Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.
Moving a. You must give us at least forty-five (45) days’ advance notice before you move and tell us your new address. If the new location is within a territory we serve, we will amend this Contract to apply to your new location. Any interruption in supply of Energy or services caused by your failure to give us forty-five (45) days’ notice and any additional costs we incur in serving the new location will be your responsibility. b. If you move out of Alberta or to a territory we do not serve, then on the date of your move, this Contract will end without liability to either of us. c. If we cannot supply electricity to your new location for any other reason (including that a third party supplies you with electricity), this Contract, as it applies to electricity will end and we may charge you the Early Exit Fee.
Load Shedding The systematic reduction of system demand by temporarily decreasing Load in response to a transmission system or area Capacity shortage, system instability, or voltage control considerations under the ISO OATT. Local Furnishing Bonds. Tax-exempt bonds issued by a Transmission Owner under an agreement between the Transmission Owner and the New York State Energy Research and Development Authority (“NYSERDA”), or its successor, or by a Transmission Owner itself, and pursuant to Section 142(f) of the Internal Revenue Code, 26 U.S.C. § 142(f). Locality. A single LBMP Load Zone or set of adjacent LBMP Load Zones within one Transmission District within which a minimum level of Installed Capacity must be maintained. Local Reliability Rule. A Reliability Rule established by a Transmission Owner, and adopted by the NYSRC to meet specific reliability concerns in limited areas of the NYCA, including without limitation, special conditions and requirements applicable to nuclear plants and special requirements applicable to the New York City metropolitan area. Locational Based Marginal Pricing (“LBMP”). A pricing methodology under which the price of Energy at each location in the NYS Transmission System is equivalent to the cost to supply the next increment of Load at that location (i.e., the short-run marginal cost). The short-run marginal cost takes generation Bid Prices and the physical aspects of the NYS Transmission System into account. The short-run marginal cost also considers the impact of Out-of-Merit Generation (as measured by its Bid Price) resulting from the Congestion and Marginal Losses occurring on the NYS Transmission System which are associated with supplying an increment of Load. The term LBMP also means the price of Energy bought or sold in the LBMP Markets at a specific location.
Reconnection The Parties shall cooperate with each other to restore the Small Generating Facility, Interconnection Facilities, and the New York State Transmission System and Distribution System to their normal operating state as soon as reasonably practicable following a temporary disconnection.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.
CLEANING UP 4.15.1 Before commencement of any on-site activities, Contractor is required to prepare and submit to the Project Manager a Construction Site Waste Reduction Plan. A sample plan is available at: xxxx://xxx.xxx.xxxxx.xx.xx/dec/wastediv/recycling/CandD.htm . Failure to comply with this provision or a failure to comply with the plan itself will result in withholding of general conditions’ money from the contractor’s monthly requisition until Contractor has rectified the situation and is in full compliance with these provisions. 4.15.2 The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At the completion of the Work he shall remove all his waste materials and rubbish from and about. the Project as well as all his tools, construction equipment, machinery and surplus materials and shall leave the premises in a clean and satisfactory condition. 4.15.3 If the Contractor fails to clean up at the completion of the Work, the State may do so as provided in Paragraph 3.4 and the cost thereof shall be charged to the Contractor.
CLEAN UP If Contractor, its agents, employees, or subcontractors perform onsite Services, Contractor, at its cost, will remove all excess materials, equipment, packaging, and garbage within the scope of its performance of Services and leave that portion of the premises in which the work was performed in a clean condition. Should Contractor fail to clean up a Site after completion of work, Purchaser will have the right to remove the materials and set off the cost of clean up against amounts owed to Contractor.
Gaming, betting and lotteries The Hirer shall ensure that nothing is done on or in relation to the premises in contravention of the law relating to gaming, betting and lotteries.