Scope Verification Sample Clauses

Scope Verification. The A/E shall familiarize itself with the site and review the PPR, Educational Facility Specifications, and Design Standards furnished by HISD to ascertain the requirements of the Project, and shall arrive at a mutual understanding of such requirements with HISD and the PM. The A/E shall consult, to the extent required by HISD, with authorized employees, agents, consultants and/or representatives of HISD relative to the design and construction of the Project, and shall adhere to the furnished design considerations unless otherwise authorized by HISD in writing. The A/E shall verify availability of all utilities necessary for the Project.
AutoNDA by SimpleDocs
Scope Verification. The A/E shall familiarize itself with the site and review the PPR, Educational Facility Specifications, and Design Standards furnished by IISD to ascertain the requirements of a project, and shall arrive at a mutual understanding of such requirements with IISD and the PM. The A/E shall consult, to the extent required by IISD, with authorized employees, agents, consultants and/or representatives of IISD relative to the design and construction of a project, and shall adhere to the furnished design considerations unless otherwise authorized by IISD in writing. The A/E shall verify availability of all utilities necessary for a project.

Related to Scope Verification

  • Medical Verification The Town may require medical verification of an employee’s absence if the Town perceives the employee is abusing sick leave or has used an excessive amount of sick leave. The Town may require medical verification of an employee’s absence to verify that the employee is able to return to work with or without restrictions.

  • Identity Verification In the case that the Subscriber provides telecommunication services to any Subscriber’s Customers pursuant to Section 8.1, the Subscriber is responsible for performing and shall perform personal identification of Subscriber’s Customer. SORACOM shall not bear any responsibility in relation to dealing with such matters.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team will use a third-party vendor for M&V of GHG and energy consumption reductions. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. Products: • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

  • Verification Bank may, from time to time, verify directly with the respective Account Debtors the validity, amount and other matters relating to the Accounts, either in the name of Borrower or Bank or such other name as Bank may choose.

Time is Money Join Law Insider Premium to draft better contracts faster.