Performance Indicators The HSP’s delivery of the Services will be measured by the following Indicators, Targets and where applicable Performance Standards. In the following table: INDICATOR CATEGORY INDICATOR P=Performance Indicator E=Explanatory Indicator M=Monitoring Indicator 2022/23 Organizational Health and Financial Indicators Debt Service Coverage Ratio (P) 1 ≥1 Total Margin (P) 0 ≥0 Coordination and Access Indicators Percent Resident Days – Long Stay (E) n/a n/a Wait Time from Home and Community Care Support Services (HCCSS) Determination of Eligibility to LTC Home Response (M) n/a n/a Long-Term Care Home Refusal Rate (E) n/a n/a Quality and Resident Safety Indicators Percentage of Residents Who Fell in the Last 30 days (M) n/a n/a Percentage of Residents Whose Pressure Ulcer Worsened (M) n/a n/a Percentage of Residents on Antipsychotics Without a Diagnosis of Psychosis (M) n/a n/a Percentage of Residents in Daily Physical Restraints (M) n/a n/a
Program Goals CalHFA MAC envisions that these monies would be used to complement other federal or lender programs designed specifically to stabilize communities by providing assistance to homeowners who have suffered a financial hardship and as a result are no longer financially able to afford their first-lien mortgage loan payments or their Property Expenses when associated with a Federal Housing Administration (“FHA”) Home Equity Conversion Mortgages (“HECM”) loan, only.
Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference.
Performance Targets Threshold, target and maximum performance levels for each performance measure of the performance period are contained in Appendix B.
Program Objectives Implement a rigorous constructability program following The University of Texas System, Office of Facilities Planning and Construction Constructability Manual. Identify and document project cost and schedule savings (targeted costs are 5% of construction costs). Clarification of project goals, objectives.
Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Performance of the Work The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
Benchmarks 2.1 Benchmarks set forth the overall scope and level of responsibility and the typical duties by which jobs or positions are distinguished and classified under the Classification System. 2.2 Benchmarks also set forth the range or level of qualifications appropriate for a position classified to the level of the benchmark(s). 2.3 Benchmarks do not describe jobs or positions. They are used to classify a wide diversity of jobs by identifying the scope and level of responsibilities.
Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "D", which is attached hereto and forms part of this Agreement.