operate the Project.
(6) The Project will not pose a realistic threat to the public health, safety or welfare, or create an unreasonable source of legal liability for the City.
(7) The Donation will not pose an undue, continuing financial burden on the City, a result of which is to create a public obligation that outweighs the public benefits.
Criteria for Acceptance. 9.1 Visual Examination, Verification of Dimension, weight and marking . As per specification/ ISS
Criteria for Acceptance. All units of a selected sample shall pass the tests. In case a sample fails (results fall outside the eligibility matrix) in any of the tests, a further sample consisting of double the number of units should be tested for all the tests. All units of this second sample shall pass in the tests.
Criteria for Acceptance. The inspected PCC poles should be strictly in accordance to the GTP of the specification otherwise the material shall be treated as rejected and shall not be accepted. However, the poles with some minor deviations may be accepted with deductions as per rates prescribed and in force. Higher dimensions of poles shall not attract any penalty / deduction, as it will not be considered as deviation. X.Xx. Particulars Requirement as per GTP 1 MANUFACTURER’S NAME 2 OFFICE ADDRESS 3 WORKS ADDRESS 4 STANDARDS TO WHICH THE MATERIAL SHALL CONFORM As per specification 5 OVER ALL LENGTH 9 meter 6 PLANTING DEPTH 1.5meter 7 TOP DIMENSIONSIN MM 145 x114 mm 8 BOTTOM DIMENSIONS IN MM 300 x114 mm 9 APPROXIMATE WEIGHT 545 Kg. 10 WORKING LOAD 200 Kg.
Criteria for Acceptance. The inspected PCC poles should be strictly in accordance to the GTP of the specification otherwise the material shall be treated as rejected and shall not be accepted. However, the poles with some minor deviations may be accepted with deductions as per rates prescribed and in force. Higher dimensions of poles shall not attract any penalty / deduction, as it will not be considered as deviation. X.Xx. Particulars Requirement as per GTP 1 MANUFACTURER’S NAME 2 OFFICE ADDRESS 3 WORKS ADDRESS 4 STANDARDS TO WHICH THE MATERIAL SHALL CONFORM As per specification 6 PLANTING DEPTH 1.5 meter 7 TOP DIMENSIONS IN MM 145 x 90 mm 8 BOTTOM DIMENSIONS IN MM 290 x 90 mm 9 APPROXIMATE WEIGHT 380 Kg. 10 WORKING LOAD 200 Kg.
Criteria for Acceptance. In case of failure of any of sample (s) in any of the above tests, the material contained in the lot / sub-lot received in store to which the samples belong, shall be rejected. The rejected material shall have to be replaced by the supplier free of cost.
Criteria for Acceptance. The inspected material should be strictly in accordance to the GTP of the specification otherwise the material shall be treated as rejected and shall not be accepted.
Criteria for Acceptance. Visual Examination, verification of dimensions, weight and markingas per Specification/ GTP/ ISS/approved drawing.
Criteria for Acceptance. The material received in the stores shall finally be accepted provided the selected samples passes the test in CTL. The sample(s) shall be subject to verification of dimension as per specification/GTP and will be accepted as per tolerances specified in specification/ relevant IS: The material will be accepted as per GTP/IS. The Executive Engineer (CTL) shall send copies of test reports to the purchaser, consignees and the supplier.
Criteria for Acceptance. (A) Verification of dimension.
(a) for M.S.Rod:- 2% of the cost of material
(b) Other parts :- 1% of the cost of material