Preliminary Drainage Report Sample Clauses

Preliminary Drainage Report. (s) 4 2 1 At the same time as Initial Design Submittal for the associated drainage improvements DR 445.3.3
AutoNDA by SimpleDocs
Preliminary Drainage Report. Consultant shall: • Prepare a drainage report that quantifies storm runoff for both the PROJECT 10- and 100-year storm events. • Access, quantify, and address roadway storm water surface elevation, velocity, and its adherence to local and regional drainage standards with the narrative of such findings memorialized in the drainage study. • Provide recommendation(s) on viable treatment(s) to address drainage related issues and identify overall compliance with the Hydrologic Criteria and Drainage Design Manual. • Provide recommendation(s) on the need for possible upgrade in the drainage system for future CIP deliverable.
Preliminary Drainage Report. 19 CONSULTANT will conduct a preliminary drainage investigation to determine the existing drainage patterns 20 and storm drain facilities in the project area, including existing channels/ditches, pipe locations, sizes, local 21 rainfall intensities, and flows. This information will be obtained through a combination of field reconnaissance, 22 Caltrans/County records and prior reports prepared for the project. After reviewing the existing drainage 23 conditions, on-site hydrologic analyses will be conducted in accordance with Caltrans and County standards 24 for the post-project condition, emphasizing the primary objective of maintaining existing flow patterns and runoff 25 amounts. 26 The on-site analyses will include identifying where new facilities are needed and where existing facilities can 27 be reused. For new facilities and existing facilities that will be impacted by the project, CONSULTANT will 28 develop drainage boundaries for the areas within the project limits, develop future flows for each facility based 29 on Rational Method calculations, and laying out the new/retrofitted storm drain facilities. If future land use is to
Preliminary Drainage Report. 6.5 Utility Coordination and ROW Data Sheet
Preliminary Drainage Report. The Consultant will conduct a Preliminary Drainage Report to determine existing hydrology and drainage systems within the project area. The impact of the project improvements will be documented and recommendations for conceptual drainage improvements will be included in a technical report. The planning level cost estimate for drainage improvements will also be included in the report. This scope of services includes only a planning level study of any modifications and does not include design level calculations.

Related to Preliminary Drainage Report

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • Preliminary Matters The Chair of the Hearing Panel will ask each party if it has any objections to the constitution of the Hearing Panel. Responses will be noted and recorded. If an objection is raised, the party raising the objection will be asked to immediately outline the objection. The Hearing Panel will then determine the merits of the objection.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.