PRELIMINARY AND GENERAL. PRELIMINARIES 1.1 Provide for Preliminaries and all costs of a general nature that may affect the cost of works in order to comply with the contractual conditions and which are not otherwise provided for in the compilation of this quotation, including taking delivery, storing and safeguarding of materials, site establishment, setting out, welfare of workplace, clearing and cleaning, supervision, provision of all tools, equipment, labour force protective clothing, scafolding, formwork, water supplies, electric power and communications and other temporary materials, provision of nails, screws, ""polyfilla" etc. Sum 1 R - HEALTH & SAFETY 1.2 Compilation of Health and Safety Plan, Compilation of Health and Safety File, Notice of Construction Work – Department of Labour Sum 1 R 1.3 Compliance with all Construction Regulations (OHS Act); Compliance with all requirements of the Environmental Regulations; Sum 1 R -
PRELIMINARY AND GENERAL. NOTES TO PRELIMINARIES
PRELIMINARY AND GENERAL. 1 Preparing to Execute The Works F:............................. V:............................ T:........................... Item 2 Setting Out F:............................. V:............................ T:............................ Item 3 Management of Contract F:............................. V: T .......................... Item 4 Programming of Works F:............................. V:............................ T:............................ Item 5 Plant, Equipment, Sheds and Offices F:.......................... V:. T: ......................... Item Section No. 3 WORK PACKAGES TO BE EXECUTED BY XXXXX Bill No. 2 6 Tele Communication Equipment F:............................. V:............................ T:............................ Item
PRELIMINARY AND GENERAL. 1 Preparing to Execute The Works F:............................. V:............................ T:........................... Item 2 Setting Out F:............................. V:............................ T:............................ Item 3 Management of Contract F:............................. V: T .......................... Item Section No. 3 WORK PACKAGES TO BE EXECUTED BY XXXXX Bill No. 5 4 Programming of Works F:............................. V:............................ T:............................ Item 5 Plant, Equipment, Sheds and Offices F:.......................... V:. T: ......................... Item 6 Tele Communication Equipment F:............................. V:............................ T:............................ Item Prepare and apply one undercoat and paint with two coats premium quality pure acrylic PVA on: 7 Exterior walls. m² 2 559 8 On ceilings and beams m² 65 9 Interior walls. m² 3 966 Prepare and apply one coat wood primer, one undercoat and two coats superior quality eggshell enamel on: 10 General surfaces of doors. m² 485 Touch up manufacturers priming coat, apply one coat undercoat and finish with two coats superior quality enamel on: 11 General surfaces of structural steelwork m² 400 12 Pressed steel door frame. m² 196 13 Exterior gates, grilles, burglar screens, balustrades, etc. (both sides measured over the full flat area). m² 674 Section No. 3 WORK PACKAGES TO BE EXECUTED BY XXXXX Bill No. 5 Section No. 3 Bill No. 5 PAINTWORK COLLECTION PAGE Section No. 3 WORK PACKAGES TO BE EXECUTED BY XXXXX Bill No. 5 R Amount Rand
PRELIMINARY AND GENERAL. 1.1 Overheads for project; This includes paperwork, office overheads, telephone calls etc) % of labour cost %
1.2 Safety allowance for project (PPE and site safety including job specific risk assessment) % of labour cost %
1.3 Site establishment Sum 1
2.1 Pole top inspection ea 166 2.2 Crossarm conversion (Wishbone to Birdfriendly, incl bonding) DDT1870&DDT0310 ea 45
PRELIMINARY AND GENERAL. Separable Portion D
4.1.1 Insurances, bonds, fees, permits, etc LS 1
4.1.2 Setting out LS 1
4.1.3 Establishment and disestablishment LS 1
4.1.4 Provision of all other items required by the Preliminary and General clauses of the Contract Documents or otherwise needed to complete the project in accordance with the Contract Documents LS 1
4.1.5 Community and property owner liaison LS 1 Sub-Total Preliminary and General $
PRELIMINARY AND GENERAL. (Applicable to the whole of the Works) Note: A rate or price shall be entered in the amount col- umn for each item. Items which are included should have the word "included" written in the appropriate column All other items shall be deemed to have been in- cluded elsewhere in the unit rates unless specifically entered by the tenderer in the space provided. FIXED CHARGE AND VALUE RELATED ITEMS 1 Contractual requirements. SUM 1 SUM Establishment of Facilities on the Site Facilities for Contractor 4 Ablution and latrine facilities. SUM 1 SUM
PRELIMINARY AND GENERAL. 1.1 Overheads for project; This includes paperwork, office overheads, telephone calls etc) % of labour cost %
PRELIMINARY AND GENERAL. 1.1 Overheads for project; This includes paperwork, office overheads, telephone calls etc) % of labour cost %
1.2 Safety allowance for project (PPE and site safety including job specific risk assessment) % of labour cost %
1.3 Site establishment Sum 1
2.1 Pole top inspection ea 410
2.2 Pole replacement staggered to birdfriendly (complete structure including dressing,hardware, bonding and labelling)D-DT - 1710 to D-DT1870 ea 98
2.3 Pole replacement Vertical to birdfriendly (complete structure including dressing,hardware, bonding and labelling)D-DT - 1711 to D-DT1870 ea 52
2.4 Pole replacement delta to birdfriendly (complete structure including dressing,hardware, bonding and labelling)D-DT - 1730 to D-DT1870 ea 4 2.5 Hole excavation (Auger) ea 154
3.1 LDV & personnel transportation per km
PRELIMINARY AND GENERAL. 1.1 Site Establishment 1.2 Other Overheads(Detailed costs break down) Site De-establishment