Pre-Delivery Requirements Sample Clauses

Pre-Delivery Requirements. LESSEE will do each of the following prior to the Scheduled Delivery Date of the Aircraft within the time frames set forth below:
AutoNDA by SimpleDocs
Pre-Delivery Requirements. Telenor expects the Customer to fulfil the following requirements regarding pre-installation preparations: • Space for required equipment Clearance of necessary space for Telenor equipment in a room no smaller than 1x1x1m. The location shall have ambient air temperature and relative humidity (23°C ± 5°C, 10-80% Relative humidity. Non-condensing temperature ranges). • .Access to the installation space and equipment should be limited to authorised personnel only. If radio access with antenna is used, customer must accept and grant authorisation for installation of equipment before installation can start. • Electricity and separate circuits etc. There must be 230 V (minimum 6 A fuses) sockets with earth in the immediate vicinity of the equipment. Failure tolerant power supply is recommended. Equipment is not delivered with UPS. • Electrical noise and spikes. Unusually strong electrical disturbances are not allowed in the immediate vicinity. The responsibility for avoiding damage to equipment due to voltage spikes such as from lightning is the Customer’s. • Distribution network and cabling. Unless specifically agreed upon all connections between Telenor deployed equipment and lines to other units may be executed without provision of fixed cabling. • Other suppliers/contractors. If implementation of the delivery requires assistance from other suppliers, for instance those who have already supplied equipment to the Customer, the Customer must ensure that they are available to Telenor without delay. The customer is responsible for the coordination with other related suppliers, if necessary for the delivery. • Availability at installation time. The contact person shall be available (on mobile or similar) to Telenor at the agreed installation time and place. The contact person shall have access to the premises where the installation will be made and have keys and/or other device to enable access to the premises and installation space. • Knowledge and information about delivery. The contact person at the installation place shall have information and knowledge enabling Telenor to carry out the task in a manner satisfactory to both parties.
Pre-Delivery Requirements. Telenor expects the customer to meet the following requirements for pre-installation preparations:
Pre-Delivery Requirements. 21 7.2 LESSOR's Pre-Delivery Requirements.....................21 7.3

Related to Pre-Delivery Requirements

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.

Time is Money Join Law Insider Premium to draft better contracts faster.